{"id":97502,"date":"2019-08-21T14:46:31","date_gmt":"2019-08-21T11:46:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=97502"},"modified":"2019-08-21T14:50:01","modified_gmt":"2019-08-21T11:50:01","slug":"ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti\/","title":{"rendered":"(Turkish) &#8217;GE Yenilenebilir Enerji&#8217;nin \u00dcretim Tesisi 500\u2019\u00fcnc\u00fc Kanad\u0131n\u0131 \u00dcretti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/97502\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>GE Yenilenebilir Enerji, bug\u00fcn yapt\u0131\u011f\u0131 a\u00e7\u0131klamayla LM Wind Power\u2019\u0131n T\u00fcrkiye\u2019de \u0130zmir\u2019in Bergama il\u00e7esinde yer alan ve iki y\u0131ld\u0131r faaliyette olan yeni r\u00fczg\u00e2r t\u00fcrbini kanad\u0131 \u00fcretim tesisinde, 500\u2019\u00fcnc\u00fc r\u00fczg\u00e2r t\u00fcrbini kanad\u0131n\u0131 \u00fcretti\u011fini duyurdu. T\u00fcrkiye, Avrupa ve Asya da d\u00e2hil olmak \u00fczere d\u00fcnya genelinde art\u0131\u015f g\u00f6steren r\u00fczg\u00e2r enerjisi talebine yan\u0131t vermesi amac\u0131yla \u00fcretilen 500 adet kanad\u0131n, toplamda yakla\u015f\u0131k 500 MW kapasitede enerji \u00fcretecek kadar r\u00fczg\u00e2r toplamas\u0131 bekleniyor. Bu da T\u00fcrkiye\u2019deki yakla\u015f\u0131k 680.000 evin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya yetecek bir enerji kapasitesine kar\u015f\u0131l\u0131k gelmektedir.<\/strong><\/h1>\n<p>LM Wind Power, T\u00fcrkiye i\u00e7in verdi\u011fi 50 milyon dolar yat\u0131r\u0131m taahh\u00fcd\u00fcn\u00fcn bir par\u00e7as\u0131 olarak Bergama fabrikas\u0131nda 2019 y\u0131l\u0131n\u0131n sonuna kadar 30 milyon dolarl\u0131k ek yat\u0131r\u0131m yaparak tesisi b\u00fcy\u00fctme ve 300 yeni <img loading=\"lazy\" class=\"alignright size-medium wp-image-97505\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti1-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti1-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti1-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti1-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti1-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/ge-yenilenebilir-enerjinin-uretim-tesisi-500uncu-kanadini-uretti1.jpg 867w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>personel istihdam etme karar\u0131 ald\u0131. Tesisi b\u00fcy\u00fctme projesi, 2019 y\u0131l\u0131n\u0131n Nisan ay\u0131nda ba\u015flad\u0131. Bu proje ile fabrikan\u0131n GE\u2019nin en yeni 5MW kara tipi r\u00fczg\u00e2r t\u00fcrbini Cypress platformuna monte edilecek yenilik\u00e7i iki par\u00e7al\u0131 kanatlar\u0131n \u00fcretimine haz\u0131r hale getirilmesi hedefleniyor. \u015eu anda Bergama tesislerinde y\u00fczde 26\u2019s\u0131 kad\u0131n olmak \u00fczere 450 personel \u00e7al\u0131\u015f\u0131yor ve bu rakam 2020\u2019de 700\u2019\u00fcn \u00fczerine \u00e7\u0131kacak.<\/p>\n<p>Bergama Fabrika M\u00fcd\u00fcr\u00fc Ozan Mamay, konuyla ilgili \u015funlar\u0131 ifade etti: <em>\u201cSon iki y\u0131l boyunca bu tesiste \u00e7al\u0131\u015fan ekibimizin ortaya koydu\u011fu ba\u015far\u0131dan gurur duyuyoruz ve tesisin devaml\u0131 olarak b\u00fcy\u00fcd\u00fc\u011f\u00fcn\u00fc g\u00f6rmekten dolay\u0131 mutluyuz. Cypress kara tipi r\u00fczg\u00e2r teknolojisi, T\u00fcrkiye\u2019de ve d\u00fcnyada elektrik maliyetlerini d\u00fc\u015f\u00fcrmek i\u00e7in \u00e7ok uygun ve biz de Bergama\u2019daki tesislerimizde bu teknolojiye ait devrim niteli\u011findeki iki par\u00e7al\u0131 kanatlar\u0131 \u00fcretmenin heyecan\u0131n\u0131 ya\u015f\u0131yoruz.\u201d <\/em><\/p>\n<p>LM Wind Power\u2019\u0131n Bergama fabrikas\u0131, \u015firketin geli\u015fmekte olan r\u00fczg\u00e2r enerjisi piyasalar\u0131ndaki ba\u015far\u0131l\u0131 deneyimi ve k\u00fcresel etkisi ile LM Wind Power\u2019\u0131n d\u00fcnyan\u0131n her yerindeki m\u00fc\u015fterilerine eksiksiz olarak hizmet verebilme kapasitesini g\u00fc\u00e7lendiriyor. Bergama fabrikas\u0131 ayn\u0131 zamanda yerel r\u00fczg\u00e2r \u00e7iftliklerine kanat temin ederek ve nitelikli i\u015fler yaratarak h\u0131zla b\u00fcy\u00fcyen T\u00fcrkiye r\u00fczg\u00e2r end\u00fcstrisinin ihtiya\u00e7lar\u0131na da cevap veriyor.<\/p>\n<p>Resmi olarak Temmuz 2017\u2019de a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan Bergama tesisi, LM Wind Power\u2019\u0131n toplamda on be\u015finci fabrikas\u0131 olmas\u0131n\u0131n yan\u0131 s\u0131ra \u015firketin GE Yenilenebilir Enerji b\u00fcnyesine kat\u0131lmas\u0131n\u0131n ard\u0131ndan a\u00e7t\u0131\u011f\u0131 ilk fabrika olma \u00f6zelli\u011fini de ta\u015f\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE Yenilenebilir Enerji, bug\u00fcn yapt\u0131\u011f\u0131 a\u00e7\u0131klamayla LM Wind Power\u2019\u0131n T\u00fcrkiye\u2019de \u0130zmir\u2019in Bergama il\u00e7esinde yer alan ve iki y\u0131ld\u0131r faaliyette olan yeni r\u00fczg\u00e2r [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":97504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[30063,55364,53552,19,52259,18,19897,31843,55361,35002,55363,24949,55362,35004,52689,324,6813,55360],"views":347,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97502"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=97502"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97502\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/97504"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=97502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=97502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=97502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}