{"id":95021,"date":"2019-06-28T00:15:04","date_gmt":"2019-06-27T21:15:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95021"},"modified":"2019-06-28T00:22:15","modified_gmt":"2019-06-27T21:22:15","slug":"cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) \u00c7in Si\u00e7uan\u2019da Lityum \u0130\u015fleme Tesisinin Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95021\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u00c7inli bir kurulu\u015f olan Chengtun taraf\u0131ndan Si\u00e7uan Eyaleti\u2019nde 60.000 ton kapasiteye <img loading=\"lazy\" class=\"alignleft wp-image-95023\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak-300x200.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/cin-sicuanda-lityum-isleme-tesisinin-kurulumu-yapilacak.jpg 720w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sahip lityum i\u015fleme tesisi kurulacak.<\/h1>\n<p>\u00c7in elektrik depolamas\u0131 alan\u0131n\u0131n kilit hammaddesi olan lityuma yat\u0131r\u0131m yapmay\u0131 s\u00fcrd\u00fcr\u00fcyor. \u00c7inli maden \u015firketlerinden Chengtun Mining Group Co Ltd., y\u0131ll\u0131k \u00fcretim kapasitesi 60 bin ton olan bir lityum i\u015fleme tesisi in\u015faat\u0131na ba\u015flayacak.<\/p>\n<p>Sichuan Daily&#8217;de yay\u0131mlanan habere g\u00f6re, tesis g\u00fcneybat\u0131 eyaleti Si\u00e7uan\u2019da kurulacak olunup tesis i\u00e7in toplam da 349,42 milyon dolar (2,4 milyar yuan) yat\u0131r\u0131m ger\u00e7ekle\u015ftirilecek ve tesis kademeli bir \u015fekilde kapasite art\u0131rarak 2023 y\u0131l\u0131nda tam kapasiteye ula\u015ft\u0131\u011f\u0131nda ise 30 bin ton lityum, 20 bin ton batarya seviyesinde lityum hidroksit ve 10 bin ton lityum karbonat \u00fcretilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7inli bir kurulu\u015f olan Chengtun taraf\u0131ndan Si\u00e7uan Eyaleti\u2019nde 60.000 ton kapasiteye sahip lityum i\u015fleme tesisi kurulacak. \u00c7in elektrik depolamas\u0131 alan\u0131n\u0131n kilit hammaddesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95023,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[52932,52925,886,45274,34979,19638,34980,26353,19,52923,31440,52928,52930,52926,52934,52931,52927,52924,52929,52933],"views":559,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95021"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95021"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95021\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95023"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}