{"id":94678,"date":"2019-06-20T15:25:18","date_gmt":"2019-06-20T12:25:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=94678"},"modified":"2019-06-20T15:28:35","modified_gmt":"2019-06-20T12:28:35","slug":"turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin G\u00fcne\u015f Enerjisinde Kurulu G\u00fcc\u00fc 5,4 GW\u2019a \u00c7\u0131kt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/94678\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>EPDK taraf\u0131ndan May\u0131s ay\u0131 Lisans Kararlar\u0131 Resmi Gazete\u2019nin 16 Haziran 2019 tarihli ilgili say\u0131s\u0131nda yay\u0131nlan\u0131rken lisanss\u0131z elektrik \u00fcretimi dahil T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisinde dayal\u0131 kurulu g\u00fcc\u00fc ise May\u0131s&#8217;\u0131n sonu itibariyle 5,4 GW\u2019a \u00e7\u0131kt\u0131.<\/h1>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurulu taraf\u0131ndan 30 May\u0131s 2019 kararlar\u0131yla Apa GES ve K\u00fc\u00e7\u00fckk\u00f6y GES <img loading=\"lazy\" class=\"alignright wp-image-94680\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti.jpg\" alt=\"\" width=\"320\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti.jpg 844w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti-300x173.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti-768x444.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti-500x289.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/turkiyenin-gunes-enerjisinde-kurulu-gucu-54-gwa-cikti-80x46.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>projelerine y\u00f6nelik 49 y\u0131ll\u0131k elektrik \u00fcretim lisans\u0131 verildi.\u00a0Limak grubu i\u00e7inde yer alan, LE G\u00fcne\u015f Elektrik \u00dcretim A.\u015e. \u015firketine ait olan APA GES projesi 13,1 MW g\u00fcce sahip olacak.<\/p>\n<p>EPDK verilerinden derlenen bilgiye g\u00f6re May\u0131s sonu itibariyle elektrik \u00fcretim lisans\u0131 sa\u011flam\u0131\u015f GES projelerinin say\u0131s\u0131 23\u2019e, toplam kurulu g\u00fc\u00e7leri ise 234,36 MW\u2019a ula\u015fm\u0131\u015ft\u0131r.<\/p>\n<p>Bu projelerden toplam g\u00fc\u00e7leri 81,66 MW olan 9 adedi devreye girmi\u015f durumda olup kurulu g\u00fcc\u00fc 152,7 MW olan 14 adedinin in\u015fa \u00e7al\u0131\u015fmalar\u0131 ise s\u00fcrmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. EPDK taraf\u0131ndan May\u0131s ay\u0131 Lisans Kararlar\u0131 Resmi Gazete\u2019nin 16 Haziran 2019 tarihli ilgili say\u0131s\u0131nda yay\u0131nlan\u0131rken lisanss\u0131z elektrik \u00fcretimi dahil T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":94680,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[52554,52556,34979,19638,34980,26353,6013,21886,20026,23416,23133,23131,52555,52553,2282,1388],"views":920,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94678"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=94678"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94678\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/94680"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=94678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=94678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=94678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}