{"id":95582,"date":"2019-07-08T14:10:44","date_gmt":"2019-07-08T11:10:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95582"},"modified":"2019-07-08T14:15:36","modified_gmt":"2019-07-08T11:15:36","slug":"abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi\/","title":{"rendered":"(Turkish) Abu Dabi\u2019deki 2.000 MW\u2019l\u0131k G\u00fcne\u015f Enerjisi Santrali \u0130\u00e7in \u0130hale A\u00e7\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95582\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Birle\u015fik Arap Emirlikleri\u2019nin (BAE) \u00f6nde gelen su ve elektrik tedarik\u00e7isi olan Emirlik Su ve Elektrik \u015eirketi (EWEC) Al Dhafra taraf\u0131ndan Abu Dabi\u2019de kurulumu yap\u0131lacak 2.000 MW\u2019l\u0131k solar PV projesinin yap\u0131m\u0131 ve geli\u015ftirilmesine y\u00f6nelik ihale a\u00e7\u0131ld\u0131. Yeni proje, Abu Dabi\u2019deki Su ve Elektrik Sekt\u00f6r\u00fc Komitesi taraf\u0131ndan onaylanan bir dizi <img loading=\"lazy\" class=\"alignright wp-image-95584\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi-300x187.jpg\" alt=\"\" width=\"320\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi-768x479.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi-500x312.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/abu-dabideki-2-000-mwlik-gunes-enerjisi-santrali-icin-ihale-acildi.jpg 783w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>projeden sadece birisi&#8230;<\/h1>\n<p>Emirlik Haber Ajans\u0131 WAM\u2019\u0131n yapt\u0131\u011f\u0131 habere g\u00f6re, 20 Km\u00b2\u2019lik alan\u0131 kapsayacak yeni santral hizmete girdi\u011finde d\u00fcnyadaki mevcut en b\u00fcy\u00fck operasyonel tek alanl\u0131 g\u00fcne\u015f enerjisi santrali olan Noor Abu Dabi\u2019nin kapasitesini neredeyse iki kat\u0131na \u00e7\u0131karacak. 2022 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde ticari faaliyetlere ba\u015flamas\u0131 planlanan santral, BAE Enerji Stratejisi 2050 \u00e7er\u00e7evesinde, \u00fclkenin genel enerji karmas\u0131n\u0131n b\u00fcy\u00fck bir b\u00f6l\u00fcm\u00fcnde temiz enerjinin katk\u0131s\u0131n\u0131 art\u0131rmay\u0131 hedefliyor.<\/p>\n<p>Abu Dabi\u2019nin g\u00fcne\u015f enerjisi kapasitesini 3.200 MW g\u00fcc\u00fcne y\u00fckseltecek olan santraline y\u00f6nelik ba\u015far\u0131l\u0131 teklif verenler, yerel kurulu\u015flardan kalan hisseyle birlikte projeye % 40 oran\u0131nda bir sermaye kat\u0131l\u0131m\u0131 ger\u00e7ekle\u015ftirecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Birle\u015fik Arap Emirlikleri\u2019nin (BAE) \u00f6nde gelen su ve elektrik tedarik\u00e7isi olan Emirlik Su ve Elektrik \u015eirketi (EWEC) Al Dhafra taraf\u0131ndan Abu Dabi\u2019de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95584,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[1813,53418,3647,53425,3648,53422,53417,52259,47189,35038,23416,35039,23133,34925,23131,53424,53419,53420,53421,34977,53423,26829],"views":804,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95582"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95582"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95582\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95584"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}