{"id":93416,"date":"2019-05-28T10:48:56","date_gmt":"2019-05-28T07:48:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93416"},"modified":"2019-05-28T10:50:10","modified_gmt":"2019-05-28T07:50:10","slug":"amasyada-22-mw-guce-sahip-karayel-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak\/","title":{"rendered":"(Turkish) Amasya\u2019da 22 MW G\u00fcce Sahip &#8216;Karayel HES&#8217; Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93416\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Hameka Hidroelektrik Enerji \u00dcretim A.\u015e. taraf\u0131ndan, Amasya&#8217;n\u0131n Ta\u015fova il\u00e7esinde Ye\u015fil\u0131rmak \u00fczerinde her biri 5,60 MWm \/ 5,40 MWe (toplam 22,4 MWm\/21,6 MWe) <img loading=\"lazy\" class=\"alignleft size-medium wp-image-93418\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak-300x162.jpg\" alt=\"\" width=\"300\" height=\"162\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak-300x162.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak-768x415.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak-500x270.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/amasyada-22-mw-guce-sahip-karayel-hes-kurulacak.jpg 794w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kurulu g\u00fcce sahip \u201cKarayel HES Projesi\u201d yap\u0131lacakt\u0131r.<\/h1>\n<p>180 milyon lira yat\u0131r\u0131m bedeli olan projeyle 5,60 MWm \/ 5,40 MWe kurulu g\u00fcc\u00fcnde Karayel I Reg\u00fclat\u00f6r\u00fc ve HES, 5.60 MWm \/ 5.40 MWe kurulu g\u00fcc\u00fcne sahip Karayel II Reg\u00fclat\u00f6r\u00fc ve HES ve 5.60 MWm \/ 5.40 MWe kurulu g\u00fcc\u00fcnde Karayel IV Reg\u00fclat\u00f6r\u00fc ve HES kurulacakt\u0131r. Projenin ekonomik \u00f6mr\u00fcn\u00fcn 49 y\u0131l olmas\u0131 planlan\u0131rken in\u015faat ise yakla\u015f\u0131k 2 y\u0131l s\u00fcrecektir.<\/p>\n<p>Santrallerin \u00fcretti\u011fi elektrik tek devre 3\/0 AWG hatla 2.1 km mesafede yer alan trafo merkezine (TM) aktar\u0131lacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Hameka Hidroelektrik Enerji \u00dcretim A.\u015e. taraf\u0131ndan, Amasya&#8217;n\u0131n Ta\u015fova il\u00e7esinde Ye\u015fil\u0131rmak \u00fczerinde her biri 5,60 MWm \/ 5,40 MWe (toplam 22,4 MWm\/21,6 MWe) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93418,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[3148,42030,67,1009,51449,26043,26044,51446,51447,34977,51448,24244,26829,27772],"views":1554,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93416"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93416"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93416\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93418"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}