{"id":97058,"date":"2019-08-12T22:33:43","date_gmt":"2019-08-12T19:33:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=97058"},"modified":"2019-08-12T22:35:40","modified_gmt":"2019-08-12T19:35:40","slug":"orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi\/","title":{"rendered":"(Turkish) &#8217;ORK\u00d6Y PV Projesi&#8217;ne Y\u00f6nelik 2&#8217;nci A\u015fama \u0130\u00e7in Teklif \u00c7a\u011fr\u0131s\u0131 Yay\u0131mland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/97058\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>&#8216;ORK\u00d6Y PV Projesi&#8217; kapsam\u0131nda k\u00f6ylerin \u00e7at\u0131 tipi g\u00fcne\u015f enerjisinden faydalanmas\u0131n\u0131 sa\u011flayacak olan 2&#8217;inci a\u015fama \u00e7al\u0131\u015fmalar\u0131na ba\u015flan\u0131yor.<img loading=\"lazy\" class=\"alignright wp-image-97060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi-300x225.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/orkoy-pv-projesine-yonelik-2nci-asama-icin-teklif-cagrisi-yayimlandi.jpg 651w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p>Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 (UNDP) T\u00fcrkiye\u2019nin, Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu T\u00fcrkiye B\u00f6l\u00fcm\u00fc G\u00dcNDER ile ortak y\u00fcr\u00fctt\u00fc\u011f\u00fc Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimi \u0130\u00e7in S\u00fcrd\u00fcr\u00fclebilir Enerji Finans Mekanizmas\u0131 (ORK\u00d6Y PV) Projesi kapsam\u0131nda saha kurulumlar\u0131n\u0131n 2&#8217;inci ad\u0131m\u0131 olarak, belirlenen k\u00f6ylerdeki hane halk\u0131n\u0131n \u00e7at\u0131lar\u0131na muhtelif g\u00fc\u00e7lerde G\u00fcne\u015f Enerji Santrali kurulmas\u0131 planlan\u0131yor.<\/p>\n<h2><strong>&#8220;Son Teklif G\u00fcn\u00fc 03 Eyl\u00fcl 2019&#8221;<\/strong><\/h2>\n<p>S\u00f6z konusu \u00e7at\u0131 kurulumlar\u0131na y\u00f6nelik tekliflerin 3 Eyl\u00fcl 2019 tarihine kadar UNDP T\u00fcrkiye\u2019ye iletilmesi gerekiyor. Teklif i\u00e7eri\u011fi, gerekli izinleri al\u0131n\u0131p \u00e7a\u011fr\u0131 mektubu ba\u015fvurusunun yap\u0131lmas\u0131 i\u015flemi ile ba\u015flay\u0131p ge\u00e7ici kabul al\u0131nmas\u0131 ile sona erecek. \u00c7at\u0131 projeleri, A\u2019dan Z\u2019ye anahtar teslim kurulum yap\u0131lacak.<\/p>\n<p><strong>Detayl\u0131 <a href=\"http:\/\/procurement-notices.undp.org\/view_notice.cfm?notice_id=58260\" target=\"_blank\" rel=\"noopener\">Bilgi \u0130\u00e7in TIKLAYINIZ &gt;&gt;&gt;<\/a><\/strong><\/p>\n<p>Belirlenmi\u015f <span style=\"text-decoration: underline;\">olan b\u00f6lgeler;<\/span><\/p>\n<table width=\"908\">\n<tbody>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>\u00c7orum Province Osmanc\u0131k Subprovince Gecek Village<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">41 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\"><\/td>\n<td width=\"526\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>Bolu Province G\u00f6yn\u00fck Subprovince Aksaklar, Da\u011fhac\u0131lar, Da\u011f\u015feyhler, G\u00fcney\u00e7al\u0131ca and Tekirler Villages<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">10 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,0 kW AC<\/td>\n<td width=\"526\">10 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,8 kW AC<\/td>\n<td width=\"526\">8 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">3,2 kW AC<\/td>\n<td width=\"526\">2 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\"><\/td>\n<td width=\"526\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>Manisa Province Sar\u0131g\u00f6l Subprovince Karacaali, K\u0131z\u0131l\u00e7ukur and Alem\u015fahl\u0131 Villages<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">5 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,0 kW AC<\/td>\n<td width=\"526\">12 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,8 kW AC<\/td>\n<td width=\"526\">12 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">3,2 kW AC<\/td>\n<td width=\"526\">2 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\"><\/td>\n<td width=\"526\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"908\">\n<h2><strong>Elaz\u0131\u011f Province Merkez Subprovince Sar\u0131g\u00fcl and Ba\u011flarca Village<\/strong><\/h2>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">1,2 kW AC<\/td>\n<td width=\"526\">20 Units<\/td>\n<\/tr>\n<tr>\n<td width=\"382\">2,0 kW AC<\/td>\n<td width=\"526\">5 Units<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. &#8216;ORK\u00d6Y PV Projesi&#8217; kapsam\u0131nda k\u00f6ylerin \u00e7at\u0131 tipi g\u00fcne\u015f enerjisinden faydalanmas\u0131n\u0131 sa\u011flayacak olan 2&#8217;inci a\u015fama \u00e7al\u0131\u015fmalar\u0131na ba\u015flan\u0131yor. Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 (UNDP) T\u00fcrkiye\u2019nin, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":97060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[2219,51126,54946,19,52259,1382,53901,23416,5982,12474,34925,23131,54945,50908,38941,54947,50911,34977,1383,2218,54948,26829],"views":434,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97058"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=97058"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/97058\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/97060"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=97058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=97058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=97058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}