{"id":93265,"date":"2019-05-25T00:01:07","date_gmt":"2019-05-24T21:01:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93265"},"modified":"2019-05-25T00:03:13","modified_gmt":"2019-05-24T21:03:13","slug":"filistinde-kurulan-ilk-gunes-enerjisi-santrali-elektrik-uretimine-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/filistinde-kurulan-ilk-gunes-enerjisi-santrali-elektrik-uretimine-basliyor\/","title":{"rendered":"(Turkish) Filistin\u2019de Kurulan \u0130lk &#8216;G\u00fcne\u015f Enerjisi Santrali&#8217; Elektrik \u00dcretimine Ba\u015fl\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93265\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130srail\u2019den sa\u011flanan elektri\u011fe ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in Filistin&#8217;de g\u00fcne\u015f enerjisi santralinin kurulmas\u0131na y\u00f6nelik haz\u0131rl\u0131klar devam ederken Filistin\u2019de yap\u0131lmas\u0131 planlanan 4 g\u00fcne\u015f enerjisi santralinin <img loading=\"lazy\" class=\"alignright size-medium wp-image-93267\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/filistinde-kurulan-gunes-enerjisi-santrali-elektrik-uretimine-basliyor-300x226.jpg\" alt=\"\" width=\"300\" height=\"226\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/filistinde-kurulan-gunes-enerjisi-santrali-elektrik-uretimine-basliyor-300x226.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/filistinde-kurulan-gunes-enerjisi-santrali-elektrik-uretimine-basliyor-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/filistinde-kurulan-gunes-enerjisi-santrali-elektrik-uretimine-basliyor.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>in\u015fas\u0131na y\u00f6nelik zemin haz\u0131rlayan ilk santral ise 7.5 MW kurulu g\u00fcce sahip olacak.<\/h1>\n<p>International Middle East Media Center\u2019\u0131n haberine g\u00f6re, Filistinliler \u00f6n\u00fcm\u00fczdeki 10 y\u0131l i\u00e7inde \u0130srail\u2019den ald\u0131\u011f\u0131 elektri\u011fi % 50 oran\u0131nda azaltma planlar\u0131n\u0131n bir par\u00e7as\u0131 olan 20.000 g\u00fcne\u015f panelinden meydana gelen <strong>7.5MW<\/strong> g\u00fcc\u00fcndeki <strong>Nur Jericho GES<\/strong>\u2019in a\u00e7\u0131l\u0131\u015f\u0131n\u0131n yap\u0131ld\u0131\u011f\u0131n\u0131 duyururken yap\u0131lmas\u0131 planlanan 4 g\u00fcne\u015f enerjisi santralinden birisinin ise \u00c7in h\u00fck\u00fcmeti taraf\u0131ndan ba\u011f\u0131\u015fland\u0131\u011f\u0131 da a\u00e7\u0131kland\u0131.<\/p>\n<p>Filistin\u2019deki enerji t\u00fcketiminin yakla\u015f\u0131k %30\u2019unun g\u00fcne\u015ften sa\u011flanaca\u011f\u0131n\u0131 a\u00e7\u0131klan\u0131rken Bat\u0131 \u015eeria\u2019da ise y\u0131lda yakla\u015f\u0131k 700 milyon dolar elektrik harcamas\u0131 oldu\u011fu bilinmektedir. Filistin\u2019deki Nuwimeh\u2019in do\u011fusundaki 100 d\u00f6n\u00fcm bir arsa \u00fczerine kurulu g\u00fcne\u015f enerjisi park\u0131 olan Noor (\u0131\u015f\u0131k) Jericho Fotovoltaik (PV) G\u00fcne\u015f Park\u0131, Filistin Yat\u0131r\u0131m Fonu (Massader) taraf\u0131ndan kurulmu\u015f olup toplam da 4 santralden meydana gelen projenin 8 y\u0131lda tamamlanarak g\u00fcne\u015f enerjisinden 200 MW kurulu g\u00fc\u00e7 elde edilmesi planlanmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130srail\u2019den sa\u011flanan elektri\u011fe ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in Filistin&#8217;de g\u00fcne\u015f enerjisi santralinin kurulmas\u0131na y\u00f6nelik haz\u0131rl\u0131klar devam ederken Filistin\u2019de yap\u0131lmas\u0131 planlanan 4 g\u00fcne\u015f enerjisi santralinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93267,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[21637,34979,26353,19,67,1009,148,11862,51357,35038,23416,23133,34925,35037,23131,254,51356,51355,34977,26829],"views":766,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93265"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93265"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93265\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93267"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}