{"id":99892,"date":"2019-09-30T20:48:54","date_gmt":"2019-09-30T17:48:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=99892"},"modified":"2019-09-30T21:03:01","modified_gmt":"2019-09-30T18:03:01","slug":"gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Enerjisi ile Tar\u0131msal Sulamaya Ge\u00e7erek Mazot Paras\u0131ndan Kurtuldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/99892\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Ye\u015filova beldesinde ya\u015fayan 34 y\u0131ld\u0131r \u00e7ift\u00e7ilik ile ge\u00e7imini sa\u011flayan Metin \u00dcn\u00fcvar, tarlas\u0131na 38 g\u00fcne\u015f paneliyle elektrik \u00fcretimi ger\u00e7ekle\u015ftiren bir g\u00fcne\u015f enerjisi sistemi kurdurdu. 45 bin liray\u0131 bulan bu sistemle 60 dekarl\u0131k tarlas\u0131ndaki \u00fcr\u00fcnleri sulayan <img loading=\"lazy\" class=\"alignright wp-image-99895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu.jpg\" alt=\"\" width=\"320\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu.jpg 569w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu-500x290.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerjisi-ile-tarimsal-sulamaya-gecerek-mazot-parasindan-kurtuldu-80x46.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00dcn\u00fcvar, sistemin bir sezonda kendi maliyetini amorti edece\u011fini dile getirdi.<\/strong><\/h1>\n<p>Birbirine yak\u0131n toplamda\u00a0<strong>60 dekarl\u0131k<\/strong> arazilerde\u00a0<strong>\u015feker pancar, m\u0131s\u0131r, yonca ve ay\u00e7i\u00e7e\u011fi<\/strong> \u00fcretimi yapan \u00dcn\u00fcvar,&#8221;Artan maliyetlerden dolay\u0131 bu y\u0131l tarlam\u0131za\u00a0<strong>38 adet g\u00fcne\u015f paneliyle bir sistem kurduk. A<\/strong>yn\u0131 anda <strong>60 fiskiyede sulama<\/strong> yapabiliyorum. Bu sezon <strong>60 dekarda pancar ekimi<\/strong> yapt\u0131m. \u00c7ok <strong>\u00fcst\u00fcn verim alaca\u011f\u0131m\u0131z\u0131<\/strong> d\u00fc\u015f\u00fcnmekteyim.\u201d dedi.<\/p>\n<p>Sulama i\u00e7in g\u00fcne\u015f enerjisi sisteminin <strong>45 bin liraya<\/strong> kuruldu\u011funu belirten \u00dcn\u00fcvar, &#8220;E\u011fer trakt\u00f6rle sulama yapmay\u0131 s\u00fcrd\u00fcrseydim mazot gideri yakla\u015f\u0131k 35 bin lira olacakt\u0131. Kurulan bu g\u00fcne\u015f sistemi kendini <strong>1 y\u0131l i\u00e7inde amorti edecektir&#8221;<\/strong>\u00a0ifadelerini de kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ye\u015filova beldesinde ya\u015fayan 34 y\u0131ld\u0131r \u00e7ift\u00e7ilik ile ge\u00e7imini sa\u011flayan Metin \u00dcn\u00fcvar, tarlas\u0131na 38 g\u00fcne\u015f paneliyle elektrik \u00fcretimi ger\u00e7ekle\u015ftiren bir g\u00fcne\u015f enerjisi sistemi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":99895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,44],"tags":[57716,57718,19,52259,18,53157,57712,39384,6926,57715,57713,57711,37540,57719,57714,57717],"views":542,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99892"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=99892"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99892\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/99895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=99892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=99892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=99892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}