{"id":98168,"date":"2019-09-02T23:37:24","date_gmt":"2019-09-02T20:37:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=98168"},"modified":"2019-09-03T00:31:58","modified_gmt":"2019-09-02T21:31:58","slug":"finlandiya-dan-vestas-a-iki-ticari-projeye-yonelik-60-mw-lik-siparis","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/finlandiya-dan-vestas-a-iki-ticari-projeye-yonelik-60-mw-lik-siparis\/","title":{"rendered":"(Turkish) Finlandiya&#8217;dan Vestas&#8217;a \u0130ki Ticari Projeye Y\u00f6nelik 60 MW\u2019l\u0131k Sipari\u015f"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/98168\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Vestas, \u0130ngiliz yat\u0131r\u0131mc\u0131 Infracapital destekli, Nordik geli\u015ftirici OX2 firmas\u0131 ile Finlandiya da do\u011frudan finansal destek al\u0131nmadan ticari esasl\u0131 ger\u00e7ekle\u015ftirilecek olan Kr\u00f6puln ve Storbacken r\u00fczgar projesi i\u00e7in sipari\u015f ald\u0131. Projenin toplam kapasitesi 60 MW olurken g\u00fc\u00e7 \u00fcretimini maksimuma ula\u015ft\u0131rmaya y\u00f6nelik b\u00f6lgede \u00f6zel r\u00fczgar \u015fartlar\u0131 baz al\u0131narak G\u00fc\u00e7 Optimizasyon <img loading=\"lazy\" class=\"alignright wp-image-98170\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/vestas-3-300x218.jpg\" alt=\"\" width=\"320\" height=\"232\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/vestas-3-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/vestas-3-500x363.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/vestas-3-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/09\/vestas-3.jpg 590w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Mod\u2019una sahip V150-4.2 MW t\u00fcrbinler yer alacakt\u0131r.<\/strong><\/h1>\n<p><span style=\"text-decoration: underline;\">Anla\u015fma ko\u015fullar\u0131<\/span>; temin, kurulum ve r\u00fczgar t\u00fcrbinlerini i\u015fletmeye alma s\u00fcrecini kapsamakta olup ayr\u0131ca 30 y\u0131ll\u0131k servis anla\u015fmas\u0131 ve t\u00fcrbin aksama s\u00fcresini d\u00fc\u015f\u00fcrmeye y\u00f6nelik enerji \u00e7\u0131k\u0131\u015f\u0131n\u0131 optimize etmek i\u00e7in VestasOnline Business SCADA \u00e7\u00f6z\u00fcm\u00fc de yer almaktad\u0131r.<\/p>\n<p>R\u00fczgar t\u00fcrbinlerinin teslimi 2021 y\u0131l\u0131n\u0131n 2&#8217;inci \u00e7eyre\u011finde ba\u015flayacak olup 2021\u2019nin 3&#8217;\u00fcnc\u00fc \u00e7eyre\u011finde i\u015fletmeye al\u0131nmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>&#8216;OX2&#8217; CEO\u2019su Paul Stormoen ise yapt\u0131\u011f\u0131 a\u00e7\u0131klamada Vestas&#8217;\u0131n Nordik s\u00fcbvansiyonsuz bir pazar i\u00e7in \u00e7ok uygun t\u00fcrbinler ve servis yap\u0131lar\u0131 geli\u015ftirdi\u011fini ve bu proje ile OX2 ve Vestas aras\u0131nda ki uzun s\u00fcreli ili\u015fkiyi g\u00fc\u00e7lendirmekten \u00e7ok mutlu olduklar\u0131n\u0131 ifade etti.<\/p>\n<p>Zeynep TEKER \u2013 \u0130T\u00dc \/ \u00c7evre M\u00fchendisi \u2013\u00a0<a href=\"mailto:zeynep.teker@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">zeynep.teker@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Vestas, \u0130ngiliz yat\u0131r\u0131mc\u0131 Infracapital destekli, Nordik geli\u015ftirici OX2 firmas\u0131 ile Finlandiya da do\u011frudan finansal destek al\u0131nmadan ticari esasl\u0131 ger\u00e7ekle\u015ftirilecek olan Kr\u00f6puln ve [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":98170,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[1330,48105,42030,21919,52259,47575,12654,56001,56002,55994,55999,870,56000,55998,55993,55996,35002,38581,56004,35004,52689,36999,34977,56003,4734,55997,56005,55995,105,26829,48106],"views":458,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98168"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=98168"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98168\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/98170"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=98168"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=98168"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=98168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}