{"id":99472,"date":"2019-09-23T23:10:31","date_gmt":"2019-09-23T20:10:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=99472"},"modified":"2019-09-23T23:25:08","modified_gmt":"2019-09-23T20:25:08","slug":"gunes-enerji-sistemi-yatirimciyi-borclu-cikardi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi\/","title":{"rendered":"(Turkish) &#8217;G\u00fcne\u015f Enerjisi Sistemi&#8217; Yat\u0131r\u0131mc\u0131y\u0131 Bor\u00e7lu \u00c7\u0131kard\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/99472\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>\u0130zmir&#8217;in Seferihisar il\u00e7esinde organik \u00fcr\u00fcnler \u00fcretmek i\u00e7in 1.5 y\u0131l \u00f6nce bir tar\u0131m \u00e7iftli\u011fi kuran <\/strong><strong>\u00d6zg\u00fcr Ya\u011fmuro\u011flu<\/strong><strong>, su ve elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya y\u00f6nelik\u00a0<\/strong><strong>g\u00fcne\u015f enerjisi<\/strong><strong> sistemini kullanmas\u0131ndan sonra\u00a0<\/strong><strong>da\u011f\u0131t\u0131m bedeli<\/strong><strong> olarak kesilen fatura ile hayal k\u0131r\u0131kl\u0131\u011f\u0131 ya\u015fad\u0131.<\/strong><\/h1>\n<p>Kulland\u0131\u011f\u0131 enerjinin fazlas\u0131n\u0131 \u015febekeye ileten ki\u015fi <strong>da\u011f\u0131t\u0131m bedeli<\/strong> olarak <strong>5.300 TL<\/strong> bedel \u00f6demek zorunda kald\u0131.<\/p>\n<h2><strong><img loading=\"lazy\" class=\"alignright wp-image-99475\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi.jpg\" alt=\"\" width=\"320\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi.jpg 831w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi-300x176.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi-768x451.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi-500x294.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/gunes-enerji-sistemi-yatirimciyi-borclu-cikardi-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Sistem Fayda De\u011fil Zarar Getirdi<\/strong><\/h2>\n<p>Kulland\u0131klar\u0131 <strong>\u00e7ift y\u00f6nl\u00fc saya\u00e7<\/strong> sayesinde \u015febekeye ne kadar elektrik verdiklerinin kay\u0131t alt\u0131na al\u0131nd\u0131\u011f\u0131n\u0131 ifade eden Ya\u011fmuro\u011flu, \u00f6zellikle yaz aylar\u0131nda g\u00fcne\u015fin daha erken do\u011fmas\u0131na ba\u011fl\u0131 olarak enerji \u00fcretiminin <strong>4000 kilovat<\/strong> saatlere \u00e7\u0131kt\u0131\u011f\u0131na vurgu yapt\u0131. T\u00fcketimlerinin ise <strong>1500 kilovat<\/strong> civar\u0131nda oldu\u011funu dile getiren Ya\u011fmuro\u011flu, <span style=\"text-decoration: underline;\">\u015fu ifadeleri kulland\u0131:<\/span><\/p>\n<p>&#8220;Bahar ve yaz aylar\u0131nda \u00fcretimimiz fazla iken t\u00fcketimimiz az. Bana enerji verdi\u011fim i\u00e7in \u00f6deme yap\u0131lmas\u0131 laz\u0131m. Ancak \u015febekeye sundu\u011fumuz enerji i\u00e7in bir te\u015fekk\u00fcr beklerken bizi hayal k\u0131r\u0131kl\u0131\u011f\u0131na u\u011fratan bir faturayla kar\u015f\u0131la\u015ft\u0131k. Bir y\u0131l\u0131n sonunda b\u00f6lgesel da\u011f\u0131t\u0131m \u015firketi arac\u0131l\u0131\u011f\u0131yla bize ula\u015ft\u0131r\u0131lan faturada fazla enerjiyi sisteme yayd\u0131\u011f\u0131m\u0131z i\u00e7in da\u011f\u0131t\u0131m bedeli istendi. \u0130ki ayr\u0131 fatura ile bizden toplam 5 bin 300 liral\u0131k bir bedel talep ediliyor. Yani bu sistem bize fayda de\u011fil zarar getirdi. Da\u011f\u0131t\u0131m \u015firketine gidip ba\u015fvurunca s\u00f6zle\u015fmemizi kaybettiklerini \u00f6\u011frendim. Benden s\u00f6zle\u015fmenin fotokopisini ald\u0131lar. Ancak hen\u00fcz itiraz\u0131m\u0131zla ilgili bir yan\u0131t almad\u0131k. Avukat\u0131m arac\u0131l\u0131\u011f\u0131yla \u00a0hukuki \u00a0sureci \u00a0ba\u015flatt\u0131k&#8221; dedi.<\/p>\n<p>Sistemin tamam\u0131n\u0131 kendi \u00f6z sermayeleriyle kurduklar\u0131n\u0131 ve hi\u00e7bir destek almad\u0131klar\u0131n\u0131 vurgulayan Ya\u011fmuro\u011flu. Fazla enerjiyi \u015febekeye veriyoruz. Ba\u015fka t\u00fcketiciler kullan\u0131yor ve biz bunun i\u00e7in da\u011f\u0131t\u0131m bedeli \u00f6demek durumunda b\u0131rak\u0131l\u0131yoruz. Bizden \u00fcretti\u011fimiz fazla enerjiyi bedelsiz al\u0131yor, ba\u015fkas\u0131na bedeliyle sat\u0131yorlar. O t\u00fcketicilerden de iletim da\u011f\u0131t\u0131m bedeli al\u0131yorlar bizden de al\u0131yorlar. Konuyla ilgili Enerji Piyasas\u0131 D\u00fczenleme Kurumu&#8217;nun (EPDK) bir y\u00f6netmeli\u011fi var. Y\u00f6netmelik ne yaz\u0131k ki \u00fcreticiyi de\u011fil da\u011f\u0131t\u0131m \u015firketlerini kolluyor ifadelerini kulland\u0131.<\/p>\n<p>Dervi\u015f KORKMAZ \u2013 F\u0131rat \u00dcniversitesi \/ Elk. -Elektronik M\u00fchendisi \u2013\u00a0<a href=\"mailto:dkorkmaz164@gmail.com\">dkorkmaz164@gmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130zmir&#8217;in Seferihisar il\u00e7esinde organik \u00fcr\u00fcnler \u00fcretmek i\u00e7in 1.5 y\u0131l \u00f6nce bir tar\u0131m \u00e7iftli\u011fi kuran \u00d6zg\u00fcr Ya\u011fmuro\u011flu, su ve elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya y\u00f6nelik\u00a0g\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":99475,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[14445,17423,56151,42024,32885,19,1046,52259,18,750,57306,3155,57304,57307,2689,57305,25567],"views":999,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99472"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=99472"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99472\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/99475"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=99472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=99472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=99472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}