{"id":95002,"date":"2019-06-27T15:50:13","date_gmt":"2019-06-27T12:50:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=95002"},"modified":"2019-06-27T15:52:48","modified_gmt":"2019-06-27T12:52:48","slug":"kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir\/","title":{"rendered":"(Turkish) K\u00fcresel Fotovoltaik (PV) Kurulu G\u00fcc\u00fc 2019 Y\u0131l\u0131nda 129 GW\u2019a Ula\u015fabilir"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/95002\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Londra merkezli ara\u015ft\u0131rma \u015firketi IHS Markit\u2019in yay\u0131nlad\u0131\u011f\u0131 \u201cPV Installations Tracker 2019\u201d \u00e7eyrek d\u00f6nem raporuna g\u00f6re, <img loading=\"lazy\" class=\"alignleft size-medium wp-image-95004\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/kuresel-fotovoltaik-pv-kurulu-gucu-2019-yilinda-129-gwa-ulasabilir.jpg 729w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>k\u00fcresel fotovoltaik (PV) kurulumlar\u0131 y\u0131ll\u0131k % 25\u2019lik art\u0131\u015f ile toplamda 129 GW\u2019a \u00e7\u0131kabilir.<\/h1>\n<p>IHS\u2019nin bir \u00f6nceki tahmini olan 123 GW g\u00fcc\u00fcn olumlu revize edildi\u011fi raporda, Bloomberg New Energy Finance (BNEF)\u2019\u0131n 125 GW-141 GW aral\u0131\u011f\u0131ndaki 2019 y\u0131l\u0131 tahminleri ile benzerlik g\u00f6steriyor. Tahminlere g\u00f6re, \u00c7in liderli\u011fini korumaya devam ederken, ABD ikinci en b\u00fcy\u00fck pazar olacak ve \u015firketlerin % 30 yat\u0131r\u0131m vergisi kredisinden (ITC) yararlanmas\u0131 pazar\u0131n b\u00fcy\u00fcmesini olumlu etkilemeyi s\u00fcrd\u00fcrecek.<\/p>\n<p>IHS Markit Avrupa pazar\u0131nda ise 2018\u2019de % 23\u2019ten % 12\u2019ye gerileyen PV kurulumlar\u0131n\u0131n, 2019 y\u0131l\u0131nda 19 GW\u2019ye ula\u015faca\u011f\u0131n\u0131 ve \u0130spanya\u2019n\u0131n toplam b\u00fcy\u00fcmenin % 60\u2019\u0131ndan sorumlu olaca\u011f\u0131n\u0131 belirtiyor.<\/p>\n<p>Asya\u2019n\u0131n, 2019 y\u0131l\u0131nda y\u00fczde 64 ile toplam kurulumlarda en y\u00fcksek paya sahip olaca\u011f\u0131 bunu % 16 ile Amerika k\u0131tas\u0131n\u0131n, % 15 ile Avrupa ve Afrika\u2019n\u0131n, y\u00fczde 5 ile\u00a0Orta Do\u011fu\u2019nun takip edece\u011fi \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Londra merkezli ara\u015ft\u0131rma \u015firketi IHS Markit\u2019in yay\u0131nlad\u0131\u011f\u0131 \u201cPV Installations Tracker 2019\u201d \u00e7eyrek d\u00f6nem raporuna g\u00f6re, k\u00fcresel fotovoltaik (PV) kurulumlar\u0131 y\u0131ll\u0131k % 25\u2019lik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95004,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[1198,2630,4559,886,52259,23416,52901,23133,34925,23131,37049,44455,50558,52900,50557,50560,50559],"views":734,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95002"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=95002"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/95002\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/95004"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=95002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=95002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=95002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}