{"id":94285,"date":"2019-06-13T19:11:33","date_gmt":"2019-06-13T16:11:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=94285"},"modified":"2019-06-13T19:16:36","modified_gmt":"2019-06-13T16:16:36","slug":"tayvanda-640mw-guce-sahip-denizustu-res-kurularak-hayata-gecirilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tayvanda-640mw-guce-sahip-denizustu-res-kurularak-hayata-gecirilecek\/","title":{"rendered":"(Turkish) Tayvan&#8217;da 640MW G\u00fcce Sahip Deniz\u00fcst\u00fc RES Hayata Ge\u00e7irilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/94285\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Tayvan&#8217;l\u0131 WPD Group taraf\u0131ndan Tayvan k\u0131y\u0131lar\u0131ndan 8 kilometre a\u00e7\u0131kta 640MW g\u00fcce <img loading=\"lazy\" class=\"alignleft size-medium wp-image-94287\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/tayvanda-640mw-gucunde-denizustu-res-kurulacak-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/tayvanda-640mw-gucunde-denizustu-res-kurulacak-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/tayvanda-640mw-gucunde-denizustu-res-kurulacak-768x431.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/tayvanda-640mw-gucunde-denizustu-res-kurulacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/tayvanda-640mw-gucunde-denizustu-res-kurulacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/tayvanda-640mw-gucunde-denizustu-res-kurulacak.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>sahip \u00fclkenin en b\u00fcy\u00fck deniz\u00fcst\u00fc r\u00fczgar santrali kurulacak.<\/h1>\n<p>R\u00fczgar santralinin kurulum \u00e7al\u0131\u015fmalar\u0131n\u0131n 2020&#8217;de ba\u015flamas\u0131 planlan\u0131rken Yunlin R\u00fczgar Enerjisi Santrali\u2019nde 80 adet 8 MW g\u00fcce sahip Siemens-Gamesa r\u00fczgar t\u00fcrbini kullan\u0131lacakt\u0131r.<\/p>\n<p>Bununla birlikte Japon Sojitz Corporation \u015firketinin liderli\u011finde olu\u015fturulan konsorsiyum ise Yunlin RES projesinden % 27 oran\u0131nda hisse alarak projenin orta\u011f\u0131 olmu\u015ftur.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tayvan&#8217;l\u0131 WPD Group taraf\u0131ndan Tayvan k\u0131y\u0131lar\u0131ndan 8 kilometre a\u00e7\u0131kta 640MW g\u00fcce sahip \u00fclkenin en b\u00fcy\u00fck deniz\u00fcst\u00fc r\u00fczgar santrali kurulacak. R\u00fczgar santralinin kurulum [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":94287,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[52218,52216,35002,35035,36999,52215,52217,18348,34977,52212,26829,52214,52213],"views":465,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94285"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=94285"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94285\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/94287"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=94285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=94285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=94285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}