{"id":9474,"date":"2013-04-11T09:57:15","date_gmt":"2013-04-11T06:57:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9474"},"modified":"2013-04-11T09:57:44","modified_gmt":"2013-04-11T06:57:44","slug":"ge-almanyanin-enerji-donusum-planini-destekliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-almanyanin-enerji-donusum-planini-destekliyor\/","title":{"rendered":"(Turkish) GE, Almanya\u2019n\u0131n Enerji D\u00f6n\u00fc\u015f\u00fcm Plan\u0131\u2019n\u0131 Destekliyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9474\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>GE\u2019nin Bavyera Tesisleri\u2019ndeki J920 FleXtra gaz motoru ile uygulanan kojenerasyon sistemi, Almanya\u2019n\u0131n Enerji D\u00f6n\u00fc\u015f\u00fcm Plan\u0131\u2019n\u0131 destekliyor. Almanya\u2019n\u0131n Enerji D\u00f6n\u00fc\u015f\u00fcm Plan\u0131 daha y\u00fcksek end\u00fcstriyel enerji verimlili\u011fi ama\u00e7l\u0131yor.<\/strong><\/p>\n<p>J920 FleXtra kurulumu, Almanya\u2019n\u0131n 2020 y\u0131l\u0131na kadar birle\u015fik \u0131s\u0131 ve g\u00fc\u00e7 sistemlerinden elde edilen enerjiyi \u00fclkenin toplam enerji \u00fcretiminin y\u00fczde 25\u2019ine \u00e7\u0131kartma hedefini destekliyor. GE\u2019nin en y\u00fcksek g\u00fc\u00e7l\u00fc Jenbacher gaz motoru, yenilik\u00e7i kojenerasyon geni\u015fleme projesine g\u00fc\u00e7 sa\u011fl\u0131yor.<\/p>\n<p>Rosenheim\u2019daki ek kojenerasyon santralinin resmi a\u00e7\u0131l\u0131\u015f\u0131nda konu\u015fan Bavyera \u00c7evre ve Sa\u011fl\u0131k Bakan\u0131 Dr. Marcel Huber, \u201cEnerji d\u00f6n\u00fc\u015f\u00fcm plan\u0131 ancak belediye \u00fcreticilerinin katk\u0131lar\u0131 da d\u00e2hil olmak \u00fczere ortak bir \u00e7abayla ger\u00e7ekle\u015ftirilebilir. Yenilik\u00e7i ve \u00e7a\u011fda\u015f elektrik santrallerine yap\u0131lan yat\u0131r\u0131mlar enerji d\u00f6n\u00fc\u015f\u00fcm plan\u0131m\u0131z\u0131n ba\u015far\u0131yla uygulanmas\u0131 i\u00e7in \u00f6nemli bir temel olu\u015fturuyor\u201d dedi.<\/p>\n<p><strong>ROSENHE\u0130M\u2019IN ENERJ\u0130 DA\u011eITIMINA G\u00dcVENL\u0130 VE \u00c7EVREC\u0130 S\u0130STEM<\/strong><\/p>\n<p>Projenin merkezinde, GE\u2019nin en b\u00fcy\u00fck Jenbacher gaz motoru olan, 9,5 MW g\u00fcc\u00fcnde, ecomagination onayl\u0131 J920 FleXtra yer al\u0131yor. GE\u2019nin yeni ve esnek g\u00fc\u00e7 \u00e7\u00f6z\u00fcm\u00fc, m\u00fc\u015fterilerin yerel enerji g\u00fcvenli\u011fi hedeflerine ula\u015fmalar\u0131na destek olmak i\u00e7in ekstra yenilik\u00e7ilik, g\u00fc\u00e7 ve verimlili\u011fi bir araya getiriyor.<\/p>\n<p>Stadtwerke Rosenheim\u2019\u0131n birle\u015fik kombine \u0131s\u0131 ve g\u00fc\u00e7 tesisleri ayr\u0131ca bir at\u0131k yakma tesisi ve \u00f6nceden kurulmu\u015f \u00fc\u00e7\u00fc 3,35 MW J620 motoru ve bir 4,4 MW iki kademeli Turbo Kompres\u00f6r\u2019e sahip J624 motoru olmak \u00fczere d\u00f6rt Jenbacher motoru bar\u0131nd\u0131r\u0131yor. Tesisin geli\u015ftirilen kojenerasyon uygulamas\u0131 (36,1 Mwel ve 43,8 MWth) art\u0131k 61 binden fazla n\u00fcfusu olan Rosenheim\u2019\u0131n elektrik ihtiyac\u0131n\u0131n yakla\u015f\u0131k y\u00fczde 40\u2019\u0131n\u0131 ve \u0131s\u0131nma ihtiya\u00e7lar\u0131n\u0131n yakla\u015f\u0131k y\u00fczde 20\u2019sini kar\u015f\u0131l\u0131yor.