{"id":93995,"date":"2019-06-07T15:16:19","date_gmt":"2019-06-07T12:16:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93995"},"modified":"2019-06-07T17:43:47","modified_gmt":"2019-06-07T14:43:47","slug":"ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi\/","title":{"rendered":"(Turkish) &#8217;Ulusoy Elektrik&#8217; 235 Milyon Dolara Eaton Industries&#8217;e Devredildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93995\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Ulusoy Elektrik \u0130malat Taahh\u00fct Ticaret A\u015e\u2019nin \u0130rlanda merkezli Eaton Corporation Plc. \u015firketine sat\u0131\u015f s\u00fcreci % 90.015\u2019lik hisse <img loading=\"lazy\" class=\"alignright size-medium wp-image-93997\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ulusoy-elektrik-235-milyon-dolara-eaton-industriese-devredildi.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ile 235 milyon 90 bin 781.49 dolar bedelle tamamland\u0131.<\/h1>\n<p>\u015eirket\u2019in yapt\u0131\u011f\u0131 yaz\u0131l\u0131 a\u00e7\u0131klamada, Sait Ulusoy\u2019a ait % 39.93, Akg\u00fcl Ulusoy\u2019a ait % 18.43, Enis Ulusoy\u2019a ait % 11.98, Kubilay Hakk\u0131 Ulusoy\u2019a ait % 13.93\u2019l\u00fck Ulusoy Elektrik hisseleri, Eaton Industries XX Unlimited Company\u2019ye devredilirken toplam olarak 235 milyon 90 bin 781.49 dolar bedel \u00f6demesi yap\u0131ld\u0131.<\/p>\n<p>Hisse devrinden sonra Ulusoy Elektrik\u2019in y\u00f6netim kurulu da de\u011fi\u015firken\u00a0Halka a\u00e7\u0131k % 9.85\u2019lik k\u0131s\u0131ml\u0131k pay sahibi di\u011fer hissedarlar ise bu paylar\u0131n\u0131 talep ettikleri takdirde Eaton Industries\u2019e sat\u0131\u015f i\u015flemlerini <strong>11 Haziran &#8211; 8 Temmuz<\/strong> tarihleri aral\u0131\u011f\u0131nda yapabilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ulusoy Elektrik \u0130malat Taahh\u00fct Ticaret A\u015e\u2019nin \u0130rlanda merkezli Eaton Corporation Plc. \u015firketine sat\u0131\u015f s\u00fcreci % 90.015\u2019lik hisse ile 235 milyon 90 bin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93997,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[45737,51975,51978,51977,34979,19638,34980,26353,67,1009,45739,51976,15050,13228,45738,45736,19390,51979,51974],"views":1582,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93995"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93995"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93997"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}