{"id":96630,"date":"2019-07-29T14:34:25","date_gmt":"2019-07-29T11:34:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=96630"},"modified":"2019-07-29T14:38:24","modified_gmt":"2019-07-29T11:38:24","slug":"ing-kuracagi-gunes-santrali-ile-elektriginin-yuzde-30-unu-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ing-kuracagi-gunes-santrali-ile-elektriginin-yuzde-30-unu-karsilayacak\/","title":{"rendered":"(Turkish) &#8217;ING&#8217; Kuraca\u011f\u0131 G\u00fcne\u015f Santrali \u0130le Elektri\u011finin % 30\u2019unu Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/96630\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>ING T\u00fcrkiye,\u00a0s\u00fcrd\u00fcr\u00fclebilirlik anlay\u0131\u015f\u0131yla fark yaratacak bir projeye imza atarak <\/strong><strong>Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131<\/strong> <strong>Merkezi\u2019nin \u00e7at\u0131s\u0131na g\u00fcne\u015f enerjisi santrali kuruyor. <\/strong><strong>Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131<\/strong> <strong>Merkezi\u2019nin \u00e7at\u0131s\u0131nda 2000 m2&#8217;lik alanda kurulacak santral, 9 ay i\u00e7inde faaliyete ge\u00e7ecek. Bu yenilenebilir enerji yat\u0131r\u0131m\u0131 sayesinde ING <\/strong><strong>Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131<\/strong> <strong>Merkezi\u2019nde kullan\u0131lan elektri\u011fin y\u00fczde 30\u2019u g\u00fcne\u015ften \u00fcretilecek. ING T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc P\u0131nar Abay, karbon ayak izini azaltacak bu yat\u0131r\u0131m ile s\u00fcrd\u00fcr\u00fclebilirlik yolunda \u00f6rnek bir projeye imza att\u0131klar\u0131 i\u00e7in gurur duyduklar\u0131n\u0131 s\u00f6yledi.\u00a0<\/strong><\/h1>\n<p>ING Grubu\u2019nun s\u00fcrd\u00fcr\u00fclebilir ve sorumlu bankac\u0131l\u0131k anlay\u0131\u015f\u0131na paralel faaliyet g\u00f6steren ING T\u00fcrkiye, Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131 Merkezi\u2019nin \u00e7at\u0131s\u0131na g\u00fcne\u015f enerjisi santrali kurmak i\u00e7in harekete ge\u00e7ti. ING T\u00fcrkiye, \u00e7at\u0131da yer alan 2 bin metrekarelik alanda kurulacak santral ile Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131 Merkezi\u2019nde t\u00fcketilen elektri\u011fin y\u00fczde 30\u2019unu kar\u015f\u0131lamay\u0131 \u00f6ng\u00f6r\u00fcyor. Yenilenebilir <img loading=\"lazy\" class=\"alignright wp-image-96632\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak-298x300.jpg\" alt=\"\" width=\"320\" height=\"323\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak-298x300.jpg 298w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak-397x400.jpg 397w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak-100x100.jpg 100w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ing-kuracagi-gunes-santrali-ile-elektriginin-30unu-karsilayacak.jpg 484w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>enerjiye yat\u0131r\u0131m yaparak karbon ayak izini azaltacak olan ING T\u00fcrkiye, bu s\u00fcrd\u00fcr\u00fclebilirlik projesiyle t\u00fcketti\u011fi toplam elektri\u011fin ise y\u00fczde 3\u2019\u00fcnde ye\u015fil enerji kullan\u0131m\u0131n\u0131 garanti etmi\u015f olacak.\u00a0Birle\u015fmi\u015f Milletler (UN) Global Compact T\u00fcrkiye S\u00fcrd\u00fcr\u00fclebilir Bankac\u0131l\u0131k ve Finans \u00c7al\u0131\u015fma Grubu \u00fcyesi olan\u00a0ING T\u00fcrkiye, Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131 Merkezi \u00c7at\u0131 G\u00fcne\u015f Enerjisi Santrali projesini 9 ay i\u00e7inde tamamlayarak \u00fcretime ge\u00e7irmeyi hedefliyor.