{"id":95404,"date":"2019-07-04T07:14:59","date_gmt":"2019-07-04T04:14:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95404"},"modified":"2019-07-04T07:25:11","modified_gmt":"2019-07-04T04:25:11","slug":"gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi\/","title":{"rendered":"(Turkish) &#8217;GWEC&#8217; \u0130lk K\u00fcresel Offshore R\u00fczgar Raporunu Yay\u0131mlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95404\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>GWEC taraf\u0131ndan k\u00fcresel r\u00fczgar piyasas\u0131n\u0131n d\u00fc\u015f\u00fck maliyet g\u00fc\u00e7leri g\u00f6zden ge\u00e7irilerek pazar-seviye analizi ve tahmini datalar\u0131n\u0131 i\u00e7eren ilk k\u00fcresel Offshore R\u00fczgar raporu yay\u0131mland\u0131.<\/h1>\n<p>K\u00fcresel offshore pazar\u0131, toplam da 23 GW kapasite kurulumuna ula\u015farak 2013 y\u0131l\u0131ndan itibaren ortalama <img loading=\"lazy\" class=\"alignleft wp-image-95406\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi-300x180.jpg\" alt=\"\" width=\"320\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi-768x461.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/gwec-ilk-kuresel-offshore-ruzgar-raporunu-yayimladi.jpg 1000w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>her y\u0131l %21 b\u00fcy\u00fcme g\u00f6stermi\u015ftir. 2017 ve 2018\u2019de her y\u0131l 4 GW\u2019dan fazla yeni kapasite kurulmu\u015ftur ve her iki y\u0131lda kurulan toplam kapasitenin %8\u2019ini olu\u015fturmaktad\u0131r. \u0130lk kez, 2018 y\u0131l\u0131nda yeni tesislerin kurulumu baz al\u0131narak en b\u00fcy\u00fck offshore pazar\u0131na \u00c7in sahip olurken bunu \u0130ngiltere ve Almanya takip etmi\u015ftir.<\/p>\n<p>Giwec\u2019ten Piyasa \u0130stihbarat Direkt\u00f6r\u00fc Karin Ohlenforst, h\u00fck\u00fcmetlerin hedeflerini dikkate alarak 2030 y\u0131l\u0131nda toplam kapasitenin 190 GW ula\u015faca\u011f\u0131n\u0131 tahmin etmekte ve bunun sadece potansiyel offshore r\u00fczgar enerjisini temsil etmedi\u011fini belirtmi\u015ftir. Ayn\u0131 zamanda\u00a0Ohlenforst, bir\u00e7ok yeni \u00fclkenin offshore r\u00fczgar projelerine kat\u0131lmaya haz\u0131rlan\u0131rken offshore r\u00fczgar enerjisi gelecek y\u0131llarda daha da fazla hacim katabilecek oyun de\u011fi\u015ftiren teknolojik bir geli\u015fmeyi temsil etti\u011fini de dile getirmi\u015ftir.<\/p>\n<p>Zeynep TEKER \u2013 \u0130T\u00dc \/ \u00c7evre M\u00fchendisi \u2013\u00a0<a href=\"mailto:zeynepteker03@gmail.com\" target=\"_blank\" rel=\"noopener\"><strong>zeynepteker03@gmail.com<\/strong><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GWEC taraf\u0131ndan k\u00fcresel r\u00fczgar piyasas\u0131n\u0131n d\u00fc\u015f\u00fck maliyet g\u00fc\u00e7leri g\u00f6zden ge\u00e7irilerek pazar-seviye analizi ve tahmini datalar\u0131n\u0131 i\u00e7eren ilk k\u00fcresel Offshore R\u00fczgar raporu yay\u0131mland\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95406,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[48105,52317,53278,870,53276,53279,53280,50025,53281,53277,35002,24949,231,53282,34961,34960,34977,26829,48106],"views":766,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95404"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95404"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95404\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95406"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}