{"id":93141,"date":"2019-05-23T16:21:12","date_gmt":"2019-05-23T13:21:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93141"},"modified":"2019-05-23T16:25:23","modified_gmt":"2019-05-23T13:25:23","slug":"teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu\/","title":{"rendered":"(Turkish) Teksin Enerji&#8217;den Karaman\u2019a 33 MW&#8217;l\u0131k G\u00fcne\u015f Santrali (GES) Kurulumu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93141\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><img loading=\"lazy\" class=\"alignleft size-medium wp-image-93143\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mwlik-gunes-santrali-ges-kurulumu.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<h1>Teksin Enerji taraf\u0131ndan Karaman\u2019da 33 MW g\u00fcce sahip g\u00fcne\u015f enerji santrali (ges) kurularak i\u015fletilecektir.<\/h1>\n<p>Teksin Enerji \u00dcretim San ve Tic. A.\u015e.&#8217;nin Karaman \u0130li, Merkez il\u00e7esinde yer alacak olan 33,124 MW\u00a0 g\u00fcce sahip olacak Teksin G\u00fcne\u015f Enerjisi Santrali\u2019ni kurarak i\u015fletmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>114,3 milyon liral\u0131k yat\u0131r\u0131m bedeline sahip ges projesi ile 66.254.736 kWh elektrik \u00fcretilmesi planlan\u0131rken ekonomik \u00f6mr\u00fcn\u00fcn 49 y\u0131l olmas\u0131 planlanan tesiste kurulum s\u00fcrecinin ise 6 ay i\u00e7inde tamamlanaca\u011f\u0131 belirtilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Teksin Enerji taraf\u0131ndan Karaman\u2019da 33 MW g\u00fcce sahip g\u00fcne\u015f enerji santrali (ges) kurularak i\u015fletilecektir. Teksin Enerji \u00dcretim San ve Tic. A.\u015e.&#8217;nin Karaman [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[34979,34980,26353,19,67,1009,23416,23133,34925,23131,1679,51001,51248,51000,34977,51249,26829],"views":1657,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93141"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93141"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93141\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93143"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}