{"id":93778,"date":"2019-06-03T14:31:57","date_gmt":"2019-06-03T11:31:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93778"},"modified":"2019-06-03T14:34:37","modified_gmt":"2019-06-03T11:34:37","slug":"facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi\/","title":{"rendered":"(Turkish) Facebook&#8217;tan 379 MW G\u00fcc\u00fcnde G\u00fcne\u015f Santrali (GES) Yat\u0131r\u0131m\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93778\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>ABD\u2019nin \u00f6nde gelen yenilenebilir enerji \u00fcreticisi Longroad Energy taraf\u0131ndan Facebook&#8217;tan sa\u011flanan finansman deste\u011fiyle\u00a0Teksas\u2019taki 379 MW g\u00fcc\u00fcnde <img loading=\"lazy\" class=\"alignright size-medium wp-image-93780\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/facebooktan-379-mw-gucunde-gunes-santrali-ges-yatirimi.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>g\u00fcne\u015f enerjisi santrali projesine y\u00f6nelik yat\u0131r\u0131m yap\u0131laca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/h1>\n<p>Facebook\u2019un yenilenebilir enerjine y\u00f6nelik ilk do\u011frudan yat\u0131r\u0131m\u0131 olaca\u011f\u0131 ve bunun 2020 y\u0131l\u0131nda tamamlanaca\u011f\u0131 ve santralin in\u015fas\u0131 Andrews County\u2019deki Prospero g\u00fcne\u015f park\u0131nda yap\u0131lacakt\u0131r.<\/p>\n<p>Swinerton Yenilenebilir Enerji, projenin m\u00fchendislik, tedarik ve in\u015faat (EPC) y\u00fcklenicisi olarak belirlenirken ABD merkezli First Solar Inc. fotovoltaik panel tedarik\u00e7isi olaca\u011f\u0131 ve invert\u00f6rler ve izleyicilerin Toshiba Mitsubishi Electric End\u00fcstriyel Sistemler Corp (TMEIC) ve NEXTracker taraf\u0131ndan sa\u011flanaca\u011f\u0131 belirtildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ABD\u2019nin \u00f6nde gelen yenilenebilir enerji \u00fcreticisi Longroad Energy taraf\u0131ndan Facebook&#8217;tan sa\u011flanan finansman deste\u011fiyle\u00a0Teksas\u2019taki 379 MW g\u00fcc\u00fcnde g\u00fcne\u015f enerjisi santrali projesine y\u00f6nelik yat\u0131r\u0131m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93780,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[1198,51746,67,1009,23942,51749,51750,28351,23416,35039,45942,36334,34925,51745,51753,51747,51748,16997,34977,51752,51751,26829,21119],"views":595,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93778"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93778"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93778\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93780"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93778"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93778"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93778"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}