{"id":93195,"date":"2019-05-24T11:25:57","date_gmt":"2019-05-24T08:25:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93195"},"modified":"2019-05-24T11:37:11","modified_gmt":"2019-05-24T08:37:11","slug":"engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim\/","title":{"rendered":"(Turkish) Engie ve EDP&#8217;den (Offshore) Deniz \u00dcst\u00fc R\u00fczgara 15 Milyon Euroluk Yat\u0131r\u0131m!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93195\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Frans\u0131z Devleti&#8217;ne ait bir kurulu\u015f olan Engie ve Portekizli EDP taraf\u0131ndan Danimarka&#8217;l\u0131 Orsted \u015firketinden sonra d\u00fcnyan\u0131n 2&#8217;inci deniz\u00fcst\u00fc (offshore) r\u00fczg\u00e2r enerjisi geli\u015ftiricisi olunmaya y\u00f6nelik 15 milyar <img loading=\"lazy\" class=\"alignright wp-image-93197 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim-300x177.jpg\" alt=\"\" width=\"300\" height=\"177\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim-300x177.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim-500x295.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/engie-ve-edpden-offshore-deniz-ustu-ruzgara-15-milyon-euroluk-yatirim.jpg 645w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>avroluk dev yat\u0131r\u0131m ger\u00e7ekle\u015ftirilecek.<\/h1>\n<p>\u00c7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrmekte olan \u015firketlerin \u015fu anda faaliyette hen\u00fcz deniz\u00fcst\u00fc (offshore) r\u00fczgar santrali olmaz iken \u015firketler t\u00fcm deniz\u00fcst\u00fc r\u00fczgar varl\u0131klar\u0131 ve projelerini birle\u015ftirme yoluna gidecekler. Bu \u00e7er\u00e7evede 1500 MW g\u00fcce sahip ve in\u015fa halinde olan 4000 MW kapasiteli proje ile birlikte deniz\u00fcst\u00fc r\u00fczgar varl\u0131klar\u0131 da birle\u015ftirilecektir.<\/p>\n<p>EDP firmas\u0131n\u0131n yenilenebilir enerji b\u00f6l\u00fcm\u00fc olan EDP Renovaveis (EDPR) arac\u0131l\u0131\u011f\u0131 ile kat\u0131l\u0131m sa\u011flayaca\u011f\u0131 ortakl\u0131k, 2025&#8217;e kadar i\u015fletme veya in\u015faat alan\u0131nda toplam da 5-7 GW g\u00fcce sahip proje ile \u00e7al\u0131\u015fmalar\u0131na ba\u015flayacak olup ileri zamanlarda ise bu g\u00fcc\u00fcn 5-10 GW&#8217;a \u00e7\u0131kmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Sarp ALTINEL &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Frans\u0131z Devleti&#8217;ne ait bir kurulu\u015f olan Engie ve Portekizli EDP taraf\u0131ndan Danimarka&#8217;l\u0131 Orsted \u015firketinden sonra d\u00fcnyan\u0131n 2&#8217;inci deniz\u00fcst\u00fc (offshore) r\u00fczg\u00e2r enerjisi geli\u015ftiricisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93197,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[51292,51288,46125,51290,48657,34533,27007,51291,67,1009,25448,51289,51287,430,34977,26829],"views":579,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93195"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93195"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93195\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93197"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}