{"id":96506,"date":"2019-07-27T00:52:45","date_gmt":"2019-07-26T21:52:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=96506"},"modified":"2019-07-27T00:55:18","modified_gmt":"2019-07-26T21:55:18","slug":"teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi\/","title":{"rendered":"(Turkish) TE\u0130A\u015e&#8217;tan T\u00fcrkiye\u2019nin 10 Y\u0131ll\u0131k Elektrik \u00dcretim Kapasitesi Plan\u0131 A\u00e7\u0131klamas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/96506\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>TE\u0130A\u015e taraf\u0131ndan yay\u0131nlanan 5 ve 10 Y\u0131ll\u0131k (2024-2029) B\u00f6lgesel Ba\u011flanabilir Kapasite Raporu\u2019nda yer alan hesaplamalara g\u00f6re, 2024 sonuna kadar 20.818 MW, 2029 sonuna kadar da 6.453 MW olmak \u00fczere 15 iletim b\u00f6lgesinin 9\u2019unda toplamda 27.271 MW b\u00f6lgesel kapasite sa\u011flanacak.<\/strong><\/h1>\n<p>B\u00f6lgesel kapasitelerin olu\u015fmad\u0131\u011f\u0131 58 b\u00f6lge ilinde ise ku\u0308c\u0327u\u0308k u\u0308retim yat\u0131r\u0131mlar\u0131, OSB bu\u0308nyelerindeki <img loading=\"lazy\" class=\"alignright wp-image-96508\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi-300x169.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/teiastan-turkiyenin-10-yillik-elektrik-uretim-kapasitesi-plani-aciklamasi.jpg 640w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>u\u0308retim tesisleri, cu\u0308zi miktarda kapasite art\u0131s\u0327lar\u0131 gibi baz\u0131 olas\u0131 u\u0308retim yat\u0131r\u0131mlar\u0131 ic\u0327in 2019-2024 y\u0131llar\u0131 i\u00e7in il bazl\u0131 olarak 50\u2019s\u0327er MW olmak \u00fczere toplamda 2.900 MW\u2019l\u0131k kapasite sa\u011flanabilecek. Bununla birlikte \u00e7at\u0131 tipi GES yat\u0131r\u0131mlar\u0131 ba\u015fvurular\u0131 ise raporda a\u00e7\u0131klanan kapasitelerin d\u0131\u015f\u0131nda olacak.<\/p>\n<p>T\u00fcrkiye&#8217;nin elektrik \u00fcretim kapasitesine y\u00f6nelik kurulu g\u00fc\u00e7 tahmini 2024 y\u0131l\u0131 i\u00e7in 111.710 MW, 2029 y\u0131l\u0131 i\u00e7in ise 127.754 MW olarak belirtildi. T\u00fcrkiye\u2019nin elektrik \u00fcretim kapasitesi ge\u00e7en ay sonu 90.420,9 MW\u2019\u0131 yakalad\u0131.<\/p>\n<p><strong>5 ve 10 Y\u0131ll\u0131k (2024-2029) B\u00f6lgesel Ba\u011flanabilir Kapasite Raporu Detaylar\u0131 \u0130\u00e7in:<\/strong>\u00a0<a href=\"https:\/\/www.teias.gov.tr\/sites\/default\/files\/2019-07\/5_ve_10_Yillik_%282024-2029%29_Bolgesel_Baglanabilir_Kapasite_Raporu_0.pdf\" target=\"_blank\" rel=\"noopener\">https:\/\/www.teias.gov.tr\/sites\/default\/files\/2019-07\/5_ve_10_Yillik_%282024-2029%29_Bolgesel_Baglanabilir_Kapasite_Raporu_0.pdf<\/a> adresini ziyaret edebilirsiniz.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. TE\u0130A\u015e taraf\u0131ndan yay\u0131nlanan 5 ve 10 Y\u0131ll\u0131k (2024-2029) B\u00f6lgesel Ba\u011flanabilir Kapasite Raporu\u2019nda yer alan hesaplamalara g\u00f6re, 2024 sonuna kadar 20.818 MW, 2029 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":96508,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[54350,30581,54351,36029,19,52259,54352,1582],"views":777,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96506"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=96506"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96506\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/96508"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=96506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=96506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=96506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}