<\/p>\n<p>S\u00fcrd\u00fcr\u00fclebilirlik konusunda d\u00fcnyada \u00f6nc\u00fc ad\u0131mlar atan ING Grubu, 2018 y\u0131l\u0131nda iklim finansman\u0131 i\u00e7in 16.5 milyar Euro kaynak yaratt\u0131. 2020 y\u0131l\u0131nda bu rakam\u0131 30 milyar Euro seviyesine \u00e7\u0131karmay\u0131 hedefleyen Grup, kendi y\u00f6netti\u011fi s\u00fcrd\u00fcr\u00fclebilir varl\u0131klar\u0131n toplam de\u011ferini de 6.5 milyar Euro seviyesine y\u00fckseltti. Buna ek olarak, ING Grubu, s\u00fcrd\u00fcr\u00fclebilirlik konusunda ad\u0131m atan firmalara uygun faizli kaynak sa\u011flad\u0131 ve ilgili startup\u2019lar\u0131 desteklemek i\u00e7in de 100 milyon Euro\u2019luk fon ay\u0131rd\u0131.<\/p>\n<h2><strong>ING T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc P\u0131nar Abay: \u201cS\u00fcrd\u00fcr\u00fclebilirlik yolunda \u00f6rnek bir projeye imza atm\u0131\u015f olmaktan \u00e7ok mutluyuz\u201d<\/strong><\/h2>\n<p>ING Grubu\u2019nun 2015 Paris Anla\u015fmas\u0131\u2019nda imzas\u0131 oldu\u011funu vurgulayan\u00a0<strong>ING T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc P\u0131nar Abay<\/strong>, s\u00fcrd\u00fcr\u00fclebilirlik yolunda \u00f6rnek bir projeye imza at\u0131yor olmaktan \u00e7ok mutlu olduklar\u0131n\u0131 vurgulad\u0131. P\u0131nar Abay, \u015funlar\u0131 s\u00f6yledi: \u201cING, faaliyet g\u00f6sterdi\u011fi \u00fclkelerde s\u00fcrd\u00fcr\u00fclebilir bankac\u0131l\u0131k konusunda \u00f6nc\u00fc kurulu\u015flar aras\u0131nda yer al\u0131yor. ING T\u00fcrkiye olarak biz de s\u00fcrd\u00fcr\u00fclebilirlik kapsam\u0131nda \u00f6nemli ad\u0131mlar at\u0131yor, \u00e7evre duyarl\u0131l\u0131\u011f\u0131 y\u00fcksek projeleri \u00f6zellikle takip edip destekliyoruz. Yenilenebilir enerji alan\u0131ndaki yat\u0131r\u0131mlar\u0131n desteklenmesi de g\u00fcndemimizde. Bu paralelde Kahramanmara\u015f\u2019ta yer alan Operasyon Merkezimizin \u00e7at\u0131s\u0131nda yapaca\u011f\u0131m\u0131z yenilenebilir enerji tesisi ile toplumsal, etik ve \u00e7evresel vizyonumuz \u0131\u015f\u0131\u011f\u0131nda fark yaratacak bir projeye imza atm\u0131\u015f olmaktan gurur duyuyoruz. ING T\u00fcrkiye olarak s\u00fcrd\u00fcr\u00fclebilirlik hedefiyle sekt\u00f6rde \u00f6rnek olacak projelere imza atmaya devam edece\u011fiz.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ING T\u00fcrkiye,\u00a0s\u00fcrd\u00fcr\u00fclebilirlik anlay\u0131\u015f\u0131yla fark yaratacak bir projeye imza atarak Kahramanmara\u015f Operasyon ve \u00c7a\u011fr\u0131 Merkezi\u2019nin \u00e7at\u0131s\u0131na g\u00fcne\u015f enerjisi santrali kuruyor. Kahramanmara\u015f Operasyon ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":96632,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[52259,21768,679,54495,54492,54493,10842,54494,37032,34977,26829],"views":587,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96630"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=96630"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96630\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/96632"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=96630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=96630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=96630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}