{"id":94196,"date":"2019-06-12T16:46:33","date_gmt":"2019-06-12T13:46:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=94196"},"modified":"2019-06-12T17:40:45","modified_gmt":"2019-06-12T14:40:45","slug":"microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti\/","title":{"rendered":"Microsoft Announces a New Wind Energy Deal in The Netherlands"},"content":{"rendered":"<p><\/p>\n<h1>Microsoft this announced a new wind energy deal in the Netherlands. As part of this deal, Microsoft will purchase 90 MW from Borssele III\/IV belonging to wind farm developer Eneco. Microsoft will use this green energy to power its datacenters for 15 years starting in 2022.\u00a0This is Microsoft\u2019s 14th renewable energy deal and with this <img loading=\"lazy\" class=\"alignright size-medium wp-image-94198\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/microsoft-hollanda-ile-ruzgar-enerjisine-yonelik-anlasma-yapti.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>deal, Microsoft\u2019s total clean energy portfolio has reached 1.5 gigawatts.<\/h1>\n<p>\u201cOur purchasing of renewable energy helps improve the sustainability of our operations and local grids,\u201d said Brian Janous, general manager, Energy and Sustainability, Microsoft.<\/p>\n<p>\u201cTech companies are facing the challenge to reduce their carbon footprints, mostly due to the vast energy consumption of their datacenters,\u201d said Hans Peters, chief customer officer, Eneco. \u201cA global frontrunner like Microsoft does not see this as a challenge, but as an opportunity to boost the energy transition. We are proud we can help them switch to a sustainable, smart and clean energy supply in the Netherlands. As a result, Microsoft is creating local opportunity, growth and impact while enabling Eneco to continue to invest in large-scale renewable energy projects like Borssele III\/IV.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Microsoft this announced a new wind energy deal in the Netherlands. As part of this deal, Microsoft will purchase 90 MW from Borssele III\/IV belonging to wind farm developer Eneco. Microsoft will use this green energy to power its datacenters for 15 years starting in 2022.\u00a0This is Microsoft\u2019s 14th renewable energy deal and with this [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":94198,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[52142,52140,19,25591,52144,1287,52138,52139,11568,52141,52143,45820,35002,52137,24949,7040,35035,36999,19119,1787,40153,37032,34977,47804],"views":1533,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94196"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=94196"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94196\/revisions"}],"predecessor-version":[{"id":94202,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94196\/revisions\/94202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/94198"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=94196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=94196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=94196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}