{"id":99710,"date":"2019-09-27T10:21:24","date_gmt":"2019-09-27T07:21:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=99710"},"modified":"2019-09-27T10:23:37","modified_gmt":"2019-09-27T07:23:37","slug":"maspo-enerji-nin-ala-2-jes-in-de-faaliyete-gecis-icin-geri-sayim-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/maspo-enerji-nin-ala-2-jes-in-de-faaliyete-gecis-icin-geri-sayim-basladi\/","title":{"rendered":"(Turkish) Maspo Enerji&#8217;nin &#8216;Ala-2 JES&#8217;inde Faaliyete Ge\u00e7i\u015f \u0130\u00e7in Geriye Say\u0131m Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/99710\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Maspo Enerji, 2010 y\u0131l\u0131ndan g\u00fcn\u00fcm\u00fcze jeotermal enerji alan\u0131nda yat\u0131r\u0131mlar\u0131n\u0131 Manisa Ala\u015fehir il\u00e7esinde arama faaliyetleri ve yat\u0131r\u0131mlar\u0131yla h\u0131z kesmeden s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/h1>\n<p>12.650 hektarl\u0131k Jeotermal sahas\u0131 olarak b\u00f6lgenin en b\u00fcy\u00fck ve en verimli ruhsat\u0131na sahip olan 30 MW\u2019l\u0131k ALA-2 JES&#8217;in temelleri <strong>13 Nisan 2017<\/strong>&#8216;de at\u0131lm\u0131\u015f olunup \u00fcretim kuyular\u0131, reenjeksiyon kuyular\u0131 tamamlanm\u0131\u015f, santral sahas\u0131, \u015falt sahas\u0131, enerji nakil hatlar\u0131, \u00fcretim ve reenjeksiyon boru hatlar\u0131, yol ge\u00e7i\u015fleri, omega ge\u00e7i\u015fleri tamamlanma a\u015famas\u0131na gelmi\u015ftir. Jes projesinin bitirmesine y\u00f6nelik ise \u00e7al\u0131\u015fmalar son h\u0131zla devam etmektedir.<\/p>\n<p><strong>Ekim 2019<\/strong> aylar\u0131nda ise \u00fcretime ge\u00e7mesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p><center><iframe loading=\"lazy\" src=\"https:\/\/www.youtube.com\/embed\/XAmH20lVmhE\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/center><br \/>\n&nbsp;<br \/>\n<strong>Daha Fazla Bilgi \u0130\u00e7in:<\/strong>\u00a0<a href=\"http:\/\/www.maspoenerji.com\" target=\"_blank\" rel=\"noopener\">www.maspoenerji.com<\/a> adresini ziyaret edebilirsiniz.<\/p>\n<p>B\u00fc\u015fra ERTA\u015e \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<a href=\"mailto:busra.ertas@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">busra.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Maspo Enerji, 2010 y\u0131l\u0131ndan g\u00fcn\u00fcm\u00fcze jeotermal enerji alan\u0131nda yat\u0131r\u0131mlar\u0131n\u0131 Manisa Ala\u015fehir il\u00e7esinde arama faaliyetleri ve yat\u0131r\u0131mlar\u0131yla h\u0131z kesmeden s\u00fcrd\u00fcr\u00fcyor. 12.650 hektarl\u0131k Jeotermal [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":99712,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[37822,8995,45860,52259,12235,57531,53925,11878,36184,2191,6072,25284],"views":1417,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99710"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=99710"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99710\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/99712"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=99710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=99710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=99710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}