<\/p>\n<p><strong>ENERJ\u0130 D\u00d6N\u00dc\u015e\u00dcM PLANINA DO\u011eRU \u00d6NEML\u0130 B\u0130R ADIM<\/strong><\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/end\u00fcstriyel-enerji-verimliligi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9475\" title=\"end\u00fcstriyel-enerji-verimliligi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/end\u00fcstriyel-enerji-verimliligi-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/end\u00fcstriyel-enerji-verimliligi-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/end\u00fcstriyel-enerji-verimliligi-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/end\u00fcstriyel-enerji-verimliligi.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Almanya mevcut n\u00fckleer enerji santrallerini 2022 y\u0131l\u0131na kadar devreden \u00e7\u0131karmay\u0131 planl\u0131yor. H\u00fck\u00fcmetin enerji d\u00f6n\u00fc\u015f\u00fcm plan\u0131, n\u00fckleer enerji santrallerinin \u00fcretti\u011fi \u00e7ok b\u00fcy\u00fck miktardaki d\u00fc\u015f\u00fck karbon temelli elektrik miktar\u0131n\u0131 telafi etmek i\u00e7in do\u011falgaz ve yenilenebilir enerji kullan\u0131m\u0131n\u0131n artt\u0131r\u0131lmas\u0131n\u0131n yan\u0131 s\u0131ra, enerji verimlili\u011fine sahip teknolojilerin daha fazla kullan\u0131lmas\u0131n\u0131 \u00f6ng\u00f6r\u00fcyor.<\/p>\n<p>J920 FleXtra\u2019n\u0131n kurulumu, Stadtwerke Rosenheim\u2019\u0131n Almanya\u2019n\u0131n 2020 y\u0131l\u0131na kadar ula\u015fmay\u0131 \u00f6ng\u00f6rd\u00fc\u011f\u00fc \u00fclkenin toplam enerji \u00fcretiminin y\u00fczde 25\u2019ini Birle\u015fik Is\u0131 ve G\u00fc\u00e7 Sistemlerinden elde etme hedefine sa\u011flad\u0131\u011f\u0131 katk\u0131y\u0131 destekleyecek. Proje ayn\u0131 zamanda Avrupa Birli\u011fi enerji verimlili\u011fi ve \u00e7evre ile ilgili hedeflerini ger\u00e7ekle\u015ftirmek i\u00e7in yeni Birle\u015fik Is\u0131 ve G\u00fc\u00e7 sistemleri kurmak isteyen di\u011fer \u00fclkelere de \u00f6rnek te\u015fkil ediyor.<\/p>\n<p><strong>\u00c7EVREC\u0130, SA\u011eLAM, ESNEK VE VER\u0130ML\u0130<\/strong><\/p>\n<p>Yeni J920 FleXtra, Rosenheim kentine \u00f6nemli \u00e7evresel faydalar sa\u011fl\u0131yor. Do\u011falgazla \u00e7al\u0131\u015fan J920 Kojenerasyon sistemi, geleneksel enerji santrallerine g\u00f6re daha d\u00fc\u015f\u00fck karbon sal\u0131n\u0131m\u0131yla y\u00f6re halk\u0131na ve end\u00fcstriyel m\u00fc\u015fterilere elektrik ve termal g\u00fc\u00e7 (s\u0131cak su) sa\u011flayarak, Almanya\u2019n\u0131n 2020\u2019ye kadar sera gaz\u0131 sal\u0131n\u0131m\u0131n\u0131 y\u00fczde 40 azaltma \u00e7abalar\u0131na destek oluyor. Ayr\u0131ca, J920 FleXtra motorunun \u00e7ok k\u0131sa s\u00fcrede devreye girebilmesi, Stadtwerke Rosenheim\u2019\u0131n r\u00fczg\u00e2r, g\u00fcne\u015f ve di\u011fer yenilenebilir enerji kaynaklar\u0131n\u0131 daha fazla kullanmas\u0131ndan kaynaklanabilecek kesintilere kar\u015f\u0131 operasyonel esnekli\u011fe eri\u015fmesini sa\u011fl\u0131yor.