{"id":93704,"date":"2019-06-01T12:12:58","date_gmt":"2019-06-01T09:12:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93704"},"modified":"2019-06-01T12:16:40","modified_gmt":"2019-06-01T09:16:40","slug":"english-ruzgar-yeka-2-ihalesi-gerceklestirildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/english-ruzgar-yeka-2-ihalesi-gerceklestirildi\/","title":{"rendered":"(Turkish) R\u00fczgar &#8216;YEKA-2&#8217; \u0130halesi Ger\u00e7ekle\u015ftirildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93704\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan Ayd\u0131n, Mu\u011fla, Bal\u0131kesir ve \u00c7anakkale ba\u011flant\u0131 b\u00f6lgelerine y\u00f6nelik R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA RES-2) ihalesi 9 \u015firketin kat\u0131l\u0131m\u0131 ile ba\u015flarken ihalenin komisyon ba\u015fkanl\u0131\u011f\u0131n\u0131 Enerji ve Tabii Kaynaklar Bakan Yard\u0131mc\u0131s\u0131 Abdullah Tancan ger\u00e7ekle\u015ftirdi.<\/h1>\n<p>YEKA-2 ile daha \u00f6nce yap\u0131lm\u0131\u015f bin megavat r\u00fczgar YEKA&#8217;dan sonra 4 b\u00f6lgede 250&#8217;\u015fer megavat olmak \u00fczere 2000 MW&#8217;\u0131n T\u00fcrkiye&#8217;ye kazand\u0131r\u0131lmas\u0131 hedefleniyor.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-93707 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ruzgar-yeka-2-ihalesi-gerceklestirildi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ruzgar-yeka-2-ihalesi-gerceklestirildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ruzgar-yeka-2-ihalesi-gerceklestirildi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ruzgar-yeka-2-ihalesi-gerceklestirildi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/06\/ruzgar-yeka-2-ihalesi-gerceklestirildi.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Ayd\u0131n, Mu\u011fla, Bal\u0131kesir ve \u00c7anakkale ba\u011flant\u0131 b\u00f6lgelerine y\u00f6nelik a\u00e7\u0131k eksiltme usul\u00fcyle yap\u0131lan ihaleye kat\u0131l\u0131m <span style=\"text-decoration: underline;\">sa\u011flayan \u015firketler ise;<\/span><\/p>\n<p>&#8211; Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd. \u015eti.<\/p>\n<p>&#8211; Enerjisa \u00dcretim Santralleri A\u015e<\/p>\n<p>&#8211; Eze \u0130n\u015faat A\u015e<\/p>\n<p>&#8211; \u0130klim Elektrik Yat\u0131r\u0131m Sanayi ve Ticaret A\u015e<\/p>\n<p>&#8211; Bey\u00e7eli\u0307k Elewan Yeni\u0307lenebi\u0307li\u0307r Enerji\u0307 \u00dcreti\u0307m A\u015e<\/p>\n<p>&#8211; Res Anatolia Holdi\u0307ng A\u015e<\/p>\n<p>&#8211; B. Erg\u00fcnler Yol Yap\u0131 \u0130n\u015faat Taah. Madenci\u0307li\u0307k Nakli\u0307yeci\u0307li\u0307k San. Ti\u0307c. A\u015e<\/p>\n<p>&#8211; \u00c7ini\u0307li\u0307 Res Enerji\u0307 \u00dcreti\u0307m San. Ti\u0307c. A\u015e<\/p>\n<p>&#8211; Gem Wind Enerji Sanayi Ticaret A\u015e<\/p>\n<h2>AYDIN \u0130\u00e7in En D\u00fc\u015f\u00fck Fiyat Enerjisa \u00dcretim Santralleri A.\u015e Taraf\u0131ndan Sunuldu<\/h2>\n<p>Ayd\u0131n ba\u011flant\u0131 b\u00f6lgesine y\u00f6nelik 250 mw g\u00fcc\u00fcndeki ilk ihalede kilovatsaat ba\u015f\u0131na en d\u00fc\u015f\u00fck teklifi 4,56 dolar\/cent ile Enerjisa \u00dcretim Santralleri A\u015e kazand\u0131.<\/p>\n<h2>Mu\u011fla \u0130\u00e7in En D\u00fc\u015f\u00fck Fiyat Enercon \u00dcretim Santralleri A.\u015e Taraf\u0131ndan Sunuldu<\/h2>\n<p>Mu\u011fla ba\u011flant\u0131 b\u00f6lgesinin 250 megavatl\u0131k ihalesinde ise kilovatsaat ba\u015f\u0131na en d\u00fc\u015f\u00fck teklifi 4,00 dolar\/cent ile Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd. \u015eti. kazand\u0131.<\/p>\n<h2>Bal\u0131kesir&#8217;de En D\u00fc\u015f\u00fck Fiyat Enercon \u00dcretim Santralleri A.\u015e Taraf\u0131ndan Sunuldu<\/h2>\n<p>Bal\u0131kesir ba\u011flant\u0131 b\u00f6lgesinin 250 megavatl\u0131k ihalesinde ise kilovatsaat ba\u015f\u0131na en d\u00fc\u015f\u00fck teklifi 3,53 dolar\/cent ile Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd. \u015eti. kazand\u0131.<\/p>\n<h2>\u00c7anakkala&#8217;de En D\u00fc\u015f\u00fck Fiyat Enerjisa \u00dcretim Santralleri A.\u015e\u00a0 Taraf\u0131ndan Sunuldu<\/h2>\n<p>\u00c7anakkale ba\u011flant\u0131 b\u00f6lgesinin 250 mw ihalesinde ise kilovatsaat ba\u015f\u0131na en d\u00fc\u015f\u00fck teklifi 3,67 dolar\/cent ile Enerjisa \u00dcretim Santralleri A\u015e kazand\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan Ayd\u0131n, Mu\u011fla, Bal\u0131kesir ve \u00c7anakkale ba\u011flant\u0131 b\u00f6lgelerine y\u00f6nelik R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA RES-2) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93707,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[32584,7179,3613,51691,4427,51694,51693,67,1009,1972,35365,39353,3089,35002,24949,35004,51695,23318,34961,34960,51692],"views":878,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93704"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93704"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93704\/revisions"}],"predecessor-version":[{"id":93705,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93704\/revisions\/93705"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93707"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}