{"id":93738,"date":"2019-06-02T23:59:19","date_gmt":"2019-06-02T20:59:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93738"},"modified":"2019-06-03T00:01:06","modified_gmt":"2019-06-02T21:01:06","slug":"saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak\/","title":{"rendered":"(Turkish) &#8217;Sa\u011flam Metal&#8217; \u00c7at\u0131s\u0131na 535 kW GES Kurulumu Yapt\u0131racak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93738\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Eriko\u011flu SunSystem ve Sa\u011flam Metal, g\u00fcn\u00fcm\u00fczde h\u0131zla artan elektrik maliyetlerine \u00e7\u00f6z\u00fcm olu\u015fturmak do\u011faya ve ekonomiye katk\u0131 sa\u011flamak i\u00e7in Sa\u011flam Metal A\u015e\u2018ye ait t\u00fcm fabrikalar\u0131n\u0131 kapsamakta olan<img loading=\"lazy\" class=\"alignright size-medium wp-image-93740\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/saglam-metal-catisina-535-kw-ges-kurulumu-yaptiracak.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> \u00f6nemli bir i\u015fbirli\u011fine giderek Bal\u0131kesir\u2019de yer alan fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na 535 kWp kurulu g\u00fcce sahip GES kurulumu konusunda anla\u015ft\u0131.<\/h1>\n<p>Projeyle Bal\u0131kesir Organize Sanayi B\u00f6lgesi\u2019nde ilk \u00f6zel kurulu\u015fun giri\u015fimi de hayata ge\u00e7irilecektir.<\/p>\n<p>\u00c7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santrali&#8217;nin devreye girmesiyle Eriko\u011flu SunSystem \u00e7at\u0131 \u00fcst\u00fc GES kurulumlar\u0131ndaki tecr\u00fcbesine bir yenisini daha ekleyerek bak\u0131m ve i\u015fletme a\u015famas\u0131nda da Sa\u011flam Metal&#8217;e hizmet verecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eriko\u011flu SunSystem ve Sa\u011flam Metal, g\u00fcn\u00fcm\u00fczde h\u0131zla artan elektrik maliyetlerine \u00e7\u00f6z\u00fcm olu\u015fturmak do\u011faya ve ekonomiye katk\u0131 sa\u011flamak i\u00e7in Sa\u011flam Metal A\u015e\u2018ye ait [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93740,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[3613,51724,51723,26659,34979,1566,34980,26353,51721,51722],"views":1012,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93738"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93738"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93738\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93740"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}