{"id":96930,"date":"2019-08-06T21:30:57","date_gmt":"2019-08-06T18:30:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=96930"},"modified":"2019-08-06T21:42:35","modified_gmt":"2019-08-06T18:42:35","slug":"yeni-yapilara-kesintisiz-enerji-zirvesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeni-yapilara-kesintisiz-enerji-zirvesi\/","title":{"rendered":"(Turkish) Yeni Yap\u0131lara Kesintisiz Enerji Zirvesi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/96930\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>D\u00fcnyan\u0131n mega kentleri aras\u0131nda yer alan ve her ge\u00e7en g\u00fcn b\u00fcy\u00fcyen \u0130stanbul\u2019un Avrupa Yakas\u0131\u2019na elektrik da\u011f\u0131t\u0131m hizmeti veren Bo\u011fazi\u00e7i Elektrik Da\u011f\u0131t\u0131m A.\u015e. (BEDA\u015e), yeni yap\u0131lar\u0131n ihtiyac\u0131 olan elektrik altyap\u0131s\u0131 i\u00e7in ilgili t\u00fcm taraflarla 1 A\u011fustos\u2019ta bir araya geldi.\u00a0<\/strong><strong>Toplant\u0131da sisteme yeni ba\u011flanacak konut, ticarethane ve sanayi kurulu\u015flar\u0131n\u0131n ihtiyac\u0131 olan elektrik tesisat projelerinin mevzuatlara g\u00f6re haz\u0131rlanmas\u0131 ba\u015fta olmak \u00fczere trafo yeri ihtiyac\u0131, ruhsat ve yer sorunlar\u0131n\u0131n a\u015f\u0131lmas\u0131 i\u00e7in yap\u0131lmas\u0131 gerekenlere kadar bir\u00e7ok konu ele al\u0131nd\u0131.<\/strong><\/h1>\n<p>\u0130stanbul Avrupa Yakas\u0131\u2019nda 5 milyondan fazla elektrik abonesi bulunan BEDA\u015e\u2019\u0131n abone say\u0131s\u0131 her y\u0131l 150-180 bin civar\u0131nda art\u0131yor. Elektrik da\u011f\u0131t\u0131m sistemine yeni ba\u011flanacak abonelerine \u00e7ok daha h\u0131zl\u0131 <img loading=\"lazy\" class=\"alignright size-medium wp-image-96932\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/yeni-yapilara-kesintisiz-enerji-zirvesi1-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/yeni-yapilara-kesintisiz-enerji-zirvesi1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/yeni-yapilara-kesintisiz-enerji-zirvesi1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/yeni-yapilara-kesintisiz-enerji-zirvesi1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/yeni-yapilara-kesintisiz-enerji-zirvesi1-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/08\/yeni-yapilara-kesintisiz-enerji-zirvesi1.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>hizmet vermek ve ihtiya\u00e7 duyulan yat\u0131r\u0131mlar\u0131 yapmak \u00fczere \u00e7al\u0131\u015fmalar\u0131na aral\u0131ks\u0131z devam eden BEDA\u015e, bu alandaki payda\u015flar\u0131 ile \u00f6zel bir toplant\u0131 d\u00fczenledi. 