{"id":97092,"date":"2019-08-13T00:36:46","date_gmt":"2019-08-12T21:36:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=97092"},"modified":"2019-08-13T00:40:36","modified_gmt":"2019-08-12T21:40:36","slug":"bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak\/","title":{"rendered":"(Turkish) &#8217;BP&#8217; \u00c7inli \u015eirket \u0130le Elektrikli Ara\u00e7 \u015earj \u0130stasyonu Kurulumu Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/97092\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>\u0130ngiliz petrol devi BP, \u00c7inli telefonla taksi \u00e7a\u011f\u0131rma platformu Didi Chuxing ortakl\u0131\u011f\u0131yla elektrikli ara\u00e7 \u015farj istasyonlar\u0131 kurulumu <img loading=\"lazy\" class=\"alignright size-medium wp-image-97094\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/bp-cinli-sirket-ile-elektrikli-arac-sarj-istasyonu-kurulumu-yapacak.jpg 651w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>yapacak.<\/strong><\/h1>\n<p>Didi Chuxing (DiDi), British Petroleum (BP) ile \u00c7in\u2019in yan\u0131 s\u0131ra \u015firketin faaliyet g\u00f6sterdi\u011fi di\u011fer \u00fclkelerde yeni enerjili ara\u00e7lar i\u00e7in \u015farj istasyonlar\u0131 olu\u015fturma ve i\u015fletme amac\u0131yla bir giri\u015fim geli\u015ftirdi\u011fini a\u00e7\u0131klad\u0131.<\/p>\n<p>BP\u2019nin G\u00fcney \u00c7in kenti Guangzhou\u2019da kurdu\u011fu ilk \u015farj istasyonu \u015fu anda deneme operasyonuna y\u00f6nelik Didi\u2019nin \u015farj platformuna ba\u011flan\u0131rken\u00a0yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, ortak \u015firket kurulduktan sonra \u015farj istasyonlar\u0131n\u0131n in\u015fa ve i\u015fletme s\u00fcrecine h\u0131z verilece\u011fi a\u00e7\u0131kland\u0131.<\/p>\n<p><strong>Kaynak: <\/strong><a href=\"https:\/\/techcrunch.com\/2019\/07\/31\/didi-chuxing-and-oil-giant-bp-team-up-to-build-electric-vehicle-charging-infrastructure-in-china\/\" target=\"_blank\" rel=\"noopener\">T<\/a><a href=\"https:\/\/techcrunch.com\/2019\/07\/31\/didi-chuxing-and-oil-giant-bp-team-up-to-build-electric-vehicle-charging-infrastructure-in-china\/\" target=\"_blank\" rel=\"noopener\">echcrunch\u00a0<\/a>&#8211; <a href=\"http:\/\/www.elder.org.tr\/ebulten\/bulten231.html#haber10\" target=\"_blank\" rel=\"noopener\">Elder \/ A\u011fustos 2019<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130ngiliz petrol devi BP, \u00c7inli telefonla taksi \u00e7a\u011f\u0131rma platformu Didi Chuxing ortakl\u0131\u011f\u0131yla elektrikli ara\u00e7 \u015farj istasyonlar\u0131 kurulumu yapacak. Didi Chuxing (DiDi), British [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":97094,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,157],"tags":[54969,54964,886,54966,54963,54967,54965,52259,41219,16242,54968],"views":1072,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97092"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=97092"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97092\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/97094"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=97092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=97092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=97092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}