{"id":9581,"date":"2013-04-13T20:37:22","date_gmt":"2013-04-13T17:37:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9581"},"modified":"2013-04-13T20:40:02","modified_gmt":"2013-04-13T17:40:02","slug":"solar-fabrik-altun-grupa-modullerini-teslim-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/solar-fabrik-altun-grupa-modullerini-teslim-etti\/","title":{"rendered":"(Turkish) Solar &#8211; Fabrik Altun Grup\u2019a Mod\u00fcllerini Teslim Etti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9581\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alman g\u00fcne\u015f mod\u00fcl\u00fc \u00fcr<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-HI-247448.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9582\" title=\"gunes-enerjisi--HI-247448\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-HI-247448-300x184.jpg\" alt=\"\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-HI-247448-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-HI-247448-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-HI-247448-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/gunes-enerjisi-HI-247448.jpg 592w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>eticisi Solar-Fabrik AG (ETR:SFX), \u0130zmir Torbal\u0131\u2019da in\u015fe edilen 250 kW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali i\u00e7in g\u00fcne\u015f mod\u00fclleri ve eviricileri teslim etti.<\/strong><\/p>\n<p>Ankara merkezli Altun Grup Solar Enerji Ve Enerji Teknolojileri Ltd. \u015eirketi\u2019ne ait olan santral, ge\u00e7ti\u011fimiz ay devreye al\u0131nm\u0131\u015ft\u0131.<\/p>\n<p>Solar \u00c7iftlik, lojistik \u015firketi Reysa\u015f\u2019\u0131n \u00e7at\u0131s\u0131na yerle\u015ftirilen 1044 Solar Fabrik mod\u00fcl\u00fcnden olu\u015fuyor. \u00c7iftli\u011fin, y\u0131lda 479 MW\/saat elektrik \u00fcretmesi bekleniyor.<\/p>\n<p>&nbsp;<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/solar-fabrik-altun-grup\u2019a-modullerini-teslim-etti_3135.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alman g\u00fcne\u015f mod\u00fcl\u00fc \u00fcreticisi Solar-Fabrik AG (ETR:SFX), \u0130zmir Torbal\u0131\u2019da in\u015fe edilen 250 kW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali i\u00e7in g\u00fcne\u015f mod\u00fclleri ve eviricileri teslim etti. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9582,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[4438,19,63,67,4437,2326,227,13,2569,4439,4436],"views":970,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9581"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9581"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9581\/revisions"}],"predecessor-version":[{"id":9588,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9581\/revisions\/9588"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9582"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}