{"id":95038,"date":"2019-06-28T09:58:54","date_gmt":"2019-06-28T06:58:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95038"},"modified":"2019-06-28T10:10:05","modified_gmt":"2019-06-28T07:10:05","slug":"sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi\/","title":{"rendered":"(Turkish) Sinop NGS&#8217;den Maliyet ve Zaman Uyu\u015fmazl\u0131\u011f\u0131 Nedeniyle Vazge\u00e7ildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95038\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye\u2019nin en kuzeyinde yer alan \u0130nceburun b\u00f6lgesinde Japon-Frans\u0131z i\u015f birli\u011fiyle yap\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclen projeye y\u00f6nelik k\u00f6t\u00fc haber Japonya da geldi.<\/h1>\n<p>2017&#8217;de temeli at\u0131lan n\u00fckleer santral projesine y\u00f6nelik Cumhurba\u015fkanl\u0131\u011f\u0131\u2019ndan yap\u0131lan resmi a\u00e7\u0131klama ile durduruldu\u011fu a\u00e7\u0131klan\u0131rken &#8220;Sinop n\u00fckleer enerji santrali projesinde arzu edilen noktada de\u011filiz. Japon taraf\u0131nca haz\u0131rlanan fizibilite \u00e7al\u0131\u015fmas\u0131 raporu ve maliyet analizi, Enerji ve Tabii Kaynaklar <img loading=\"lazy\" class=\"alignleft size-medium wp-image-95040\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/sinop-ngsden-maliyet-ve-zaman-uyusmazligi-nedeniyle-vazgecildi.jpg 868w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Bakanl\u0131\u011f\u0131m\u0131z ve di\u011fer gerekli kurumlar\u0131m\u0131z taraf\u0131ndan ayr\u0131nt\u0131s\u0131yla incelendi.&#8221; ifadelerine yer verildi.<\/p>\n<p>Ayr\u0131ca yap\u0131lan a\u00e7\u0131klamada; &#8220;Hem maliyet hem de takvim bak\u0131m\u0131ndan ba\u015flang\u0131\u00e7taki anla\u015fmam\u0131z ile uyum i\u00e7inde olmayan bir tabloyla kar\u015f\u0131la\u015ft\u0131k. Sinop n\u00fckleer enerji santralinin arzu etti\u011fimiz gibi ilerlememesi tabii ki \u00fcz\u00fcc\u00fc. Ne var ki, Japonya ile enerji i\u015f birli\u011fimizi sadece n\u00fckleer enerji alan\u0131yla s\u0131n\u0131rlam\u0131yoruz. Japonya ile temiz k\u00f6m\u00fcr, yenilenebilir enerji, Ar-Ge \u00e7al\u0131\u015fmalar\u0131, insan kaynaklar\u0131 geli\u015fimi ve ula\u015ft\u0131rma gibi \u00e7ok alanda birlikte \u00e7al\u0131\u015fabilece\u011fimizi d\u00fc\u015f\u00fcn\u00fcyoruz.\u201d denildi.<\/p>\n<p>Santralin in\u015fa s\u00fcrecine dair bug\u00fcne kadar bir\u00e7ok a\u00e7\u0131klama yap\u0131l\u0131rken Japonlar bir s\u00fcre \u00f6nce proje \u00fczerinde \u00e7al\u0131\u015fmay\u0131 b\u0131rakt\u0131klar\u0131n\u0131 belirtirken sonras\u0131nda yap\u0131lan a\u00e7\u0131klamalar\u0131n T\u00fcrkiye taraf\u0131ndan yap\u0131laca\u011f\u0131 ilave edilmi\u015fti. Sonu\u00e7 olarak Japon \u015firketleri ile Sinop n\u00fckleer enerji santrali projesinin art\u0131k \u2018ilerlemedi\u011fine\u2019 dair ilk \u00fcst d\u00fczey a\u00e7\u0131klama da ger\u00e7ekle\u015ftirilmi\u015f oldu&#8230;<\/p>\n<p>Sarp ALTINEL \/ Enerji Gazetesi &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin en kuzeyinde yer alan \u0130nceburun b\u00f6lgesinde Japon-Frans\u0131z i\u015f birli\u011fiyle yap\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclen projeye y\u00f6nelik k\u00f6t\u00fc haber Japonya da geldi. 2017&#8217;de temeli at\u0131lan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95040,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[7282,30873,34979,26353,19,42030,21919,67,1009,52259,1972,52938,23134,25480,34931,8006,34930,30503],"views":665,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95038"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95038"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95038\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95040"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95038"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95038"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}