{"id":94121,"date":"2019-06-11T19:23:04","date_gmt":"2019-06-11T16:23:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=94121"},"modified":"2019-06-11T19:28:03","modified_gmt":"2019-06-11T16:28:03","slug":"demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) &#8217;Demirta\u015f Organize Sanayi B\u00f6lgesi&#8217;nde 3 MW&#8217;l\u0131k Ges Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/94121\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Bursa Demirta\u015f OSB&#8217;de 3 MW&#8217;l\u0131k g\u00fcne\u015f enerjisi santrali kurulmas\u0131na y\u00f6nelik ger\u00e7ekle\u015ftirilen ihaleyi kazanan firma yer teslimi sonras\u0131nda \u00e7al\u0131\u015fmalara ba\u015flayacak.<\/h1>\n<p><strong>CW Enerji<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>Volkan Y\u0131lmaz<\/strong> yapt\u0131\u011f\u0131 a\u00e7\u0131klamada Bursa b\u00f6lgesinde \u00f6rnek olacak bu proje en kaliteli \u00fcr\u00fcn, m\u00fchendislik ve i\u015f\u00e7ilikle hayata ge\u00e7irilece\u011fini belirtti.<\/p>\n<h2>&#8220;Herkes S\u00f6zle\u015fmendeki G\u00fcc\u00fc Kadar \u00c7at\u0131s\u0131na da G\u00fcne\u015f <img loading=\"lazy\" class=\"alignright wp-image-94123\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak-300x168.jpg\" alt=\"\" width=\"340\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak-768x431.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/demirtas-organize-sanayi-bolgesinde-3-mwlik-ges-kurulumu-yapilacak.jpg 990w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>Enerjisi Sistemi ve Santrali Kurabilir&#8221;<\/h2>\n<p>Ge\u00e7ti\u011fimiz g\u00fcnlerde y\u00fcr\u00fcrl\u00fc\u011fe giren ayl\u0131k mahsupla\u015fmay\u0131 da i\u00e7eren y\u00f6netmelik kapsam\u0131nda art\u0131k herkesin s\u00f6zle\u015fme g\u00fcc\u00fc kadar \u00e7at\u0131s\u0131na g\u00fcne\u015f enerjisi santrali kurabilece\u011fini dile getiren Y\u0131lmaz, ayl\u0131k mahsupla\u015fma sistemi sayesinde kullan\u0131c\u0131lar\u0131n gece t\u00fcketti\u011fi elektri\u011fi g\u00fcnd\u00fcz \u00fcretiminden mahsup edebilece\u011fini de belirtti.<\/p>\n<h2>&#8220;Y\u00f6netmelik Kapsam\u0131nda Yap\u0131lan G\u00fcne\u015f Enerjisi Santrali Yat\u0131r\u0131mlar\u0131yla Herkes Enerji Maliyetlerinden Kurtulacak&#8221;<\/h2>\n<p>Y\u0131lmaz ayr\u0131ca &#8220;Bu y\u00f6netmelikle yap\u0131lan g\u00fcne\u015f enerjisi santrali yat\u0131r\u0131mlar\u0131yla herkes enerji maliyetlerinden kurtulurken firmalar elektri\u011fe gelen zamdan etkilenmeyip t\u00fcketim fazlas\u0131n\u0131 ise sisteme vererek 10 y\u0131l s\u00fcreyle devlete satabilecek. B\u00f6ylece \u00fcretilen enerjinin tamam\u0131ndan faydalanabilecek.&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bursa Demirta\u015f OSB&#8217;de 3 MW&#8217;l\u0131k g\u00fcne\u015f enerjisi santrali kurulmas\u0131na y\u00f6nelik ger\u00e7ekle\u015ftirilen ihaleyi kazanan firma yer teslimi sonras\u0131nda \u00e7al\u0131\u015fmalara ba\u015flayacak. CW Enerji Genel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":94123,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[42935,52084,45404,39460,34868,2378,52083,34979,26353,19,42030,67,1009,9779,43864,23416,8733,23133,34925,23131,2054,34977,36284,26829],"views":869,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94121"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=94121"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/94121\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/94123"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=94121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=94121"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=94121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}