{"id":97336,"date":"2019-08-19T10:15:45","date_gmt":"2019-08-19T07:15:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=97336"},"modified":"2019-08-19T10:19:25","modified_gmt":"2019-08-19T07:19:25","slug":"megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor\/","title":{"rendered":"(Turkish) &#8217;Megapack&#8217; \u0130le Saatte 3 MW Enerji Depolamas\u0131 Yap\u0131l\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/97336\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Tesla&#8217;n\u0131n &#8216;Megapack&#8217; \u00e7ift y\u00f6nl\u00fc invert\u00f6rlerinde 3 MWh\u2019a kadar saatte enerji depolayabilirken \u00fcr\u00fcn\u00a0<\/strong><strong>termal y\u00f6netim sistemi, AC ana kesici ve kontrolleri \u00f6zelliklerini de i\u00e7ermektedir.\u00a0<\/strong><strong>1,5 MW\u2019l\u0131k invert\u00f6r kapasitesiyle\u00a0Megapack&#8217;\u0131n 1 GWh\u2019den daha b\u00fcy\u00fck projelerde kullan\u0131labilece\u011fi de ifade edilmektedir.<\/strong><\/h1>\n<h2><strong><img loading=\"lazy\" class=\"wp-image-97338 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor-300x167.jpg\" alt=\"\" width=\"320\" height=\"178\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor-768x427.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor-500x278.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/megapack-ile-saatte-3-mw-enerji-depolamasi-yapiliyor.jpg 878w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h2>\n<p><strong>Tesla&#8217;n\u0131n Mepack\u2019in\u00a0<\/strong>mevcut enerji depolama sistemlerine g\u00f6re 10 kat daha az bile\u015fenden meydana gelerek %40 daha az yer kaplamakta ve 10 kat daha h\u0131zl\u0131 \u015fekilde kurulumu yap\u0131lmaktad\u0131r. (\u00d6rn: 250 d\u00f6n\u00fcme sahip bir alanda 3 aydan \u00e7ok k\u0131sa bir s\u00fcrede 250 MW\/1 GWh g\u00fcc\u00fcnde bir enerji santrali kurulmu\u015ftur.)<\/p>\n<h2><strong>Megapack, Do\u011fal gaz&#8217;a Cazip Bir Alternatif<\/strong><\/h2>\n<p><strong>Tesla yapt\u0131\u011f\u0131 a\u00e7\u0131klamada Megapack\u2019in\u00a0<\/strong>tesis \u00f6l\u00e7ekli tesisatlar i\u00e7in do\u011fal gaz destekli enerji santrallerine s\u00fcrd\u00fcr\u00fclebilir bir alternatif olaca\u011f\u0131na vurgu yap\u0131larak Pacific Pacific ve Electric Co (PG&amp;E) \u015firketinin kurulumunu yapt\u0131\u011f\u0131 California\u2019da yer alan Moss Landing projesi buna \u00f6rnek verilmektedir.<\/p>\n<p><strong>Tesla,\u00a0<\/strong>2019&#8217;un 2&#8217;inci \u00e7eyre\u011finde 6.4 milyar dolar gelir sa\u011flarken bunun 368 milyon dolarl\u0131k k\u0131sm\u0131n\u0131 ise<strong>\u00a0enerji \u00fcretim ve depolama sistemlerinden <\/strong>elde etmi\u015ftir.<\/p>\n<p><strong>Tesla &#8216;Megapack&#8217; Detayl\u0131 \u00dcr\u00fcn Bilgisi \u0130\u00e7in:<\/strong>\u00a0<a href=\"https:\/\/www.tesla.com\/blog\/introducing-megapack-utility-scale-energy-storage?redirect=no\" target=\"_blank\" rel=\"noopener\">https:\/\/www.tesla.com\/blog\/introducing-megapack-utility-scale-energy-storage?redirect=no<\/a> adresini ziyaret edebilirsiniz.<\/p>\n<p>Sarp ALTINEL \/ Enerji Gazetesi &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tesla&#8217;n\u0131n &#8216;Megapack&#8217; \u00e7ift y\u00f6nl\u00fc invert\u00f6rlerinde 3 MWh\u2019a kadar saatte enerji depolayabilirken \u00fcr\u00fcn\u00a0termal y\u00f6netim sistemi, AC ana kesici ve kontrolleri \u00f6zelliklerini de i\u00e7ermektedir.\u00a01,5 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":97338,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,49],"tags":[30983,55185,55183,19,2625,21919,42286,52259,55186,18,55181,55184,55182,30503,37032,19437],"views":495,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97336"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=97336"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97336\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/97338"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=97336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=97336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=97336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}