{"id":94291,"date":"2019-06-13T22:47:31","date_gmt":"2019-06-13T19:47:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=94291"},"modified":"2019-06-13T22:52:42","modified_gmt":"2019-06-13T19:52:42","slug":"total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi\/","title":{"rendered":"(Turkish) Total Eren&#8217;den Avustralya\u2019da 256.5 MW G\u00fcce Sahip G\u00fcne\u015f Santrali Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/94291\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Frans\u0131z \u00f6zel elektrik \u015firketi Total Eren SA taraf\u0131ndan Avustralya ve Avrupa finans kurumlar\u0131n\u0131n deste\u011fi al\u0131narak Kiamal G\u00fcne\u015f Enerjisi Santrali projesinin finansal anla\u015fmalar\u0131 tamamland\u0131.<\/h1>\n<h1><img loading=\"lazy\" class=\"alignleft size-medium wp-image-94293\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi-300x167.jpg\" alt=\"\" width=\"300\" height=\"167\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi-768x427.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi-500x278.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/total-erenden-avustralyada-256-5-mw-guce-sahip-gunes-santrali-yatirimi.jpg 877w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>Avustralya Victoria\u2019da kurulacak olan 256.5 MW kurulu g\u00fcce sahip olacak g\u00fcne\u015f enerjisi santraline y\u00f6nelik ANZ (Avustralya), ING (Hollanda) ve Natixis (Fransa) finans kurumlar\u0131ndan 175 milyon dolar finansman sa\u011flanm\u0131\u015f olup in\u015fa s\u00fcrecinde olan ve 2019&#8217;dan sonra ticari olarak elektrik \u00fcretecek olan santralin elektri\u011finin 1\/4&#8217;\u00fc yerel \u015firkete sat\u0131lacak.<\/p>\n<p>Total Eren, ilaveten Kiamal GES\u2019in 2&#8217;inci a\u015famas\u0131nda ise 213,5 MW kurulu g\u00fc\u00e7le b\u00fcy\u00fctmeyi planlarken Avustralya H\u00fck\u00fcmeti taraf\u0131ndan sahip olunan Ye\u015fil Banka konumundaki Clean Energy Finance Corporation\u2019\u0131n (CEFC) da projeden hisse alarak ortak oldu\u011funu da belirtti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Frans\u0131z \u00f6zel elektrik \u015firketi Total Eren SA taraf\u0131ndan Avustralya ve Avrupa finans kurumlar\u0131n\u0131n deste\u011fi al\u0131narak Kiamal G\u00fcne\u015f Enerjisi Santrali projesinin finansal anla\u015fmalar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":94293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[52230,24050,52229,29456,52235,34979,19638,26353,19,52237,52228,23416,34925,35037,23131,52231,52233,52236,52232,34977,52227,26829,52234],"views":796,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94291"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=94291"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94291\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/94293"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=94291"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=94291"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=94291"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}