{"id":99651,"date":"2019-09-26T12:20:36","date_gmt":"2019-09-26T09:20:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=99651"},"modified":"2019-09-26T12:25:54","modified_gmt":"2019-09-26T09:25:54","slug":"elektrik-uretim-ve-elektrik-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-uretim-ve-elektrik-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi\/","title":{"rendered":"(Turkish) &#8217;Elk. \u00dcretim ve Depolama Tesisleri Kabul Y\u00f6netmeli\u011fi&#8217; Tasla\u011f\u0131 Yay\u0131mland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/99651\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan &#8216;Elektrik \u00dcretim ve Elektrik Depolama Tesisleri Kabul Y\u00f6netmeli\u011fi&#8217; tasla\u011f\u0131 yay\u0131mland\u0131.<img loading=\"lazy\" class=\"alignright wp-image-99653\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/elk-uretim-ve-elk-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi.jpg\" alt=\"\" width=\"320\" height=\"160\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/elk-uretim-ve-elk-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi.jpg 640w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/elk-uretim-ve-elk-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/elk-uretim-ve-elk-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/elk-uretim-ve-elk-depolama-tesisleri-kabul-yonetmeligi-taslagi-yayimlandi-80x40.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p>Taslak y\u00f6netmeli\u011fi kapsam\u0131nda; elektrik \u00fcretim ve elektrik depolama tesislerinin kabul i\u015flemlerinin ilgili mevzuat ve standartlara uygun olarak yap\u0131lmas\u0131n\u0131, <strong>can, mal<\/strong> ve <strong>saha emniyeti<\/strong> sa\u011flanarak s\u00f6z konusu tesislerin <strong>iletim<\/strong> veya <strong>da\u011f\u0131t\u0131m \u015febekelerine<\/strong> uyumlu olarak ba\u011flanmas\u0131 ile kabul i\u015flemleri yetkisine ili\u015fkin usul ve esaslar\u0131n belirlenmesi yer almaktad\u0131r.<\/p>\n<p><strong>Taslak Y\u00f6netmeli\u011fi \u0130\u00e7in\u00a0<a href=\"https:\/\/www.solar.ist\/wp-content\/uploads\/2019\/09\/Elektrik-U%CC%88retim-ve-Elektrik-Depolama-Tesisleri-Kabul-Yo%CC%88netmelig%CC%86i-Taslag%CC%86%C4%B1.docx\" target=\"_blank\" rel=\"noopener\">&gt;&gt;&gt;<\/a><\/strong><\/p>\n<p><strong>Taslak Y\u00f6netmelik Ekleri \u0130\u00e7in\u00a0<a href=\"https:\/\/www.solar.ist\/wp-content\/uploads\/2019\/09\/Yo%CC%88netmelik-Ekleri.docx\" target=\"_blank\" rel=\"noopener\">&gt;&gt;&gt;<\/a><\/strong><\/p>\n<p><strong>Mevzuat G\u00f6r\u00fc\u015f Bildirme Formu\u00a0<a href=\"https:\/\/www.solar.ist\/wp-content\/uploads\/2019\/09\/Mevzuat-Go%CC%88ru%CC%88s%CC%A7-Bildirme-Formu.docx\" target=\"_blank\" rel=\"noopener\">&gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan &#8216;Elektrik \u00dcretim ve Elektrik Depolama Tesisleri Kabul Y\u00f6netmeli\u011fi&#8217; tasla\u011f\u0131 yay\u0131mland\u0131. Taslak y\u00f6netmeli\u011fi kapsam\u0131nda; elektrik \u00fcretim ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":99654,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[57461,57462,57463,57459,19,42030,1046,52259,18,47575,750,57460,54664],"views":612,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99651"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=99651"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99651\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/99654"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=99651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=99651"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=99651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}