{"id":93147,"date":"2019-05-23T16:40:45","date_gmt":"2019-05-23T13:40:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93147"},"modified":"2019-05-25T23:01:34","modified_gmt":"2019-05-25T20:01:34","slug":"izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak\/","title":{"rendered":"(Turkish) \u0130zmir Fo\u00e7a\u2019ya 24 MW G\u00fcc\u00fcnde Biyok\u00fctle Santrali Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93147\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>&#8216;Erdem Alia\u011fa Enerji&#8217; taraf\u0131ndan \u0130zmir \/ Fo\u00e7a&#8217;da orman kesim ve tar\u0131m hasat at\u0131klar\u0131ndan elektrik \u00fcretmeye y\u00f6nelik 24 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-93299\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/izmir-focaya-24-mw-guce-sahip-biyokutle-santrali-kurulacak.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>MW g\u00fcc\u00fcnde biyok\u00fctle enerji santrali kurulacak.<\/h1>\n<p>Erdem Alia\u011fa Enerji \u00dcretim A.\u015e.&#8217;nin <strong>25MWm\/24MWe\/85MWt<\/strong> g\u00fcce sahip olan Fo\u00e7a BES (Biyok\u00fctle Enerji Santrali) kurulup i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>95 milyon lira yat\u0131r\u0131m bedeline sahip projeyle y\u0131lda 140 bin ton orman kesim at\u0131klar\u0131, tar\u0131msal hasat at\u0131klar\u0131ndan 168.000.000 kWh\/y\u0131l elektrik \u00fcretimi ger\u00e7ekle\u015ftirilecektir. \u00dcretim esnas\u0131nda meydana gelen at\u0131k \u0131s\u0131 ise projenin kesme \u00e7i\u00e7ek yeti\u015ftirilen <strong>10 d\u00f6n\u00fcm<\/strong> seran\u0131n \u0131s\u0131t\u0131lmas\u0131na y\u00f6nelik kullan\u0131lacak.<\/p>\n<p>Fo\u00e7a BES projesi kapsam\u0131nda b\u00f6lgede yer alan yakla\u015f\u0131k 90.000 (dekar) d\u00f6n\u00fcm arazi an\u0131z yak\u0131m\u0131ndan kurtar\u0131larak arazideki pamuk ve danelik m\u0131s\u0131r saplar\u0131 \u00e7ift\u00e7ilerden herhangi bir \u00fccret talebi olmadan tarlalardan toplanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. &#8216;Erdem Alia\u011fa Enerji&#8217; taraf\u0131ndan \u0130zmir \/ Fo\u00e7a&#8217;da orman kesim ve tar\u0131m hasat at\u0131klar\u0131ndan elektrik \u00fcretmeye y\u00f6nelik 24 MW g\u00fcc\u00fcnde biyok\u00fctle enerji santrali [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93299,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[51253,23885,35144,35143,35145,45785,35122,41926,34979,34980,26353,19,67,1009,51252,51250,51251,51254,34977,26829],"views":1951,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93147"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93147"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93147\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93299"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}