{"id":9538,"date":"2013-04-12T16:00:29","date_gmt":"2013-04-12T13:00:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9538"},"modified":"2013-04-12T16:00:29","modified_gmt":"2013-04-12T13:00:29","slug":"turkiye-istemese-de-nukleere-ced-aliriz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-istemese-de-nukleere-ced-aliriz\/","title":{"rendered":"(Turkish) T\u00fcrkiye \u0130stemese de N\u00fckleere \u00c7ED Al\u0131r\u0131z"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9538\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin ilk n\u00fckleer santrali olacak Akkuyu Santrali\u2019nin temeli 2015 y\u0131l\u0131 ba\u015f\u0131nda at\u0131l\u0131yor. Mersin Akkuyu\u2019da n\u00fckleer santral yapacak Rosatom, Macaristan\u2019da i\u015fletti\u011fi Paks n\u00fckleer santralinin kap\u0131lar\u0131n\u0131 T\u00fcrk gazetecilere a\u00e7t\u0131.<\/strong><\/p>\n<p>Burada T\u00fcrkiye\u2019deki santralle ilgili bilgi veren T\u00fcrkiye Direkt\u00f6r\u00fc Rauf Kasumov, b\u00fcy\u00fck yat\u0131r\u0131mlar\u0131 \u00c7ED raporundan muaf tutan y\u00f6netmelik de\u011fi\u015fikli\u011finin kendilerini etkilemedi\u011fini s\u00f6yledi. Bu raporu T\u00fcrkiye istemese de Uluslararas\u0131 Atom Enerji Kurumu\u2019nun zorunlulu\u011fu nedeniyle zaten almak zorunda olduklar\u0131n\u0131 belirten Kasumov, her \u015feyin \u00e7ok d\u00fczg\u00fcn olmas\u0131n\u0131 hedeflediklerini ifade etti.<\/p>\n<h2>2015 y\u0131l\u0131nda kazma<\/h2>\n<p>Kasumov, \u00c7ED i\u00e7in ba\u015fvuruyu may\u0131s so<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9539\" title=\"turkiye-istemese-de-nukleer-e-ced-aliriz\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-80x50.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png 481w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>nunda yapacaklar\u0131n\u0131, temmuz sonuna kadar da olumlu yan\u0131t almay\u0131 umut ettiklerini s\u00f6yledi. Daha sonra haz\u0131rl\u0131k \u00e7al\u0131\u015fmalar\u0131na ba\u015flayacaklar\u0131n\u0131 belirten Kasumov, 2015 ba\u015f\u0131nda ilk temelin at\u0131laca\u011f\u0131n\u0131, 2019\u2032da in\u015faat\u0131 tamamlay\u0131p 6 ayl\u0131k test s\u00fcrecinin ba\u015flayaca\u011f\u0131n\u0131, 2020 y\u0131l\u0131nda ise ilk \u00fcniteyi i\u015fletmeye a\u00e7acaklar\u0131n\u0131 bildirdi.<\/p>\n<h2>7-8 milyar dolarl\u0131k i\u015f<\/h2>\n<p>Kasumov, in\u015faat\u0131 yapacak firmalar\u0131n belirlenmesi amac\u0131yla bir \u00e7al\u0131\u015fma grubu olu\u015fturduklar\u0131n\u0131, grubun santralde \u00e7al\u0131\u015facak firmalar\u0131 belirleyece\u011fini s\u00f6yledi. Kasumov, T\u00fcrk firmalar\u0131n\u0131n trib\u00fcn binas\u0131, jenerat\u00f6r ve altyap\u0131 gibi yat\u0131r\u0131mlar\u0131 \u00fcstlenebilece\u011fini belirtirken bu yat\u0131r\u0131mlar\u0131n toplam b\u00fcy\u00fckl\u00fc\u011f\u00fcn\u00fcn 7-8 milyar dolara ula\u015faca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<h2>Paks\u2019\u0131n daha geli\u015fmi\u015fi olur<\/h2>\n<p>Rusatom\u2019un 30 y\u0131l \u00f6nce Macaristan\u2019da kurdu\u011fu 2000 MW\u2019lik Paks Santrali, 2003\u2032te kaza atlatm\u0131\u015f ve \u00fcniteler ge\u00e7ici olarak durdurulmu\u015f. \u00dclke enerji t\u00fcketiminin y\u00fczde 40\u2019\u0131n\u0131 kar\u015f\u0131layan Paks, yeni yat\u0131r\u0131mlarla pay\u0131n\u0131 daha da art\u0131rarak en \u00f6nemli eneri kayna\u011f\u0131 haline gelecek. Yetkililer, T\u00fcrkiye\u2019ye kurulacak santralin Paks\u2019\u0131n \u00e7ok daha geli\u015fmi\u015fi olaca\u011f\u0131n\u0131 s\u00f6ylediler.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/04\/12\/turkiye-istemese-de-nukleere-ced-aliriz\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin ilk n\u00fckleer santrali olacak Akkuyu Santrali\u2019nin temeli 2015 y\u0131l\u0131 ba\u015f\u0131nda at\u0131l\u0131yor. Mersin Akkuyu\u2019da n\u00fckleer santral yapacak Rosatom, Macaristan\u2019da i\u015fletti\u011fi Paks n\u00fckleer santralinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[4403,4402,4401,67,1301,21,88,2587],"views":675,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9538"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9538"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9538\/revisions"}],"predecessor-version":[{"id":9541,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9538\/revisions\/9541"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9539"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}