{"id":95993,"date":"2019-07-17T14:21:15","date_gmt":"2019-07-17T11:21:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95993"},"modified":"2019-07-17T14:24:28","modified_gmt":"2019-07-17T11:24:28","slug":"yunanistanin-2inci-yenilenebilir-enerji-ihalesi-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yunanistanin-2inci-yenilenebilir-enerji-ihalesi-tamamlandi\/","title":{"rendered":"(Turkish) Yunanistan&#8217;\u0131n 2&#8217;inci &#8216;Yenilenebilir Enerji \u0130halesi&#8217; Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95993\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Yunanistan taraf\u0131ndan 330 MW kapasiteye sahip 2&#8217;inci a\u00e7\u0131k eksiltmeli g\u00fcne\u015f ve r\u00fczgar <img loading=\"lazy\" class=\"alignright size-medium wp-image-95995\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/yunanistanin-2inci-yenilenebilir-enerji-ihaleleri-tamamlandi-300x178.jpg\" alt=\"\" width=\"300\" height=\"178\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/yunanistanin-2inci-yenilenebilir-enerji-ihaleleri-tamamlandi-300x178.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/yunanistanin-2inci-yenilenebilir-enerji-ihaleleri-tamamlandi-768x455.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/yunanistanin-2inci-yenilenebilir-enerji-ihaleleri-tamamlandi-500x296.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/yunanistanin-2inci-yenilenebilir-enerji-ihaleleri-tamamlandi-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/yunanistanin-2inci-yenilenebilir-enerji-ihaleleri-tamamlandi.jpg 823w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>enerjisi ihaleleri tamamland\u0131.<\/strong><\/h1>\n<p>Yunanistan Enerji Piyasalar\u0131 D\u00fczenleme Kurumu (RAE) taraf\u0131ndan y\u00fcr\u00fct\u00fclen \u00fclkenin ikinci a\u00e7\u0131k eksiltmeli g\u00fcne\u015f ve r\u00fczgar enerjisi ihalesi 330 MW kapasite tahsis edilerek tamamland\u0131.<\/p>\n<p>\u0130hale, 20 MW&#8217;a kadar g\u00fcne\u015f santralleri enerji santralleri ve 50 MW\u2019a kadar r\u00fczg\u00e2r santralleri olmak \u00fczere iki ayr\u0131 kategoride ger\u00e7ekle\u015fti. 1&#8217;inci kategoriye y\u00f6nelik megavatsaat ba\u015f\u0131na ortalama 62,78 euro fiyat ile 275 teklif verilirken 2&#8217;incisinde 67.32 euro fiyat ile 37 adet teklif verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yunanistan taraf\u0131ndan 330 MW kapasiteye sahip 2&#8217;inci a\u00e7\u0131k eksiltmeli g\u00fcne\u015f ve r\u00fczgar enerjisi ihaleleri tamamland\u0131. Yunanistan Enerji Piyasalar\u0131 D\u00fczenleme Kurumu (RAE) taraf\u0131ndan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95995,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[53868,53114,19,35038,23416,35039,53871,53546,13199,35002,24949,35004,34977,26829,53869,255,53870],"views":566,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95993"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95993"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95993\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95995"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}