<\/p>\n<p>Stadtwerke Rosenheim CEO\u2019su Dr. G\u00f6tz Br\u00fchl, \u201cGE\u2019nin J920 FleXtra gaz motoru teknolojisini kullanan yeni birle\u015fik \u00fcretim santralimiz, \u015firketlerimize ve konutlar\u0131m\u0131za g\u00fcvenilir, verimli ve daha esnek g\u00fc\u00e7 ve \u0131s\u0131 ula\u015ft\u0131rmam\u0131z\u0131 sa\u011flayacak\u201d a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131. GE J920 FleXtra, 10 MW s\u0131n\u0131f\u0131nda en y\u00fcksek elektrik verimlili\u011fine sahip ve y\u00fczde 48,7 elektrik verimlili\u011fi ile end\u00fcstriye liderlik etmenin yan\u0131 s\u0131ra kojenerasyon uygulamalar\u0131nda da y\u00fczde 90 verimlili\u011fe ula\u015facak \u015fekilde tasarland\u0131. J920 FleXtra\u2019n\u0131n yenilik\u00e7i iki kademeli turbo kompres\u00f6r tasar\u0131m\u0131, Stadtwerke Rosenheim\u2019\u0131n Almanya\u2019ya temel enerji kullan\u0131m\u0131na ili\u015fkin enerji verimlili\u011fini y\u0131lda y\u00fczde 2,1 artt\u0131rma hedefini ger\u00e7ekle\u015ftirmekte destek olacak.<\/p>\n<p>GE Power &amp; Water Elektrik \u00dcretiminde kullan\u0131lan Gaz Motorlar\u0131ndan Sorumlu Genel M\u00fcd\u00fcr\u00fc Karl Wetzlmayer, \u201cVerimlilik ve g\u00fcvenilirlik a\u00e7\u0131s\u0131ndan y\u00fcksek oranlar sunan ve esneklik sa\u011flayan J920 teknolojimiz hem y\u00fcksek g\u00fc\u00e7l\u00fc gaz motorlar\u0131 ile end\u00fcstriyel elektrik \u00fcretimi ve \u015febeke stabilizasyonu uygulamalar\u0131 i\u00e7in ideal bir \u00e7\u00f6z\u00fcm sunuyor, hem de t\u00fcketicinin karbon emisyonlar\u0131n\u0131 azalt\u0131yor\u201d ifadesini kulland\u0131.<\/p>\n<p>\u00d6nde gelen gaz motoru \u00fcreticilerinden biri olan GE, en yeni Jenbacher motorunun geli\u015ftirilmesine 50 y\u0131l\u0131 a\u015fk\u0131n enerji \u00fcretim deneyiminden faydaland\u0131. J920 FleXtra\u2019n\u0131n geli\u015ftirilme s\u00fcrecinde tasar\u0131m, analiz, test ve do\u011frulamaya yar\u0131m milyondan fazla m\u00fchendislik saati harcand\u0131. Ekip, yenilik\u00e7i analiz ve te\u015fhis ara\u00e7lar\u0131n\u0131n yan\u0131 s\u0131ra, GE\u2019nin k\u00fcresel m\u00fchendislik operasyonlar\u0131 ve K\u00fcresel Ara\u015ft\u0131rma Merkezi arac\u0131l\u0131\u011f\u0131yla geli\u015ftirilen teknoloji ve y\u00f6ntemleri kulland\u0131.<\/p>\n<p>Wetzlmayer, s\u00f6zlerine GE ve Stadtwerke Rosenheim\u2019\u0131n gaz motoru geli\u015ftirme ve i\u015fbirli\u011fi konusunda yakla\u015f\u0131k on y\u0131ll\u0131k bir ortak ge\u00e7mi\u015fe sahip oldu\u011funu ve bu nedenle hizmet tesisinin J920 FleXtra\u2019y\u0131 d\u00fcnyaya tan\u0131tmak i\u00e7in ideal bir ortak haline geldi\u011fini ekledi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/ge-almanya\u2019nin-enerji-donusum-plani\u2019ni-destekliyor_3106.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.GE\u2019nin Bavyera Tesisleri\u2019ndeki J920 FleXtra gaz motoru ile uygulanan kojenerasyon sistemi, Almanya\u2019n\u0131n Enerji D\u00f6n\u00fc\u015f\u00fcm Plan\u0131\u2019n\u0131 destekliyor. Almanya\u2019n\u0131n Enerji D\u00f6n\u00fc\u015f\u00fcm Plan\u0131 daha y\u00fcksek end\u00fcstriyel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9475,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[4363,63,67,103,12,4361,2422,4362,4360],"views":792,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9474"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9474"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9474\/revisions"}],"predecessor-version":[{"id":9477,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9474\/revisions\/9477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9475"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9474"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9474"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}