{"id":95336,"date":"2019-07-03T12:01:36","date_gmt":"2019-07-03T09:01:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95336"},"modified":"2019-07-03T12:09:56","modified_gmt":"2019-07-03T09:09:56","slug":"canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede\/","title":{"rendered":"(Turkish) \u00c7anakkale&#8217;nin 2&#8217;inci R\u00fczgar Santrali &#8216;\u00dc\u00e7p\u0131nar RES&#8217; Tam Kapasiteyle Devrede!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95336\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>2020 y\u0131l\u0131na kadar T\u00fcrkiye\u2019de sadece yerli ve yenilenebilir kaynaklardan olu\u015fan 1000 MW\u2019l\u0131k enerji \u00fcretim santrali kapasitesine ula\u015fmay\u0131 hedefleyen Akfen Yenilenebilir Enerji, \u00c7anakkale\u2019de 143 milyon dolarl\u0131k yat\u0131r\u0131ma sahip 112 MW\u2019l\u0131k \u00dc\u00e7p\u0131nar R\u00fczg\u00e2r Enerji Santrali (RES) projesinin tamam\u0131n\u0131 devreye ald\u0131.<\/strong><\/h1>\n<p>Yerli ve yenilenebilir enerji kaynaklar\u0131n\u0131 ekonomiye kazand\u0131rmak \u00fczere yat\u0131r\u0131mlar\u0131n\u0131 aral\u0131ks\u0131z s\u00fcrd\u00fcren <strong>Akfen Yenilenebilir Enerji<\/strong>, 143 milyon dolarl\u0131k yat\u0131r\u0131m de\u011feri bulunan <strong>\u00c7anakkale \u00dc\u00e7p<\/strong><strong>\u0131<\/strong><strong>nar <img loading=\"lazy\" class=\"alignright size-medium wp-image-95338\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/canakkalenin-2inci-ruzgar-santrali-ucpinar-res-tam-kapasiteyle-devrede.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>R<\/strong><strong>\u00fc<\/strong><strong>zgar Enerji Santrali (RES) <\/strong>projesinde tam kapasiteyle elektrik \u00fcretimine ge\u00e7ti.<\/p>\n<p><strong>\u00dc\u00e7p<\/strong><strong>\u0131<\/strong><strong>nar RES<\/strong>\u2019in <strong>112 MW kurulu g\u00fc\u00e7 kapasitesine sahip 33 t\u00fcrbini<\/strong> i\u00e7in Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan kabul alan <strong>Akfen Yenilenebilir Enerji<\/strong>, projeyi tamamlam\u0131\u015f oldu.<\/p>\n<p>Y\u0131ll\u0131k 187 GWs\u2019l\u0131k elektri\u011fi T\u00fcrkiye\u2019nin en fazla r\u00fczg\u00e2r alan b\u00f6lgelerinin ba\u015f\u0131nda gelen \u00c7anakkale\u2019nin r\u00fczg\u00e2r\u0131ndan \u00fcretecek olan \u00dc\u00e7p\u0131nar RES, bu sayede <strong>450 bin ki<\/strong><strong>\u015f<\/strong><strong>inin<\/strong> de y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/p>\n<p>\u00dc\u00e7p\u0131nar RES\u2019in tamamlanmas\u0131yla su, g\u00fcne\u015f ile r\u00fczg\u00e2r gibi yerli ve yenilenebilir kaynaklardan elektrik \u00fcretimine odaklanan Akfen Yenilenebilir Enerji 467 MW g\u00fcc\u00fcnde temiz enerji portf\u00f6y\u00fcne ula\u015ft\u0131.<\/p>\n<h2>Yar\u0131m Milyon\u00a0<strong>Ki\u015fi Enerjisini<\/strong><strong>\u00a0<\/strong><strong>R\u00fczgardan Al\u0131yor<\/strong><\/h2>\n<p>2019 y\u0131l\u0131n\u0131n <strong>Mart ay<\/strong><strong>\u0131<\/strong><strong>nda<\/strong> yine \u00c7anakkale\u2019de bulunan <strong>30,6 MW kurulu g\u00fcc\u00fcndeki Kocalar RES<\/strong> projesini tamamlayarak devreye alan Akfen Yenilenebilir Enerji, \u00dc\u00e7p\u0131nar RES projesinin de tam kapasiteyle devreye girmesiyle toplam 143 MW\u2019l\u0131k r\u00fczgar portf\u00f6y\u00fcne ula\u015ft\u0131. \u015eirket bu sayede <strong>570 bin ki<\/strong><strong>\u015f<\/strong><strong>inin<\/strong> y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131 sadece r\u00fczg\u00e2rdan kar\u015f\u0131l\u0131yor.<\/p>\n<p>Akfen Yenilenebilir Enerji, Kocalar ve \u00dc\u00e7p\u0131nar RES\u2019in yan\u0131 s\u0131ra 2019 y\u0131l\u0131 i\u00e7erisinde \u00c7anakkale\u2019deki <strong>58 MW\u2019l<\/strong><strong>\u0131<\/strong><strong>k Hasanoba RES<\/strong> ve Denizli\u2019deki <strong>75 MW\u2019l<\/strong><strong>\u0131<\/strong><strong>k Denizli RES<\/strong> projelerinin tamamlan\u0131p elektrik \u00fcretimine ge\u00e7irecek. B\u00f6ylelikle \u015firketin 4 r\u00fczg\u00e2r elektrik santrali projesindeki kurulu g\u00fcc\u00fc 2019 y\u0131l\u0131 sonunda <strong>275 MW\u2019a<\/strong> ula\u015facak. \u015eirketin toplam g\u00fcc\u00fc ise in\u015faas\u0131 devam eden di\u011fer hidro ve g\u00fcne\u015f santrallerinin tamamlanmas\u0131 sonras\u0131nda <strong>632 MW\u2019a<\/strong> \u00e7\u0131kacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2020 y\u0131l\u0131na kadar T\u00fcrkiye\u2019de sadece yerli ve yenilenebilir kaynaklardan olu\u015fan 1000 MW\u2019l\u0131k enerji \u00fcretim santrali kapasitesine ula\u015fmay\u0131 hedefleyen Akfen Yenilenebilir Enerji, \u00c7anakkale\u2019de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95338,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[53237,3936,28245,4427,845,51018,53114,19,23416,50483,26043,47850,51017,474,35002,24949,35004,35035,53239,34977,53240,50527,51020,53241,53238,26829,12145],"views":823,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95336"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95336"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95336\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95338"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}