{"id":99405,"date":"2019-09-22T15:57:15","date_gmt":"2019-09-22T12:57:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=99405"},"modified":"2019-09-22T16:18:13","modified_gmt":"2019-09-22T13:18:13","slug":"10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip\/","title":{"rendered":"(Turkish) 10 Ya\u015f\u0131na Basan &#8216;Band\u0131rma RES&#8217; LEED Gold Sertifikal\u0131 Kontrol Binas\u0131na Sahip!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/99405\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>R\u00fczgar enerjisinde T\u00fcrkiye\u2019nin \u00f6nc\u00fc ve lider kurulu\u015flar\u0131ndan Borusan EnBW Enerji\u2019nin ilk hizmete soktu\u011fu r\u00fczgar enerji santrali olan Band\u0131rma RES 10 y\u0131ld\u0131r T\u00fcrkiye i\u00e7in ye\u015fil enerji \u00fcretiyor. Band\u0131rma RES\u2019in 10\u2019uncu ya\u015f\u0131 \u00f6zel bir etkinlikle kutlan\u0131rken, \u00e7al\u0131\u015fanlar\u0131n ve \u00e7ocuklar\u0131n\u0131n isimleri tesisin t\u00fcrbinlerine verildi. <\/strong><\/h1>\n<p><strong>20 Eyl\u00fcl 2019, \u0130stanbul. <\/strong>Portf\u00f6y\u00fcn\u00fcn tamam\u0131 yenilenebilir enerji kaynaklar\u0131ndan olu\u015fan ve r\u00fczg\u00e2r enerjisinde lider olma hedefiyle \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcren Borusan EnBW Enerji, ilk r\u00fczg\u00e2r enerjisi \u00fcretim <img loading=\"lazy\" class=\"alignright wp-image-99410\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip-2.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip-2.jpg 731w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip-2-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/10-yasina-basan-bandirma-res-leed-gold-sertifikali-kontrol-binasina-sahip-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>tesisi olan Band\u0131rma RES <strong>10\u2019uncu ya\u015f\u0131n\u0131<\/strong> kutluyor. Bu vesileyle d\u00fczenlenen \u00f6zel etkinli\u011fe \u00e7al\u0131\u015fanlar ve aileleriyle <strong>Borusan EnBW Enerji<\/strong> \u00fcst y\u00f6netimi kat\u0131ld\u0131. Tesisteki 29 t\u00fcrbine \u00e7al\u0131\u015fanlar\u0131n ve \u00e7ocuklar\u0131n\u0131n isimleri verildi.<\/p>\n<h1><strong>Band\u0131rma RES T\u00fcrkiye\u2019ye hizmet ediyor<\/strong><\/h1>\n<p>y\u0131l\u0131n\u0131 dolduran Band\u0131rma RES\u2019in do\u011fum g\u00fcn\u00fc, Band\u0131rma RES \u00e7al\u0131\u015fanlar\u0131, Borusan EnBW Enerji \u00fcst y\u00f6netimi ve t\u00fcrbinlere isimleri verilen \u00e7al\u0131\u015fanlar ve aileleriyle kutland\u0131. T\u00fcrbinlere isimleri verilenler aileleriyle birlikte isimlerinin yazd\u0131\u011f\u0131 t\u00fcrbinler \u00f6n\u00fcnde hat\u0131ra foto\u011fraflar\u0131 \u00e7ektirdi.<\/p>\n<p><strong>Borusan EnBW<\/strong> Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla etkinlikte yapt\u0131\u011f\u0131 <span style=\"text-decoration: underline;\">konu\u015fmada \u015funlar\u0131 s\u00f6yledi:<\/span><\/p>\n<p>\u201cT\u00fcrkiye\u2019nin 18\u2019inci r\u00fczg\u00e2r enerji santrali olarak \u00fclkemizin hizmetine sundu\u011fumuz Band\u0131rma RES bug\u00fcne dek 2,3 milyar kWh elektrik \u00fcreterek 950.000 hanenin y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lad\u0131. 91,1 MW kurulu g\u00fcc\u00fc olan tesisimizle y\u0131lda yakla\u015f\u0131k 300 milyon kWh elektrik enerjisi \u00fcreterek 120.000 hanenin y\u0131ll\u0131k elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131l\u0131yoruz. B\u00f6ylece y\u0131ll\u0131k yakla\u015f\u0131k 165 bin ton karbon sal\u0131m\u0131n\u0131 engelliyoruz. Bu bak\u0131mdan T\u00fcrkiye\u2019ye \u00e7ok \u00f6nemli bir hizmet sunuyoruz. Bu ba\u015far\u0131 ekip olarak ortaya koydu\u011fumuz \u00fcst\u00fcn \u00e7al\u0131\u015fman\u0131n sonucudur. \u015eirketimizde ba\u015flatt\u0131\u011f\u0131m\u0131z \u201cAd\u0131n R\u00fczg\u00e2r T\u00fcrbininde Ya\u015fas\u0131n\u201d uygulamam\u0131z kapsam\u0131nda 3 y\u0131l\u0131n\u0131 dolduran \u00e7al\u0131\u015fanlar\u0131m\u0131z\u0131n kendi adlar\u0131n\u0131 ya da diledikleri takdirde \u00e7ocuklar\u0131n\u0131n isimlerini t\u00fcrbinlerimize veriyoruz. \u015eimdiye kadar \u015firket \u00e7ap\u0131nda 120, bu tesisimizde ise 29 t\u00fcrbinimize bu \u015fekilde isim verdik. Bu isimler tarihe d\u00fc\u015f\u00fclen birer kay\u0131tt\u0131r. Daha ayd\u0131nl\u0131k ve temiz bir gelecek i\u00e7in ortak hedefimize birlikte y\u00fcr\u00fcd\u00fc\u011f\u00fcm\u00fcz bu yolda, b\u00fct\u00fcn \u00e7al\u0131\u015fma arkada\u015flar\u0131m\u0131zla gurur duyuyor ve yar\u0131nlara g\u00fcvenle bak\u0131yoruz.\u201d<\/p>\n<p>T\u00fcrkiye\u2019nin ilk LEED Gold Sertifikal\u0131 RES tesis kontrol binas\u0131na sahip olan Band\u0131rma RES T\u00fcrkiye\u2019nin en b\u00fcy\u00fck enerji ve \u00e7evre fuar\u0131 ICCI kapsam\u0131nda d\u00fczenlenen ICCI 2011 Enerji Oscar \u00d6d\u00fclleri\u2019nde Yenilenebilir Enerji alan\u0131nda R\u00fczg\u00e2r kategorisinde Oscar \u00d6d\u00fcl\u00fc\u2019ne de lay\u0131k g\u00f6r\u00fcld\u00fc.<\/p>\n<h2><strong>Enerji sekt\u00f6r\u00fcnde bir ba\u015far\u0131 \u00f6yk\u00fcs\u00fc: Borusan EnBW Enerji<\/strong><\/h2>\n<p>Band\u0131rma RES\u2019i T\u00fcrkiye enerji sekt\u00f6r\u00fcn\u00fcn hizmetine sunan Borusan EnBW Enerji bu y\u0131l 10\u2019uncu y\u0131l\u0131n\u0131 kutluyor. 10 y\u0131lda toplam kurulu g\u00fcc\u00fcn\u00fc 45 MW\u2019tan 505 MW d\u00fczeyine \u00e7\u0131kartarak tam 11 kat b\u00fcy\u00fcyen \u015firket T\u00fcrkiye\u2019nin yenilenebilir kaynaklar\u0131n\u0131 geli\u015ftirirken, do\u011fal kaynaklar\u0131n ve \u00e7evrenin korunmas\u0131na da \u00f6nemli katk\u0131lar yap\u0131yor.<\/p>\n<p>Halen 11 yenilenebilir enerji tesisi ve toplam 1.150 MW d\u00fczeyinde portf\u00f6y\u00fc bulunan Borusan EnBW Enerji Eyl\u00fcl 2009 \u2013 Haziran 2019 aras\u0131nda 6,6 milyar kWh enerji \u00fcreterek toplam 2,5 milyon hanenin y\u0131ll\u0131k elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lad\u0131. \u015eirketin 2018 y\u0131l\u0131ndaki \u00fcretimi ise 1,4 milyar kWh d\u00fczeyinde ger\u00e7ekle\u015fti. Halen yat\u0131r\u0131m a\u015famas\u0131nda, finansmanlar\u0131 sa\u011flanm\u0131\u015f, 210 MW\u2019l\u0131k iki RES projesi bulunuyor.<\/p>\n<p>Yap\u0131lan ihalelerden kazand\u0131\u011f\u0131 ve sat\u0131n ald\u0131\u011f\u0131 t\u00fcm projeleri izin s\u00fcre\u00e7lerinin tamamlanmas\u0131n\u0131 takiben h\u0131zla devreye alan Borusan EnBW Enerji, yenilenebilir enerji sekto\u0308ru\u0308nu\u0308n ciddi yat\u0131r\u0131mc\u0131lar\u0131 aras\u0131nda yer al\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. R\u00fczgar enerjisinde T\u00fcrkiye\u2019nin \u00f6nc\u00fc ve lider kurulu\u015flar\u0131ndan Borusan EnBW Enerji\u2019nin ilk hizmete soktu\u011fu r\u00fczgar enerji santrali olan Band\u0131rma RES 10 y\u0131ld\u0131r T\u00fcrkiye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":99408,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[16602,12706,14225,19,6222,52259,10003,57243,18,26559,57240,9645,57238,3413,12707,57241,35002,57239,233,35004,53282,57237,36999,46175,34977,793,26829,57242,2907],"views":611,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99405"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=99405"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/99405\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/99408"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=99405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=99405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=99405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}