1 A\u011fustos Per\u015fembe g\u00fcn\u00fc BEDA\u015e\u2019\u0131n \u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi \u00c7\u0131rp\u0131c\u0131 Sosyal Tesisleri\u2019nde ger\u00e7ekle\u015ftirilen toplant\u0131da; \u0130stanbul Avrupa Yakas\u0131\u2019nda elektrik da\u011f\u0131t\u0131m sistemine ba\u011flanacak konut, ticarethane ve sanayi yap\u0131lar\u0131ndan olu\u015fan yeni tesislerin, elektrik i\u00e7 tesisat projelerinin mevzuatlara g\u00f6re haz\u0131rlanmas\u0131, incelenmesi, trafo yat\u0131r\u0131m projelerinin ruhsat a\u015famas\u0131nda kontrol edilmesi gibi konular ele al\u0131nd\u0131. BEDA\u015e Genel M\u00fcd\u00fcr\u00fc Murat Yi\u011fit\u2019in ev sahipli\u011finde yap\u0131lan toplant\u0131ya \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc, \u0130stanbul Valili\u011fi, Avrupa Yakas\u0131\u2019nda hizmet veren belediye ve yap\u0131 denetim firmas\u0131 yetkililerinden olu\u015fan yakla\u015f\u0131k 250 ki\u015fi kat\u0131ld\u0131.<\/p>\n<p><strong>\u2018MA\u011eDUR\u0130YET YA\u015eANMAMASI \u0130\u00c7\u0130N HEP B\u0130RL\u0130KTE \u00c7ALI\u015eMALIYIZ\u2019<\/strong><\/p>\n<p>Toplant\u0131da yapt\u0131\u011f\u0131 konu\u015fmada \u2018enerji taleplerine ili\u015fkin yat\u0131r\u0131m planlar\u0131n\u0131n zaman\u0131nda ve do\u011fru yap\u0131lmas\u0131n\u0131n\u2019 \u00f6nemine dikkat \u00e7eken BEDA\u015e Genel M\u00fcd\u00fcr\u00fc Murat Yi\u011fit, \u201cSanayi ve ticari yat\u0131r\u0131mlar\u0131n ba\u015fkenti olan \u0130stanbul\u2019umuza ve t\u00fcm kullan\u0131c\u0131lar\u0131m\u0131za daha kaliteli ve daha modern bir yap\u0131 ile elektrik tedarik etmeyi hedefliyoruz. Enerji talebinde bulunan kullan\u0131c\u0131lar\u0131n, ma\u011fduriyet ya\u015famamas\u0131 i\u00e7in talepleri k\u0131sa s\u00fcrede kar\u015f\u0131lamak, tedarik s\u00fcreklili\u011finde ticari kalitenin sa\u011flanmas\u0131 ve enerjilendirme sonras\u0131 ar\u0131za ve kesintinin ya\u015fanmamas\u0131, teknik kriter ve kalitenin hakim oldu\u011fu bir m\u00fchendislik sa\u011flanmas\u0131 i\u00e7in hep birlikte \u00e7al\u0131\u015fmal\u0131y\u0131z\u201d dedi. Her y\u0131l 150-180 bin aras\u0131nda yeni aboneye hizmet verdiklerini an\u0131msatan Yi\u011fit, \u201cKesintisiz ve kaliteli elektrik da\u011f\u0131t\u0131m hizmeti vermek \u00fczere \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 y\u00fcr\u00fct\u00fcrken yeni tesis talepleri bizler i\u00e7in b\u00fcy\u00fck \u00f6nem ta\u015f\u0131yor. Do\u011fru planlama i\u00e7in projelerin yap\u0131 denetim kurulu\u015flar\u0131 taraf\u0131ndan onaylanmadan \u00f6nce BEDA\u015e M\u00fc\u015fteri Operasyonlar\u0131 Merkezi\u2019ne de g\u00f6nderilmesi gerekiyor. Zaten mevcut y\u00f6netmelik ve mevzuatlar da bunu \u00f6ng\u00f6r\u00fcyor\u201d de\u011ferlendirmesinde bulundu.<\/p>\n<p><strong>\u2018PROJELER MEVZUAT VE STANDARTLARA UYGUN OLMALI\u2019<\/strong><\/p>\n<p>BEDA\u015e M\u00fc\u015fteri Operasyonlar\u0131 Direkt\u00f6r\u00fc Bekir Bulut da konuyla ilgili olarak yapt\u0131\u011f\u0131 sunumda hatal\u0131 projeler nedeniyle ya\u015fanan sorunlar\u0131 ve yap\u0131lmas\u0131 gerekenleri \u015f\u00f6yle \u00f6zetledi:<\/p>\n<p>\u201cHatal\u0131 projeler sebebiyle tesisat muayene a\u015famas\u0131nda sorunlar ya\u015fanmakta olup abonelik s\u00fcre\u00e7leri uzamakta ve do\u011fal olarak bu da m\u00fc\u015fteri memnuniyetine