{"id":93893,"date":"2019-06-05T22:34:21","date_gmt":"2019-06-05T19:34:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93893"},"modified":"2019-06-05T22:38:32","modified_gmt":"2019-06-05T19:38:32","slug":"antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Antalya\u2019da 6 MW G\u00fcce Sahip HES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93893\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Hayatsu Enerji \u00dcretim taraf\u0131ndan Antalya&#8217;n\u0131n G\u00fcndo\u011fmu\u015f il\u00e7esinde yer alan Alara ve K\u00fc\u00e7\u00fck \u00c7ay \u00fczerinde Hayat 1-2 Reg\u00fclat\u00f6r\u00fc ve HES kurulacakt\u0131r.<\/h1>\n<p><strong>7,27 MWm \/ 5,9 MWe<\/strong> g\u00fcc\u00fcnde &#8220;Nehir Tipi Santral&#8221; olarak planlanm\u0131\u015f projenin tahmini 47 milyon liraya sahip bir yat\u0131r\u0131m bedeli olacak olup proje \u00e7er\u00e7evesinde ilk \u00f6nce <strong>B\u00fcy\u00fck \u00c7ay<\/strong> \u00fczerinde kurulacak <img loading=\"lazy\" class=\"alignright size-medium wp-image-93896\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak-500x272.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/antalyada-6-mw-guce-sahip-hes-kurulumu-yapilacak.jpg 725w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><strong>Hayat 1-2 Reg\u00fclat\u00f6r\u00fc<\/strong> ve <strong>HES \u00fcnitesi<\/strong> taraf\u0131ndan \u00e7evrilerek y\u0131ll\u0131k <strong>5.077.906 kWh<\/strong> elektrik \u00fcretimi ger\u00e7ekle\u015fecektir. \u0130lerleyen s\u00fcre\u00e7 i\u00e7inde B\u00fcy\u00fck \u00c7ay sular\u0131 Hayat 1-2 HES\u2019in yakla\u015f\u0131k 1 km mansab\u0131nda kurulacak <strong>Hayat 1-1 Reg\u00fclat\u00f6r\u00fc ve HES \u00dcnitesi<\/strong> taraf\u0131ndan y\u0131ll\u0131k 6.110.752 kWh elektrik \u00fcretimi yap\u0131lacakt\u0131r. Bunlar\u0131n d\u0131\u015f\u0131nda birde <strong>K\u00fc\u00e7\u00fck \u00c7ay<\/strong> \u00fczerine kurulacak olan <strong>Hayat 2 Reg\u00fclat\u00f6r\u00fc<\/strong> ve <strong>G\u00f6c\u00fck Deresi<\/strong> \u00fczerinde toplanan sular\u0131n\u00a0<strong>Hayat 2 HES<\/strong>\u2019e d\u00fc\u015f\u00fcr\u00fclmesi ile y\u0131ll\u0131k 7.955.535 kWh enerji \u00fcretimi yap\u0131lacakt\u0131r.<\/p>\n<p>Projeye y\u00f6nelik 2010&#8217;da verilen \u00c7evre Etki De\u011ferlendirmesi Gerekli De\u011fildir karar\u0131, 2013&#8217;te mahkeme karar\u0131yla bozulmu\u015f olup Antalya 1. \u0130dari Mahkemesinin iptal karar\u0131ndan sonra, yerel halk\u0131n tepkisi ve istekleri dikkate al\u0131narak projede revizyona gidilerek revize fizibilite raporu haz\u0131rlanm\u0131\u015ft\u0131r. Haz\u0131rlanan rapor DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019ne sunulurken DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan uygun bulunmu\u015ftur. \u015eu an da ise projeye y\u00f6nelik \u00c7ED s\u00fcreci ba\u015flam\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Hayatsu Enerji \u00dcretim taraf\u0131ndan Antalya&#8217;n\u0131n G\u00fcndo\u011fmu\u015f il\u00e7esinde yer alan Alara ve K\u00fc\u00e7\u00fck \u00c7ay \u00fczerinde Hayat 1-2 Reg\u00fclat\u00f6r\u00fc ve HES kurulacakt\u0131r. 7,27 MWm [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93896,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[51876,5201,51868,51866,2878,51867,5114,34979,26353,19,67,1009,51873,51871,51869,51877,51874,51872,51875,26043,51870,26044,9011,34977,26829],"views":1028,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93893"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93893"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93893\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93896"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}