{"id":98015,"date":"2019-08-30T23:30:03","date_gmt":"2019-08-30T20:30:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=98015"},"modified":"2019-08-30T23:43:24","modified_gmt":"2019-08-30T20:43:24","slug":"karakecili-enerji-bursaya-biyogaz-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;Karake\u00e7ili Enerji&#8217; Bursa&#8217;ya Biyogaz Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/98015\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Karake\u00e7ili Biyogaz Enerji ve G\u00fcbre \u00dcretim Ticaret Sanayi A.\u015e. taraf\u0131ndan\u00a0Bursa&#8217;n\u0131n, Karacabey \u0130l\u00e7esinde 3,080 MWm\/3,002 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-98017\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak-1024x576.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/karakecili-enerji-bursaya-biyogaz-santrali-kuracak.jpg 1920w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>MWe g\u00fcc\u00fc olmas\u0131 \u00f6ng\u00f6r\u00fclen &#8220;Karake\u00e7ili Biyogaz Enerji Santrali&#8221;nin yap\u0131lmas\u0131 planlan\u0131yor.<\/strong><\/h1>\n<p>Firma, kurulum s\u00fcresi boyunca projeye y\u00f6nelik \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) Y\u00f6netmeli\u011finin 9&#8217;uncu maddesi gere\u011fince a\u015fa\u011f\u0131da yer alan tarih ve saatte faaliyetle ilgili halk\u0131 bilgilendirmek, g\u00f6r\u00fc\u015f ve \u00f6nerilerini almak i\u00e7in &#8220;Halk\u0131n Kat\u0131l\u0131m Toplant\u0131s\u0131&#8221; yapacakt\u0131r.<\/p>\n<p><strong>12 Eyl\u00fcl 2019 Per\u015fembe\u00a0<\/strong>saat <strong>13:30<\/strong>\u2019da planlanan toplant\u0131 <strong>Karasu Mahalle Kahvehanesi<\/strong>\u2019nde yap\u0131lacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Karake\u00e7ili Biyogaz Enerji ve G\u00fcbre \u00dcretim Ticaret Sanayi A.\u015e. taraf\u0131ndan\u00a0Bursa&#8217;n\u0131n, Karacabey \u0130l\u00e7esinde 3,080 MWm\/3,002 MWe g\u00fcc\u00fc olmas\u0131 \u00f6ng\u00f6r\u00fclen &#8220;Karake\u00e7ili Biyogaz Enerji Santrali&#8221;nin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":98017,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[45787,55849,958,55844,55845,19,23311,18,55846,55848,55778,55843,55842,55847,34977,26829],"views":856,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98015"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=98015"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/98015\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/98017"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=98015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=98015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=98015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}