{"id":95232,"date":"2019-07-01T18:16:41","date_gmt":"2019-07-01T15:16:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95232"},"modified":"2019-07-01T18:21:45","modified_gmt":"2019-07-01T15:21:45","slug":"uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi\/","title":{"rendered":"(Turkish) \u00dcregen Enerji&#8217;den Ankara\u2019ya 5MW G\u00fcc\u00fcnde Biyogaz Tesisi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95232\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Ankara \u0130li, Polatl\u0131 \u0130l\u00e7esi&#8217;nde\u00a039.595 m2\u2019lik <img loading=\"lazy\" class=\"alignright size-medium wp-image-95235\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/07\/uregen-enerjiden-ankaraya-5mw-gucunde-biyogaz-tesisi.jpg 651w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>alan \u00fczerine \u00dcregen Enerji taraf\u0131ndan 5 MW kapasiteye sahip \u00dcregen Enerji Biyogaz Tesisi kurulacak.<\/strong><\/h1>\n<p>Yakla\u015f\u0131k 53 milyon lira yat\u0131r\u0131m bedeline sahip proje ile tar\u0131m ve hayvanc\u0131l\u0131kla u\u011fra\u015fanlardan toplanacak hayvansal (besi, s\u00fct ine\u011fi, tavuk d\u0131\u015fk\u0131s\u0131 vb.) at\u0131klardan biyogaz elde edilerek proses sonunda elektrik, \u0131s\u0131 ile birlikte kat\u0131 ve s\u0131v\u0131 fermente \u00fcr\u00fcn sa\u011flanacakt\u0131r.<\/p>\n<p>Kurulacak tesis g\u00fcnde ortalama 22 saat \u00e7al\u0131\u015fmayla 450 ton b\u00fcy\u00fckba\u015f hayvan d\u0131\u015fk\u0131s\u0131, 52 ton tavuk d\u0131\u015fk\u0131s\u0131 ve 24 ton tar\u0131msal kaynakl\u0131 bitkisel at\u0131k bertaraf etme kapasitesi olup 5,0 MWe kurulu g\u00fcc\u00fcnde elektrik enerjisi \u00fcretimi yapabilecektir. \u00dcretilen elektrik ise TM&#8217;ye ba\u011flanarak \u015febekeye aktar\u0131lacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ankara \u0130li, Polatl\u0131 \u0130l\u00e7esi&#8217;nde\u00a039.595 m2\u2019lik alan \u00fczerine \u00dcregen Enerji taraf\u0131ndan 5 MW kapasiteye sahip \u00dcregen Enerji Biyogaz Tesisi kurulacak. Yakla\u015f\u0131k 53 milyon [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95235,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[2674,33600,41508,52657,35122,41926,34979,26353,19,42030,11835,53131,30696,34977,53132,53130,26829],"views":1630,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95232"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95232"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95232\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95235"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}