olumsuz yans\u0131makta. Ne yaz\u0131k ki zaman zaman proje \u00e7izimlerinde kolon \u015femalar\u0131nda ruhsatta belirtilen ba\u011f\u0131ms\u0131z b\u00f6l\u00fcm say\u0131s\u0131ndan farkl\u0131 say\u0131da tesisat ve saya\u00e7 g\u00f6steriliyor. Yine devre kesiciler projede yanl\u0131\u015f yerlerde olabiliyor. Ruhsatta otopark, asans\u00f6r ya da yang\u0131n tesisat\u0131 yokken projede var gibi g\u00f6sterilebiliyor. Vatanda\u015flar\u0131m\u0131z\u0131n sorun ya\u015famamas\u0131 i\u00e7in proje kapa\u011f\u0131nda adres, il\u00e7e, mahalle, pafta, ada, parsel, kullan\u0131m amac\u0131, kurulu g\u00fc\u00e7, talep g\u00fcc\u00fc, ba\u011f\u0131ms\u0131z b\u00f6l\u00fcm say\u0131s\u0131 gibi bilgiler mutlaka yer almal\u0131. Elektrik projesinin i\u00e7erisinde binan\u0131n vaziyet plan\u0131 ve mimar\u0131 kesitlerini g\u00f6sterir bir plan da olmal\u0131. Proje \u00e7izimleri mutlaka topraklama y\u00f6netmeli\u011fine uygun \u00e7izilmeli ve temel topraklama detaylar\u0131 ve hesaplamalar\u0131 projede bulunmal\u0131. Yine kablo renk se\u00e7imi mutlaka standartlara uygun olmal\u0131.\u201d<\/p>\n<p><strong>\u2018HATALI PROJELER S\u00dcRE\u00c7LER\u0130 UZATIYOR\u2019<\/strong><\/p>\n<p>Toplant\u0131 sonras\u0131nda hatal\u0131 projeler nedeniyle muayene a\u015famas\u0131nda sorunlar ya\u015fand\u0131\u011f\u0131n\u0131n alt\u0131 \u00e7izilirken bunun abonelik s\u00fcre\u00e7lerini uzatt\u0131\u011f\u0131 ve m\u00fc\u015fteri memnuniyetsizli\u011fi yaratt\u0131\u011f\u0131 ifade edildi. S\u00fcre\u00e7 koordinasyonu sa\u011flanmas\u0131 durumunda m\u00fc\u015fteri ve payda\u015f memnuniyeti sa\u011flanaca\u011f\u0131 ve daha k\u0131sa s\u00fcrede abonelik i\u015flemlerinin tamamlanaca\u011f\u0131na dikkat \u00e7ekildi. Geni\u015f kat\u0131l\u0131m sa\u011flanan ve iki b\u00f6l\u00fcm halinde yap\u0131lan toplant\u0131da kat\u0131l\u0131mc\u0131lar i\u015fbirli\u011fi s\u00fcrecinin devam etmesi gerekti\u011fi konusunda g\u00f6r\u00fc\u015f birli\u011fine vard\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. D\u00fcnyan\u0131n mega kentleri aras\u0131nda yer alan ve her ge\u00e7en g\u00fcn b\u00fcy\u00fcyen \u0130stanbul\u2019un Avrupa Yakas\u0131\u2019na elektrik da\u011f\u0131t\u0131m hizmeti veren Bo\u011fazi\u00e7i Elektrik Da\u011f\u0131t\u0131m A.\u015e. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":96933,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[1506,54830,54831,8058,34979,19638,34980,54832,26353,54828,54829,54833,32927],"views":961,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96930"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=96930"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96930\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/96933"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=96930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=96930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=96930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}