{"id":98795,"date":"2019-09-12T19:54:15","date_gmt":"2019-09-12T16:54:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=98795"},"modified":"2019-09-12T22:36:07","modified_gmt":"2019-09-12T19:36:07","slug":"orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi\/","title":{"rendered":"(Turkish) &#8217;ORK\u00d6Y PV&#8217; Projesinde \u00c7at\u0131 \u0130halesinin Evrak Teslim S\u00fcresi 24 Eyl\u00fcl\u2019e Uzat\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/98795\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>ORK\u00d6Y PV Projesi kapsam\u0131nda k\u00f6ylerin \u00e7at\u0131 tipi g\u00fcne\u015f enerjisinden faydalanmas\u0131n\u0131 sa\u011flayacak olan ikinci a\u015fama \u00e7al\u0131\u015fmalar\u0131 devam ediyor. UNDP T\u00fcrkiye taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, \u00e7at\u0131 ihalesine y\u00f6nelik evrak teslim s\u00fcresinin 24 Eyl\u00fcl saat 17:30\u2019a kadar uzat\u0131larak soru-cevaplar\u0131n ise web sitesinde yay\u0131nland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><\/h1>\n<p>Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 (UNDP) T\u00fcrkiye\u2019nin, Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu <img loading=\"lazy\" class=\"alignright size-medium wp-image-98797\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/orkoy-pv-projesinde-cati-ihalesinin-evrak-teslim-suresi-24-eylule-uzatildi.jpg 651w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>T\u00fcrkiye B\u00f6l\u00fcm\u00fc G\u00dcNDER ile ortak y\u00fcr\u00fctt\u00fc\u011f\u00fc Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimi \u0130\u00e7in S\u00fcrd\u00fcr\u00fclebilir Enerji Finans Mekanizmas\u0131 (ORK\u00d6Y PV) Projesi kapsam\u0131nda saha kurulumlar\u0131n\u0131n 2&#8217;inci ad\u0131m\u0131 olarak, belirlenen k\u00f6ylerdeki hane halk\u0131n\u0131n \u00e7at\u0131lar\u0131na muhtelif g\u00fc\u00e7lerde G\u00fcne\u015f Enerji Santrali kurulmas\u0131 planlan\u0131yor.<\/p>\n<h2><strong>\u201cSon Teklif G\u00fcn\u00fc 24 Eyl\u00fcl 2019\u201d<\/strong><\/h2>\n<p>S\u00f6z konusu \u00e7at\u0131 kurulumlar\u0131na y\u00f6nelik tekliflerin <strong>24 Eyl\u00fcl 2019<\/strong> tarihine kadar <strong>UNDP T\u00fcrkiye<\/strong>\u2019ye iletilmesi gerekiyor. Teklif i\u00e7eri\u011fi, gerekli izinleri al\u0131n\u0131p \u00e7a\u011fr\u0131 mektubu ba\u015fvurusunun yap\u0131lmas\u0131 i\u015flemi ile ba\u015flay\u0131p ge\u00e7ici kabul al\u0131nmas\u0131 ile tamamlanacakt\u0131r. \u00c7at\u0131 projelerinde\u00a0<strong>A\u2019dan Z\u2019ye anahtar teslim kurulum<\/strong> yap\u0131lacak.<\/p>\n<h2><strong>Detayl\u0131 bilgi ve soru-cevap b\u00f6l\u00fcm\u00fcne\u00a0<a href=\"http:\/\/procurement-notices.undp.org\/view_notice.cfm?notice_id=58260\">buradan<\/a>\u00a0ula\u015fabilirsiniz.<\/strong><\/h2>\n<p>Belirlenen <span style=\"text-decoration: underline;\">b\u00f6lgeler;<\/span><\/p>\n<table width=\"908\">\n<tbody>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>\u00c7orum Province Osmanc\u0131k Subprovince Gecek Village<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">41 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\"><\/td>\n<td width=\"526\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>Bolu Province G\u00f6yn\u00fck Subprovince Aksaklar, Da\u011fhac\u0131lar, Da\u011f\u015feyhler, G\u00fcney\u00e7al\u0131ca and Tekirler Villages<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">10 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,0 kW AC<\/td>\n<td width=\"526\">10 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,8 kW AC<\/td>\n<td width=\"526\">8 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">3,2 kW AC<\/td>\n<td width=\"526\">2 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\"><\/td>\n<td width=\"526\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>Manisa Province Sar\u0131g\u00f6l Subprovince Karacaali, K\u0131z\u0131l\u00e7ukur and Alem\u015fahl\u0131 Villages<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">5 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,0 kW AC<\/td>\n<td width=\"526\">12 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,8 kW AC<\/td>\n<td width=\"526\">12 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">3,2 kW AC<\/td>\n<td width=\"526\">2 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\"><\/td>\n<td width=\"526\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>Elaz\u0131\u011f Province Merkez Subprovince Sar\u0131g\u00fcl and Ba\u011flarca Village<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">20 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,0 kW AC<\/td>\n<td width=\"526\">5 Units<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ORK\u00d6Y PV Projesi kapsam\u0131nda k\u00f6ylerin \u00e7at\u0131 tipi g\u00fcne\u015f enerjisinden faydalanmas\u0131n\u0131 sa\u011flayacak olan ikinci a\u015fama \u00e7al\u0131\u015fmalar\u0131 devam ediyor. UNDP T\u00fcrkiye taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":98797,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[55424,56663,56657,56662,54946,56661,36029,52259,1382,36334,12474,38941,50910,56660,56656,17901,54948],"views":429,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98795"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=98795"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98795\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/98797"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=98795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=98795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=98795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}