{"id":93732,"date":"2019-06-02T22:22:51","date_gmt":"2019-06-02T19:22:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93732"},"modified":"2019-06-02T22:27:26","modified_gmt":"2019-06-02T19:27:26","slug":"maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor\/","title":{"rendered":"(Turkish) &#8217;Maren Nezihe Beren JES&#8217;in Yeri ve Kapasitesinde De\u011fi\u015fime Gidiliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93732\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Maren Mara\u015f Elektrik taraf\u0131ndan Ayd\u0131n \/ Germencik&#8217;te kurulacak olan Nezihe Beren<\/h1>\n<h1><img loading=\"lazy\" class=\"alignright size-medium wp-image-93734\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/maren-nezihe-beren-jesin-yeri-ve-kapasitesinde-degisime-gidiliyor.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<h1>JES\u2019in yeri de\u011fi\u015fecek kapasitesi ise 24 MW\u2019a indirilecektir.<\/h1>\n<p>Maren Mara\u015f Elektrik \u00dcretimi A.\u015e.&#8217;nin J-552 ruhsat nolu sahada kurulmas\u0131 planlanan 33 MW g\u00fcce sahip Nezihe Beren Jeotermal Santrali i\u00e7in yer ve kapasite de\u011fi\u015fikli\u011fine gidilerek bu \u00e7er\u00e7evede kurulmas\u0131 ve i\u015fletilmesi planlanmaktad\u0131r.<\/p>\n<p>Revizesi yap\u0131lm\u0131\u015f santralin kurulu g\u00fcc\u00fc 24 MWe olurken yat\u0131r\u0131m bedeli 95 milyon lira de\u011ferinde olup proje kapsam\u0131nda binary \u00e7evrim santrali teknolojisi yer alacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Maren Mara\u015f Elektrik taraf\u0131ndan Ayd\u0131n \/ Germencik&#8217;te kurulacak olan Nezihe Beren JES\u2019in yeri de\u011fi\u015fecek kapasitesi ise 24 MW\u2019a indirilecektir. Maren Mara\u015f Elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93734,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[7321,51720,67,1009,16077,34986,34985,36184,24817,51718,51719],"views":1180,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93732"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93732"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93732\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93734"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93732"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93732"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}