{"id":95634,"date":"2019-07-09T08:19:51","date_gmt":"2019-07-09T05:19:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95634"},"modified":"2019-07-09T08:23:17","modified_gmt":"2019-07-09T05:23:17","slug":"macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi\/","title":{"rendered":"(Turkish) Macaristan\u2019de Paks-2 NGS&#8217;nin \u0130lk \u0130n\u015faat ve Montaj \u0130\u015fleri Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95634\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rosatom\u2019un m\u00fchendislik b\u00f6l\u00fcm\u00fc ASE EC JSC taraf\u0131ndan Macaristan\u2019da kurulmakta olan Paks-2 NGS\u2019nin in\u015faat ve montaj \u00fcss\u00fcn\u00fcn kurulmas\u0131na y\u00f6nelik \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Bu vesileyle bir t\u00f6ren d\u00fczenlendi.<\/h1>\n<p>T\u00f6rene, Paks NGS\u2019nin geni\u015flemesinden sorumlu Bakan Janosh Shuli, ASE EC JSC\u2019nin K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 ve Paks &#8211; 2 NGS\u2019nin Yap\u0131m M\u00fcd\u00fcr\u00fc Alexander Khazin, Paks &#8211; 2 NGS\u2019nin Genel M\u00fcd\u00fcr\u00fc Istvan Lenkei ile ilk tesislerin in\u015faat\u0131ndan sorumlu K\u00c9SZ Group \u015eirketi\u2019nin in\u015faat b\u00f6l\u00fcm\u00fcn\u00fcn Direkt\u00f6r\u00fc Zoltan Sharai kat\u0131ld\u0131.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-95636\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/macaristanda-paks-2-ngsde-ilk-insaat-ve-montaj-isleri-basladi.jpg 651w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>S\u00f6z konusu \u00e7al\u0131\u015fmalar \u00e7er\u00e7evesinde idari binalar, montaj at\u00f6lyeleri, depolar gibi toplamda 80&#8217;den fazla yap\u0131 in\u015fa edilecek. T\u00fcm bu yap\u0131lar \u00f6n\u00fcm\u00fczdeki s\u00fcre\u00e7te iki n\u00fckleer g\u00fc\u00e7 \u00fcnitesinin kurulumu i\u00e7in gerekli olacak.<\/p>\n<p>Paks NGS\u2019nin geni\u015flemesinden sorumlu Bakan Janosh Shuli, \u201cMacar ekonomisinin uzun vadeli rekabet g\u00fcc\u00fc a\u00e7\u0131s\u0131ndan, Macar i\u015fletmelerine ve halka ucuz yerli elektrik sa\u011flanmas\u0131 son derece \u00f6nemlidir\u201d dedi. N\u00fckleer santrallerin karbondioksit emisyonu olmadan end\u00fcstriyel \u00f6l\u00e7ekte elektrik \u00fcrettiklerini belirten Bakan Shuli, bu nedenle, Macar iklim politikas\u0131n\u0131n temelinin, n\u00fckleer enerjinin uzun s\u00fcreli korunmas\u0131 ile birlikte g\u00fcne\u015f enerjisi pay\u0131n\u0131n artmas\u0131 oldu\u011funu s\u00f6yledi. \u015eu anda \u00fclkenin elektrik ihtiyac\u0131n\u0131n \u00fc\u00e7te birinin Macaristan&#8217;a kom\u015fu \u00fclkelerdeki k\u00f6m\u00fcr istasyonlar\u0131nda \u00fcretilen elektri\u011fin sat\u0131n al\u0131nd\u0131\u011f\u0131n\u0131 hat\u0131rlatan Bakan Shuli, \u201cBu nedenle, Paks-2 NGS projesi sadece iklim koruma hedeflerine ula\u015fmak i\u00e7in de\u011fil, ayn\u0131 zamanda ithalat ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in de kilit \u00f6neme sahiptir. Macar Enerji ve Enerji Altyap\u0131s\u0131n\u0131 D\u00fczenleme Kurumu\u2019nun (MEKN) son raporuna g\u00f6re, Macaristan, Bulgaristan&#8217;dan sonra AB \u00fclkeleri i\u00e7inde ucuz elektrik a\u00e7\u0131s\u0131ndan ikinci s\u0131rada yer al\u0131yor. Bu de\u011ferli yeri korumak i\u00e7in, enerji sepetindeki atom enerjisinin pay\u0131n\u0131 uzun vadede tutmak gerekir. Bu nedenle, yeni g\u00fc\u00e7 \u00fcnitelerinin kurulmas\u0131 \u00f6zellikle \u00f6nemlidir\u201d diye konu\u015ftu.<\/p>\n<p>Paks-2 NGS\u2019nin \u0130n\u015faat Direkt\u00f6r\u00fc, ASE EC JSC K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 Alexander Khazin, in\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131n\u0131n ba\u015flamas\u0131 ile Paks-2 NGS projesinin \u00f6nemli bir d\u00f6n\u00fcm noktas\u0131na ula\u015ft\u0131\u011f\u0131n\u0131 vurgulad\u0131. Khazin, \u201cPaks&#8217;ta binalar\u0131n in\u015faat\u0131n\u0131n ba\u015flamas\u0131yla birlikte, iki yeni g\u00fc\u00e7 \u00fcnitesinin yap\u0131m\u0131 i\u00e7in haz\u0131rl\u0131klar ba\u015flad\u0131. Bundan sonra da sahada kesintisiz \u00e7al\u0131\u015fma yap\u0131lacak. Paks-2 NGS\u2019de en modern ve en g\u00fcvenli nesil 3+ \u00fcnitelerden biri in\u015fa edilecek. Hizmet \u00f6mr\u00fcn\u00fc uzatma imkan\u0131 ile, Macaristan&#8217;a karbondioksit emisyonu olmadan ucuz elektrik sa\u011flayarak 60 y\u0131l garantili ve g\u00fcvenli bir \u015fekilde \u00e7al\u0131\u015facaklar\u201d dedi.<\/p>\n<p>Paks -2 NGS JSC\u2019nin Genel M\u00fcd\u00fcr\u00fc Istvan Lenkei ise, \u201c\u0130\u015fveren olarak Paks-2 NGS \u015firketi, proje \u00fczerindeki \u00e7al\u0131\u015fmalar\u0131n kaliteli bir \u015fekilde y\u00fcr\u00fct\u00fclmesini istiyor, bu nedenle genel y\u00fcklenici ASE ile yak\u0131ndan \u00e7al\u0131\u015f\u0131yoruz. Tesislerin yap\u0131m\u0131, yeni g\u00fc\u00e7 \u00fcnitelerinin en s\u0131k\u0131 uluslararas\u0131, Macar ve Avrupa g\u00fcvenlik gerekliliklerine maksimum uyumu i\u00e7in gerekli olan 300 bin sayfal\u0131k teknik dok\u00fcmantasyonun haz\u0131rlanmas\u0131na paralel olarak ger\u00e7ekle\u015ftirilmektedir\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rosatom\u2019un m\u00fchendislik b\u00f6l\u00fcm\u00fc ASE EC JSC taraf\u0131ndan Macaristan\u2019da kurulmakta olan Paks-2 NGS\u2019nin in\u015faat ve montaj \u00fcss\u00fcn\u00fcn kurulmas\u0131na y\u00f6nelik \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Bu vesileyle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95636,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[53453,53451,52259,53454,53450,53455,6666,53456,36443,23134,42363,34931,34930,53449,53452,2587],"views":696,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95634"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95634"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95634\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95636"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95634"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95634"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95634"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}