{"id":95795,"date":"2019-07-12T10:47:07","date_gmt":"2019-07-12T07:47:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95795"},"modified":"2019-07-12T10:52:28","modified_gmt":"2019-07-12T07:52:28","slug":"konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor\/","title":{"rendered":"(Turkish) Konya\u2019da &#8216;KOSK\u0130&#8217; nin Su Kuyular\u0131 Enerjisini G\u00fcne\u015ften Al\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95795\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Konya B\u00fcy\u00fck\u015fehir Belediyesi KOSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn 6360 say\u0131l\u0131 B\u00fcy\u00fck\u015fehir Belediyeleri Kanununa g\u00f6re sorumluluk alan\u0131na giren mahallelerdeki su kuyular\u0131n\u0131n harcad\u0131\u011f\u0131 enerjiyi en aza d\u00fc\u015f\u00fcrerek <img loading=\"lazy\" class=\"alignleft size-medium wp-image-95797\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/konyada-koski-nin-su-kuyulari-enerjisini-gunesten-aliyor.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>elektrikten tasarruf sa\u011flamaya y\u00f6nelik fotovoltaik enerji sistemlerinin yayg\u0131n hale getirildi\u011fini a\u00e7\u0131klad\u0131.<\/h1>\n<p>G\u00fcne\u015f enerjisi paneliyle g\u00fcne\u015f enerjisinden elektrik \u00fcretimi ger\u00e7ekle\u015ftirilerek kuyu pompalar\u0131n\u0131n \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flayan fotovoltaik enerji sistemi devreye al\u0131n\u0131rken 25 farkl\u0131 noktada, muhtelif g\u00fc\u00e7lere sahip toplam 466 kw&#8217;l\u0131k g\u00fcne\u015f enerji sistemi kuran KOSK\u0130, depolarda g\u00fcvenlik kameralar\u0131, SCADA, haberle\u015fme ve klorlama sistem enerjilerini art\u0131k fotovoltaik g\u00fcne\u015f sisteminden sa\u011flamaktad\u0131r.<\/p>\n<p>G\u00fcne\u015f enerjisinden faydalan\u0131lan sistemlerle g\u00f6ky\u00fcz\u00fcn\u00fcn ayd\u0131nlanmas\u0131yla birlikte kesintisiz su \u00fcretimi ger\u00e7ekle\u015ftirmekte havan\u0131n kararmas\u0131yla devre d\u0131\u015f\u0131 kalan sistem, b\u00f6lgenin su ihtiyac\u0131n\u0131 ise kuyu \u015febeke elektri\u011fiyle su elde etmektedir. 25 y\u0131l kullan\u0131m \u00f6mr\u00fc olan sistem, 5 sene i\u00e7erisinde kendisini amorti etmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Konya B\u00fcy\u00fck\u015fehir Belediyesi KOSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn 6360 say\u0131l\u0131 B\u00fcy\u00fck\u015fehir Belediyeleri Kanununa g\u00f6re sorumluluk alan\u0131na giren mahallelerdeki su kuyular\u0131n\u0131n harcad\u0131\u011f\u0131 enerjiyi en aza [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95797,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[53643,53646,36029,53647,19,53644,53650,52259,30179,53649,12792,23416,45697,53648,39384,23131,25280,53645,34977,26829],"views":741,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95795"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95795"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95795\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95797"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}