{"id":96118,"date":"2019-07-20T10:48:50","date_gmt":"2019-07-20T07:48:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=96118"},"modified":"2019-07-20T10:54:07","modified_gmt":"2019-07-20T07:54:07","slug":"epias-seffaflik-platformuna-yeni-veriler-ilave-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/epias-seffaflik-platformuna-yeni-veriler-ilave-etti\/","title":{"rendered":"(Turkish) &#8217;EP\u0130A\u015e&#8217; \u015eeffafl\u0131k Platformu\u2019na Yeni Veriler \u0130lave Etti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/96118\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji Piyasalar\u0131 \u0130\u015fletme A.\u015e. (EP\u0130A\u015e) taraf\u0131ndan \u015eeffafl\u0131k Platformu\u2019nda yeni veriler yay\u0131mlanmaya ba\u015fland\u0131.<\/strong><\/h2>\n<p>\u015eeffafl\u0131k Platformu\u2019na Da\u011f\u0131t\u0131m \u015eirketlerinin <strong>2018 \u2013 2027 Y\u0131llar\u0131<\/strong> \u0130\u00e7in <strong>T\u00fcketim Tahminlerinin ve Nomine Kapasite \/ \u0130thalat-\u0130hracat \u0130kili Anla\u015fma Miktarlar\u0131<\/strong>\u00a0bilgilerinin de eklendi\u011fi a\u00e7\u0131kland\u0131.<\/p>\n<p>A\u015fa\u011f\u0131da Yer Alan Veriler\u00a0<strong>\u015eeffafl\u0131k Platformu<\/strong>\u2019na <span style=\"text-decoration: underline;\">ilave edilmi\u015ftir;<strong><img loading=\"lazy\" class=\"alignright size-medium wp-image-96120\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/epias-seffaflik-platformuna-yeni-veriler-ilave-etti-300x222.jpg\" alt=\"\" width=\"300\" height=\"222\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/epias-seffaflik-platformuna-yeni-veriler-ilave-etti-300x222.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/epias-seffaflik-platformuna-yeni-veriler-ilave-etti-500x371.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/epias-seffaflik-platformuna-yeni-veriler-ilave-etti-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/epias-seffaflik-platformuna-yeni-veriler-ilave-etti.jpg 658w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/span><\/p>\n<p>&#8211; Da\u011f\u0131t\u0131m \u015eirketlerinin <strong>2018 \u2013 2027 Y\u0131llar\u0131<\/strong> \u0130\u00e7in T\u00fcketim Tahminleri<\/p>\n<p>&#8211; Nomine Kapasite \/ \u0130thalat-\u0130hracat \u0130kili Anla\u015fma Miktarlar\u0131<\/p>\n<p>Ayr\u0131ca a\u015fa\u011f\u0131da yer alan verilerin <strong>web servisleri<\/strong> de <span style=\"text-decoration: underline;\">hizmete girmi\u015ftir;<\/span><\/p>\n<p>Kesinle\u015fmi\u015f Uzla\u015ft\u0131rma D\u00f6nemi \u00dcretim Plan\u0131 (KUD\u00dcP),<\/p>\n<p>Primer Frekans Kontrol\u00fc \u2013 Fiyat Bilgsi ve Rezerv Miktar\u0131<\/p>\n<p>Sekonder Frekans Kontrol\u00fc \u2013 Fiyat Bilgisi ve Rezerv Miktar\u0131<\/p>\n<p><strong>Daha Fazla Bilgi \u0130\u00e7in:<\/strong>\u00a0<a href=\"https:\/\/seffaflik.epias.com.tr\/transparency\/\" target=\"_blank\" rel=\"noopener\">https:\/\/seffaflik.epias.com.tr\/transparency\/<\/a> adresini ziyaret edebilirsiniz.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji Piyasalar\u0131 \u0130\u015fletme A.\u015e. (EP\u0130A\u015e) taraf\u0131ndan \u015eeffafl\u0131k Platformu\u2019nda yeni veriler yay\u0131mlanmaya ba\u015fland\u0131. \u015eeffafl\u0131k Platformu\u2019na Da\u011f\u0131t\u0131m \u015eirketlerinin 2018 \u2013 2027 Y\u0131llar\u0131 \u0130\u00e7in T\u00fcketim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":96121,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[42024,36029,34980,8529,43977,54020,54021,23648,54022,54023],"views":741,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96118"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=96118"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/96118\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/96121"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=96118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=96118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=96118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}