{"id":98292,"date":"2019-09-04T14:06:22","date_gmt":"2019-09-04T11:06:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=98292"},"modified":"2019-09-04T14:29:54","modified_gmt":"2019-09-04T11:29:54","slug":"nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi\/","title":{"rendered":"(Turkish) &#8217;Nordex&#8217;ten Al\u0131nan \u2018N133\u2019 T\u00fcrbinleri \u0130\u015fko\u00e7ya\u2019n\u0131n Be\u011fenisini Kazand\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/98292\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Nordex Grup, Lockerbie\u2019nin Kuzeydo\u011fusunda yer alan 13 km uzakl\u0131ktaki \u0130sko\u00e7ya\u2019n\u0131n \u2018Crossdykes\u2019 projesi i\u00e7in yeni yat\u0131r\u0131mc\u0131s\u0131 &#8216;Murhaill Enerji&#8217; firmas\u0131ndan sipari\u015f alarak 10 adet N133\/4.8 r\u00fczgar t\u00fcrbini tedarik etti.\u00a0 Nordex Grup\u2019un, 2018\u2019in bahar d\u00f6neminde piyasaya sundu\u011fu Delta4000\u2019in \u00fcretimindeki g\u00fc\u00e7l\u00fc r\u00fczgar varyant segmentinin ilk sipari\u015fi olan t\u00fcrbinlerle r\u00fczgar santralinin yap\u0131m \u00e7al\u0131\u015fmalar\u0131 2019 y\u0131l\u0131nda ba\u015flayacak olup proje \u00e7er\u00e7evesinde 20 y\u0131ll\u0131k bak\u0131m ve servis hizmetini ise yine Nordex sa\u011flayacakt\u0131r.<\/strong><\/h1>\n<p>4.8 MW\u2019l\u0131k kapasiteye sahip r\u00fczgar t\u00fcrbinleri, y\u00fcksek kurulum kapasiteleriyle kule y\u00fcksekliklerinin 110 metre ve iyi r\u00fczgar profiline sahip olmalar\u0131ndan dolay\u0131 \u2018Muirhall Enerji\u2019 devlet fonu olmadan r\u00fczgar<\/p>\n<h1><strong><img loading=\"lazy\" class=\"alignright wp-image-98294\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi-300x174.jpg\" alt=\"\" width=\"320\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi-500x291.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/nordexten-siparis-edilen-n133-turbinleri-iskocyanin-begenisini-kazandi.jpg 597w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p>\u00e7iftli\u011fini de tek ba\u015f\u0131na y\u00f6netebilecektir. 2020\u2019de \u2018Crossdykes projesi\u2019 tamamland\u0131ktan sonra\u00a0 45 bin\u00a0 hanenin elektrik ihtiyac\u0131 temiz enerji ile kar\u015f\u0131lanacakt\u0131r.<\/p>\n<p>Nordex Grup CEO\u2019su Patci Landa proje hakk\u0131nda yapt\u0131\u011f\u0131 a\u00e7\u0131klamada; r\u00fczgar \u00e7iftli\u011fine y\u00f6nelik devletten herhangi bir finansal destek al\u0131nmadan i\u015fletilecek oldu\u011funu ve \u00e7ok iyi b\u00f6lgede en son teknolojilerin kullan\u0131larak r\u00fczgar enerjisinden elde edilen elektrik \u00fcretiminin ise konvansiyonel enerji kaynaklar\u0131 ile yar\u0131\u015fabilece\u011fini dile getirdi.<\/p>\n<p>\u2018Muirhall Enerji\u2019 y\u00f6netim direkt\u00f6r\u00fc Chris Walker ise; \u201c\u0130ngiltere\u2019de ge\u00e7erli hale gelen ilk s\u00fcbvansiyonsuz geli\u015fmelerden birisi olacak olan bu proje i\u00e7in in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flayacak olmaktan mutluluk duymaktay\u0131z. Bu durum \u015firket olarak yapt\u0131\u011f\u0131m\u0131z i\u015flerin g\u00fczel bir kan\u0131t\u0131d\u0131r. Ayn\u0131 zamanda proje i\u00e7in planlar\u0131m\u0131z\u0131 tamamlarken Nordex Grup gibi t\u00fcm partnerlerimizde gerekli esnekli\u011fi g\u00f6sterdiler.\u201d ifadelerine yer verdi.<\/p>\n<p>\u2018Muirhall Enerji\u2019 ile imzalanan hizmet anla\u015fmas\u0131 kapsam\u0131nda \u00fcretime dayal\u0131 kullan\u0131labilirlikle ba\u011flant\u0131l\u0131 olup r\u00fczgar \u00e7iftli\u011fi operat\u00f6r\u00fc i\u00e7in \u00fcretim a\u00e7\u0131s\u0131ndan g\u00fcvenlikte sa\u011flamaktad\u0131r. Bu da r\u00fczgara ba\u011fl\u0131 olarak Nordex i\u00e7in \u00f6nleyici bak\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131n da ger\u00e7ekle\u015ftirmesini m\u00fcmk\u00fcn k\u0131lmaktad\u0131r.<\/p>\n<p>Zeynep TEKER \u2013 \u0130T\u00dc \/ \u00c7evre M\u00fchendisi \u2013\u00a0<a href=\"mailto:zeynep.teker@enerjigazetesi.ist\"><strong>zeynep.teker@enerjigazetesi.ist<\/strong><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Nordex Grup, Lockerbie\u2019nin Kuzeydo\u011fusunda yer alan 13 km uzakl\u0131ktaki \u0130sko\u00e7ya\u2019n\u0131n \u2018Crossdykes\u2019 projesi i\u00e7in yeni yat\u0131r\u0131mc\u0131s\u0131 &#8216;Murhaill Enerji&#8217; firmas\u0131ndan sipari\u015f alarak 10 adet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":98294,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[56164,48105,56172,56167,56169,19,52259,18,13297,7728,870,56171,56165,56166,2455,36186,56170,56168,35002,52137,7958,35004,52689,56163,34977,26829,48106],"views":554,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98292"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=98292"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98292\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/98294"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=98292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=98292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=98292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}