{"id":95726,"date":"2019-07-10T22:07:02","date_gmt":"2019-07-10T19:07:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95726"},"modified":"2019-07-10T22:18:55","modified_gmt":"2019-07-10T19:18:55","slug":"ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi\/","title":{"rendered":"(Turkish) &#8217;GE&#8217; T\u00fcrkiye\u2019de \u0130lk Cypress R\u00fczgar T\u00fcrbini Sipari\u015fini Borusan EnBW&#8217;den Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95726\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>GE Yenilenebilir Enerji, Borusan EnBW Enerji\u2019nin T\u00fcrkiye\u2019deki 190 bin konutun enerji ihtiyac\u0131na kar\u015f\u0131l\u0131k gelen 138 MW\u2019l\u0131k Saros Projesi i\u00e7in 27 Cypress \u00fcnitesini temin etmek \u00fczere anla\u015fma imzalad\u0131\u011f\u0131n\u0131 bug\u00fcn duyurdu. Borusan EnBW Enerji, 158 metrelik rotor \u00e7ap\u0131na sahip Cypress t\u00fcrbinlerini 5.X MW\u2019l\u0131k g\u00fc\u00e7le \u00e7al\u0131\u015ft\u0131racak.<\/h1>\n<p>GE\u2019nin Cypress platformu i\u00e7in T\u00fcrkiye\u2019deki ilk sipari\u015fi olan bu proje, \u015firketin bu alandaki en b\u00fcy\u00fck kara tipi r\u00fczgar t\u00fcrbini sahas\u0131 olacak. Proje ayn\u0131 zamanda GE\u2019nin T\u00fcrkiye\u2019deki en b\u00fcy\u00fck r\u00fczg\u00e2r santrallerinden biri olacak. Anla\u015fma kapsam\u0131nda GE\u2019nin 10 y\u0131ll\u0131k servis anla\u015fmas\u0131 da yer al\u0131yor.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-95728\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi.jpg\" alt=\"\" width=\"340\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi.jpg 868w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/ge-turkiyede-ilk-cypress-ruzgar-turbini-siparisini-borusan-enbwden-aldi-80x45.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>Cypress\u2019\u0131n devrim niteli\u011findeki iki par\u00e7al\u0131 kanad\u0131, \u0130zmir Bergama\u2019daki LM Wind Power r\u00fczg\u00e2r t\u00fcrbini kanat \u00fcretim tesisinde \u00fcretilecek. \u015eirket k\u0131sa s\u00fcre \u00f6nce mevcut tesisi b\u00fcy\u00fctmek ve 300 yeni \u00e7al\u0131\u015fan\u0131 b\u00fcnyesine d\u00e2hil etmek \u00fczere 2019 sonuna kadar 30 milyon dolar daha yat\u0131r\u0131m yapma karar\u0131n\u0131 ald\u0131\u011f\u0131n\u0131 duyurmu\u015ftu. R\u00fczgar t\u00fcrbinlerinin kuleleri de yine T\u00fcrkiye\u2019de \u00fcretilecek.<\/p>\n<p>Borusan EnBW Enerji Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla, \u015funlar\u0131 s\u00f6yledi: &#8220;<em>\u00dclkemizin yenilenebilir enerji kaynaklar\u0131n\u0131 geli\u015ftirme ve r\u00fczg\u00e2r enerjisinde sekt\u00f6r lideri olma vizyonumuzu ger\u00e7ekle\u015ftirmeye kararl\u0131y\u0131z. Saros RES projemiz de bu kararl\u0131l\u0131\u011f\u0131m\u0131z\u0131n bir ifadesidir. Toplam 190 milyon ABD dolar\u0131 yat\u0131r\u0131m yapt\u0131\u011f\u0131m\u0131z Saros RES\u2019in kurulu g\u00fcc\u00fc 138 MW, y\u0131ll\u0131k toplam \u00fcretimi 530 GWh olacak. 190.000 hanenin enerji ihtiyac\u0131 kar\u015f\u0131lanacak ve 297 bin ton karbon sal\u0131m\u0131 engellenecek. B\u00f6yle bir tesisi \u00fclkemize kazand\u0131raca\u011f\u0131m\u0131z i\u00e7in mutlu ve gururluyuz.<\/em>&#8221;<\/p>\n<p>GE Yenilenebilir Enerji Orta Do\u011fu, Kuzey Afrika ve T\u00fcrkiye Ba\u015fkan ve CEO\u2019su Dr. Manar Al Moneef ise \u015funlar\u0131 s\u00f6yledi: \u201c<em>Borusan EnBW Enerji, T\u00fcrkiye\u2019deki en b\u00fcy\u00fck r\u00fczg\u00e2r enerjisi yat\u0131r\u0131mc\u0131lar\u0131 aras\u0131nda bulunuyor. Birlikte \u00e7al\u0131\u015facak olmaktan ve m\u00fc\u015fterimize yenilenebilir enerji hedeflerine ula\u015fmas\u0131nda yard\u0131m etmekten b\u00fcy\u00fck heyecan duyuyoruz. GE olarak T\u00fcrkiye\u2019ye daha fazla r\u00fczg\u00e2r enerjisi kazand\u0131rmaktan ve bu end\u00fcstrinin daha fazla geli\u015fmesi i\u00e7in gerek istihdam gerek \u00fcretim alanlar\u0131nda yat\u0131r\u0131m yapmaktan dolay\u0131 da ayr\u0131ca b\u00fcy\u00fck gurur duyuyoruz. Hedefimiz, m\u00fc\u015fterilerimizin enerji maliyetlerini her ge\u00e7en g\u00fcn azaltmalar\u0131na yard\u0131mc\u0131 olmak ve Cypress platformumuz da tam da bu noktada \u00fclkenin r\u00fczg\u00e2r h\u0131z\u0131 ve ortam\u0131ndan en iyi \u015fekilde yararlanmak i\u00e7in ideal bir \u00e7\u00f6z\u00fcm sunuyor<\/em>\u201d.<\/p>\n<p>Cypress, y\u0131ll\u0131k enerji \u00fcretiminde kayda de\u011fer iyile\u015fmelere, i\u015fletilebilirlikte verimlilik art\u0131\u015f\u0131na, daha iyi lojistik ve konumland\u0131rma potansiyeline ve nihayetinde m\u00fc\u015fteriler i\u00e7in daha fazla de\u011fer yarat\u0131lmas\u0131na imk\u00e2n tan\u0131yor. \u0130ki par\u00e7al\u0131 kanat tasar\u0131m\u0131 ise daha da uzun boyutlarda kanat \u00fcretimini m\u00fcmk\u00fcn k\u0131larken maliyetleri azaltacak \u015fekilde lojisti\u011fi iyile\u015ftiriyor; ge\u00e7mi\u015fte eri\u015filemeyen yerlerde daha fazla konumland\u0131rma se\u00e7ene\u011fi sunuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE Yenilenebilir Enerji, Borusan EnBW Enerji\u2019nin T\u00fcrkiye\u2019deki 190 bin konutun enerji ihtiyac\u0131na kar\u015f\u0131l\u0131k gelen 138 MW\u2019l\u0131k Saros Projesi i\u00e7in 27 Cypress \u00fcnitesini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95728,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[14225,53552,53556,53549,53551,53554,40807,52259,18,2422,19897,53555,51154,31843,12707,24949,35004,53557,4013,23318,34960,324,53550,53553,34977,793,26829,508],"views":974,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95726"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95726"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95726\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95728"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}