{"id":94142,"date":"2019-06-11T23:12:23","date_gmt":"2019-06-11T20:12:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=94142"},"modified":"2019-06-11T23:20:42","modified_gmt":"2019-06-11T20:20:42","slug":"nordex-polonya-dan-94-mw-lik-projenin-kurulumu-icin-siparis-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordex-polonya-dan-94-mw-lik-projenin-kurulumu-icin-siparis-aldi\/","title":{"rendered":"(Turkish) &#8217;Nordex&#8217; Polonya\u2019dan 94 MW\u2019l\u0131k Projenin Kurulumu \u0130\u00e7in Sipari\u015f Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/94142\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Litvanyanl\u0131 Lietuvos Energija \u015firketi ile anla\u015fmaya varan Nordex, Polonya\u2019n\u0131n kuzeyinde ve Sztum kentine yak\u0131n olan Pomerania projesi i\u00e7in 28 adet N131\/3600\u00a0 ve 1 adet\u00a0N117\/3000 r\u00fczgar t\u00fcrbininden <img loading=\"lazy\" class=\"alignright wp-image-94156\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/nordex-polonya-dan-94-mw-lik-projenin-kurulumu-icin-siparis-aldi-300x163.jpg\" alt=\"\" width=\"340\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/nordex-polonya-dan-94-mw-lik-projenin-kurulumu-icin-siparis-aldi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/nordex-polonya-dan-94-mw-lik-projenin-kurulumu-icin-siparis-aldi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/nordex-polonya-dan-94-mw-lik-projenin-kurulumu-icin-siparis-aldi.jpg 460w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>tedarik ederek kurulumunu ger\u00e7ekle\u015ftirecek.<\/h1>\n<p>Lietuvos Energija ile bir kez daha \u00e7al\u0131\u015fman\u0131n memnuniyetini payla\u015fan Avrupa Nordex Grup CEO\u2019su Dr. Ilya Hartman, r\u00fczgar \u00e7iftli\u011finin b\u00fcy\u00fckl\u00fc\u011f\u00fc, uygun r\u00fczgar ko\u015fullar\u0131 ve etkili teknoloji sayesinde proje ile Polonya enerjisine \u00f6nemli \u00f6l\u00e7\u00fcde katk\u0131 sa\u011flayaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p>2020 y\u0131l\u0131n\u0131n yaz aylar\u0131nda tamamlanmas\u0131 planlanan projenin anla\u015fmas\u0131nda 15 y\u0131ll\u0131k Premium Hizmet S\u00f6zle\u015fmesi ( Bak\u0131m \/Onar\u0131m ve Teknik Servis Hizmeti ) de yer almaktad\u0131r.<\/p>\n<p>Zeynep TEKER \u2013 \u0130T\u00dc \/ \u00c7evre M\u00fchendisi \u2013\u00a0<a href=\"mailto:zeynepteker03@gmail.com\" target=\"_blank\" rel=\"noopener\">zeynepteker03@gmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Litvanyanl\u0131 Lietuvos Energija \u015firketi ile anla\u015fmaya varan Nordex, Polonya\u2019n\u0131n kuzeyinde ve Sztum kentine yak\u0131n olan Pomerania projesi i\u00e7in 28 adet N131\/3600\u00a0 ve [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":94156,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[48105,52100,52099,2455,36186,9906,52109,42477,35002,2511,24949,231,23318,34961,34960,36999,804,51052,48106],"views":730,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94142"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=94142"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94142\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/94156"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=94142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=94142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=94142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}