{"id":96459,"date":"2019-07-26T12:41:36","date_gmt":"2019-07-26T09:41:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=96459"},"modified":"2019-07-26T12:58:56","modified_gmt":"2019-07-26T09:58:56","slug":"petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek\/","title":{"rendered":"(Turkish) Petrol Devi &#8216;Suudi Arabistan&#8217; 3 Y\u0131l \u0130\u00e7inde R\u00fczgardan Elektrik \u00dcretecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/96459\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Suudi Arabistan taraf\u0131ndan \u00f6n\u00fcm\u00fczdeki 3 y\u0131lda r\u00fczgardan enerji \u00fcretimine ba\u015flan\u0131lacak. Fosil yak\u0131tlara ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmaya y\u00f6nelik Suudi Arabistan, EDF Renewables ve Abu Dabi merkezli Masdar ile <img loading=\"lazy\" class=\"alignleft wp-image-96461\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek-300x169.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/petrol-devi-suudi-arabistan-3-yil-icinde-ruzgardan-elektrik-uretecek.jpg 868w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>400 megawatt b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki Dumat Al Jandal tesisinin kurulmas\u0131 i\u00e7in anla\u015ft\u0131.<\/strong><\/h1>\n<p>2022 y\u0131l\u0131n\u0131n ilk\u00a0\u00e7eyre\u011finde \u00fcretime ge\u00e7ilecek tesis, Ortado\u011fu&#8217;nun en b\u00fcy\u00fck r\u00fczgar enerjisi tesisi olacak. EDF ve Masdar, projenin finansman\u0131 i\u00e7in Suudi Arabistan bankalar\u0131 ve uluslararas\u0131 bankalar ile anla\u015fmaya vard\u0131lar.<\/p>\n<p>Suudi Arabistan Enerji Bakanl\u0131\u011f\u0131 hali haz\u0131rda 12 yenilenebilir enerji projesi i\u00e7in ihale s\u00fcre\u00e7lerini y\u00fcr\u00fct\u00fcyor. 3 bin mw toplam kapasiteye sahip bu 12 proje i\u00e7in 60 \u015firket bir sonraki a\u015famaya ge\u00e7meye hak kazand\u0131.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2019-07-22\/oil-giant-saudi-arabia-is-set-to-start-first-wind-power-plant\" target=\"_blank\" rel=\"noopener\">Bloomberg<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Suudi Arabistan taraf\u0131ndan \u00f6n\u00fcm\u00fczdeki 3 y\u0131lda r\u00fczgardan enerji \u00fcretimine ba\u015flan\u0131lacak. Fosil yak\u0131tlara ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmaya y\u00f6nelik Suudi Arabistan, EDF Renewables ve Abu Dabi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":96461,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[1813,54318,3701,54317,19,52259,3651,54320,35002,54321,24949,35004,23318,34960,32075,1463,54319,34977,26829,10290],"views":668,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96459"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=96459"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96459\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/96461"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=96459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=96459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=96459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}