{"id":93133,"date":"2019-05-23T16:03:21","date_gmt":"2019-05-23T13:03:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=93133"},"modified":"2019-05-23T16:08:22","modified_gmt":"2019-05-23T13:08:22","slug":"english-yeka-res-2-yarismasi-30-mayista-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/english-yeka-res-2-yarismasi-30-mayista-yapilacak\/","title":{"rendered":"(Turkish) &#8217;YEKA RES 2&#8242; Yar\u0131\u015fmas\u0131 30 May\u0131s\u2019ta Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/93133\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Yenilenebilir enerji kaynak alan\u0131 (YEKA) r\u00fczgar santrali lisans ihalesinin 2&#8217;incisi 30 May\u0131s 2019&#8217;da ger\u00e7ekle\u015ftirilecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-93136\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/yeka-res-2-yarismasi-30-mayista-yapilacak-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/yeka-res-2-yarismasi-30-mayista-yapilacak-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/yeka-res-2-yarismasi-30-mayista-yapilacak-500x272.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/yeka-res-2-yarismasi-30-mayista-yapilacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/yeka-res-2-yarismasi-30-mayista-yapilacak.jpg 735w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan r\u00fczgar enerjisine dayal\u0131 yenilenebilir enerji kaynak alanlar\u0131 ve ba\u011flant\u0131 kapasitelerinin tahsisine ili\u015fkin yar\u0131\u015fmalara (YEKA RES 2 ihaleleri) y\u00f6nelik bir duyuruda bulundu.<\/p>\n<p>\u0130hale&#8217;ye y\u00f6nelik\u00a0<strong>18 Nisan 2019<\/strong>&#8216;a kadar toplanan ba\u015fvuru dosyalar\u0131 <strong>Yar\u0131\u015fma Komisyonu<\/strong> taraf\u0131ndan de\u011ferlendirilmi\u015f olup yar\u0131\u015fmalar teklif sahiplerinden\u00a0<strong>Yetkili Temsilcileri<\/strong>&#8216;nin kat\u0131l\u0131mlar\u0131 ile\u00a0<strong>30 May\u0131s 2019<\/strong>&#8216;da Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131, <strong>E-Blok \/ 1 No<\/strong>\u2019lu <strong>Toplant\u0131 Salonu<\/strong>\u2019nda yap\u0131lacak olup ihaleler, <strong>saat 10:00<\/strong>\u2019dan itibaren<strong> Ayd\u0131n, Mu\u011fla, Bal\u0131kesir<\/strong> ve <strong>\u00c7anakkale<\/strong> b\u00f6lgeleri i\u00e7in s\u0131ras\u0131 ile ger\u00e7ekle\u015ftirilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yenilenebilir enerji kaynak alan\u0131 (YEKA) r\u00fczgar santrali lisans ihalesinin 2&#8217;incisi 30 May\u0131s 2019&#8217;da ger\u00e7ekle\u015ftirilecek. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan r\u00fczgar enerjisine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93136,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[51247,7179,3613,4427,67,1009,1972,3089,35002,24949,23318,34961,35035,34960,34977,51246,25578,51245,40533,26829,32138,31711],"views":1280,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93133"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=93133"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93133\/revisions"}],"predecessor-version":[{"id":93134,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/93133\/revisions\/93134"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/93136"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=93133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=93133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=93133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}